0% found this document useful (0 votes)
6 views

Timesheet Form

File

Uploaded by

Tên Duy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Timesheet Form

File

Uploaded by

Tên Duy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

PTSC OFFSHORE SERVICES

TIMESHEET
PROJECT: CA MAU GAS PROCESSING PLANT PROJECT (PACKAGE-1)
LOCATION: CMGPP CONSTRUCTION SITE
DESCRIPTION : RE-INSTALLATION E1205/1206 WITH NEW STRUCTURAL SUPPORT DUE TO WRONG DESIGN FROM PEN
START DATE: 11/27/2016 FINISH DATE:27/11/16
I. Equipments

Total
No Description QTY Working area Remark
(hour)

### Crane 50 tones ### CMGPP SITE ###


### Crane 15 tones ### CMGPP SITE ###
II. Labour
Total
No Description QTY Working area Remark
(hour)
### Mechanical Engineer ### CMGPP SITE ###
### Mechanical Supervisor ### CMGPP SITE ###
### Signal man for Crane ### CMGPP SITE ###
### Rigger ### CMGPP SITE ###
### Crane Operation ### CMGPP SITE ###

### worker ### CMGPP SITE ###

### Leader ### CMGPP SITE ###

### HSE ### CMGPP SITE ###

Prepared by Approved by PTSC/PEN

Name: Name:
Signature: Signature:

Tile: Tile:
Company Company
PTSC OFFSHORE SERVICES

TIMESHEET
PROJECT: CA MAU GAS PROCESSING PLANT PROJECT (PACKAGE-1)
LOCATION: CMGPP CONSTRUCTION SITE
DESCRIPTION : REMOVAL OF METAL PACKING IN BED #2 T1501 DUE TO WRONG INSTRUCTION FROM PEN/UOP
START DATE: 11/1/2016 FINISH DATE:01/11/16
I. Equipments

Total
No Description QTY Working area Remark
(hour)

### Crane 550 tones ### CMGPP SITE ###


II. Labour
Total
No Description QTY Working area Remark
(hour)
### Mechanical Engineer ### CMGPP SITE ###
### Mechanical Supervisor ### CMGPP SITE ###
### Signal man for Crane ### CMGPP SITE ###
### Rigger ### CMGPP SITE ###
### Crane Operation ### CMGPP SITE ###

### worker ### CMGPP SITE ###

### Leader ### CMGPP SITE ###

### HSE ### CMGPP SITE ###

Prepared by Approved by PTSC/PEN

Name: Name:
Signature: Signature:

Tile: Tile:
Company Company
PTSC OFFSHORE SERVICES

TIMESHEET
PROJECT: CA MAU GAS PROCESSING PLANT PROJECT (PACKAGE-1)
LOCATION: CMGPP CONSTRUCTION SITE
RE-INSTALLATION LOCAL CONTROL PANEL FOR FIREWATER PUMP DUE TO WRONG DESIGN
DESCRIPTION :
FROM PEN/PTSC
START DATE: 11/30/2016 FINISH DATE:30/11/16
Total
No Description QTY Working area Remark
(hour)
### Mechanical Engineer ### CMGPP SITE ###
### Mechanical Supervisor ### CMGPP SITE ###
### Signal man for Crane ### CMGPP SITE ###
### Rigger ### CMGPP SITE ###
### Crane Operation ### CMGPP SITE ###

### worker ### CMGPP SITE ###

### Leader ### CMGPP SITE ###

### HSE ### CMGPP SITE ###

Prepared by Approved by PTSC/PEN

Name: Name:
Signature: Signature:

Tile: Tile:
Company Company
PTSC OFFSHORE SERVICES

TIMESHEET
PROJECT: CA MAU GAS PROCESSING PLANT PROJECT (PACKAGE-1)
LOCATION: CMGPP CONSTRUCTION SITE
FABRICATION & INSTALLATION STRUCTURAL SUPPORT DUE TO WRONG DESIGN/FABRICATION
DESCRIPTION :
FROM PEN/PTSC
START DATE: FINISH DATE:
I. Equipments

Total
No Description QTY Working area Remark
(hour)

### Crane 15 tones ### CMGPP SITE ###


II. Labour
Total
No Description QTY Working area Remark
(hour)
### Mechanical Supervisor ### CMGPP SITE ###
### Rigger ### CMGPP SITE ###
### Crane Operation ### CMGPP SITE ###

### worker ### CMGPP SITE ###

### HSE ### CMGPP SITE ###

Prepared by Approved by PTSC/PEN

Name: Name:
Signature: Signature:

Tile: Tile:
Company Company
PTSC OFFSHORE SERVICES

TIMESHEET
PROJECT: CA MAU GAS PROCESSING PLANT PROJECT (PACKAGE-1)
LOCATION: CMGPP CONSTRUCTION SITE
MODIFY & RE-INSTALLATION STRUCTURAL SUPPORT OF H1741 DUE TO WRONG
DESCRIPTION :
DESIGN/FABRICATION FROM PEN/PTSC
START DATE: 12/1/2016 FINISH DATE:01/12/16
I. Equipments

Total
No Description QTY Working area Remark
(hour)

### Crane 15 tones ### CMGPP SITE ###


II. Labour
Total
No Description QTY Working area Remark
(hour)
### Mechanical Supervisor ### CMGPP SITE ###
### Rigger ### CMGPP SITE ###
### Crane Operation ### CMGPP SITE ###

### worker ### CMGPP SITE ###

### HSE ### CMGPP SITE ###

Prepared by Approved by PTSC/PEN

Name: Name:
Signature: Signature:

Tile: Tile:
Company Company
PTSC OFFSHORE SERVICES

TIMESHEET
PROJECT: CA MAU GAS PROCESSING PLANT PROJECT (PACKAGE-1)
LOCATION: CMGPP CONSTRUCTION SITE
RE-ALIGNMENT FOR FIRE WATER PUMP DUE TO WRONG
DESCRIPTION :
DESIGN/FABRICATION FROM PEN'S VENDOR
START DATE: FINISH DATE:

Total
No Description QTY Working area Remark
(hour)
### Mechanical Engineer ### CMGPP SITE ###
### Mech Tech team leader ### CMGPP SITE ###
### Mech Tech ### CMGPP SITE ###

Prepared by Approved by PEN

Name: Name:
Signature: Signature:

Tile: Tile:
Company Company
TIMESHEET
PROJECT: VETAG 8
DESCRIPTION : Cung Cấp Nhân Lực
NỘI DUNG CÔNG VIỆC:
DATE: 24/09/2024

Hành chính Thêm giờ Tổng cộng


TT Nội dung công việc ĐVT Số lượng Chủ nhật (Giờ) Ghi chú
(Giờ) (Giờ) (Giờ)

1 Nguyễn Trường Duy Người 1 12 12.0

Prepare by: Approved by


BÊN B BÊN A

Name: Name:

Signature: Signature:

Company Company
TIMESHEET
PROJECT: VETAG 8
DESCRIPTION : Cung Cấp Nhân Lực
NỘI DUNG CÔNG VIỆC:
DATE: 25/09/2024

Hành chính Thêm giờ Tổng cộng


TT Nội dung công việc ĐVT Số lượng Chủ nhật (Giờ) Ghi chú
(Giờ) (Giờ) (Giờ)

1 Nguyễn Trường Duy Người 1 12 12.0

Prepare by: Approved by


BÊN B BÊN A

Name: Name:

Signature: Signature:

Company Company
TIMESHEET
PROJECT: VETAG 8
DESCRIPTION : Cung Cấp Nhân Lực
NỘI DUNG CÔNG VIỆC:
DATE: 26/09/2024

Hành chính Thêm giờ Tổng cộng


TT Nội dung công việc ĐVT Số lượng Chủ nhật (Giờ) Ghi chú
(Giờ) (Giờ) (Giờ)

1 Nguyễn Trường Duy Người 1 12 12.0

Prepare by: Approved by


BÊN B BÊN A

Name: Name:

Signature: Signature:

Company Company

You might also like