Case Study 1 Global Value Chain
Case Study 1 Global Value Chain
Case Study:-1
Metrovox – Global Value Chain
Management and Strategic
Sourcing
BY:-
Dhruv Patel:- 041103641
TO Professor:-
JamesHuget
(1) Based on the risk factors associated with the Bugabyte and the Bugabyte Lite, which
product do you think Grunwald and Vogel will recommend as the best candidate for
assembly outsourcing?
The Bugabyte, as a relatively new product with increasing production delays due to its video
capability, presents challenges in meeting delivery schedules and has a 30 per cent late delivery
rate. In contrast, Bugabyte Lite has a stable sales history over the past two years, right
forecasting, and a well-established assembly process, making it a more suitable candidate for
outsourcing. This decision aligns with the goal of addressing Metrovox's late delivery rates and
ensuring a reliable supply chain. By outsourcing out the assembly of Bugabyte Lite, Metrovox
can better meet delivery deadlines and efficiently manage schedules. This choice keeps the
business competitive in the market and keeps a constant standard of product quality.
(2) Based on Grunwald and Vogel’s decision, what will be the benefits and disadvantages of
Advantages: -
The potential advantages of outsourcing the production of the Bugabyte product are significant
Firstly, by focusing on the development of the new Bugabyte product, the company may be able
to minimize production error margins, ensuring a higher quality product is delivered to the
market.
Secondly, outsourcing allows for greater control over the cost and delivery time of the product,
enabling the company to keep a steady supply chain and avoid delays in product delivery.
customers.
Disadvantages: -
One of the primary disadvantages is the potential loss of control over intellectual property, the
(3) If Metrovox can outsource the assembly of the circuit boards to an existing supplier,
discuss the key contract issues Metrovox will need to consider with its supplier.
merchants and USA distributors, the manufacturer and the new supplier must coordinate on
delivery schedules for Metrovox products. Under these contracts, it is stipulated that Bugabyte
Intellectual property right: - The contract must include strong intellectual property protection
measures since Metrovox uses confidential information for circuit board testing. This guarantees
Payment Method: - They must review their current payment and documentation processes and
establish what will change when the supplier assumes responsibility for the assembly process.
dissatisfaction with the arrangement. This will ease a seamless shift and
(4) Which inventory management strategy should Grunwald and Vogel recommend
Metrovox adopt to ensure efficiencies throughout its entire supply chain? Why?
Metrovox will oversee and coordinate the inventory of completed circuit boards on behalf of the
supplier, considering both customer demand and predefined minimum and maximum levels.
Metrovox can accurately predict demand for this product due to Bugabyte Lite's consistent sales
over the past two years, making it an ideal candidate for a vendor-managed inventory (VMI)
system. In addition, the reason to use this strategy is that Metrovox created the
Bugabyte product that is presently on the market, which has 300% greater
(EDI) system for the exchange of quality testing information, which will
Casestudyfitcostandriskmodulesgvcdocumentmanagementanswersheet0.
(n.d.). Retrieved from www.coursesidekick.com/:
https://www.coursesidekick.com/management/451175
Metrovox - Bugabyte and Bugabyte Lite Products . (2018, 05). Retrieved from
www.essaysforstudent.com :
https://www.essaysforstudent.com/Business/Metrovox-Bugabyte-and-
Bugabyte-Lite-Products/109503.html