Flow Velocity Dia.
Flow Velocity Dia.
2.45.32 9.02 (*) Foam system (2) for fuel tank room , L.M 1
1 foam bladder tank filled with
30gallons.
2.45.35 10.01 (*) CO2 system (6) for ATS Room, 5 L.M 1
Cylinders filled with 45 kg.
Note Note Details
2.45.36 15375 FM‐200 SYSTEMS
2.45.37 11 Supplying, installing, connecting, testing and commissioning
For FM‐200 system complete including cylinders, manifolds,
nozzles, piping work, detectors, alarm horns, flashing
devices, switches, batteries, enunciators, manual pull
stations and control cabinets all as specified and as shown
on drawings
2.45.38 11.01 (*) FM‐200 System (1) for main Security room,one cylinder L.M 1
2.45.39 11.02 filled
(*) FMwith
‐20041 kg (2) for main IT
System L.M 1
room,one cylinder filled with 20kg
Note Note Details
2.45.40 15375 FIRE STANDPIPE SYSTEMS
2.45.41 12 Supplying, installing, connecting and testing of fire hose
station (FHS) consisting of 40mm brass angle valve, fire hose
reel,25mm fire hose 30m long, nozzle steel cabinet,65 mm
diam. fire department landing valves,65mm fire hose 30m
long
2.45.44 12.01 (*) Manual hand held fire extinguisher(ABC) 6kg NUMBER 39
2.45.45 12.02 (*) Manual hand held fire extinguisher(CO2) 6kg NUMBER 17
2.45.46 12.03 (*) Mobile Foam Fire extinguisher 90Lit NUMBER 2
Note Note Details
2.45.47 13 Supply, install, connect and test of automatic dry powder
fire extinguishers to be installed in electrical and
mechanical rooms ,all other accessories as specified and as
indicated on the drawings.
2.46.11 2.01 (*) Manual hand held fire extinguisher(ABC) 6kg NUMBER 35
2.46.12 2.02 (*) Manual hand held fire extinguisher(CO2) 6kg NUMBER 2
Note Note Details
2.46.13 3 Supply, install, connect and test of automatic dry powder
fire extinguishers to be installed in electrical and
mechanical rooms ,all other accessories as specified and as
indicated on the drawings.
2.47.35 11.01 (*) Electrical Pump (1250 GPM, 150 PSI) NUMBER 1
Note Note Details
2.47.36 15320 DIESEL FIRE PUMP
2.47.37 12 Supplying, installing, connecting, testing and commissioning
an automatic, factory assembled wired and tested Diesel
engine driven fire pump system consisting of the pump,
engine, relief valve , and controller, all mounted on a
common base,pump,engine,and controller shall be tested
prior to shipment. Fire pump shall be horizontal split case
bronze fitted, double suction, centrifugal having a design
capacity of 1000 GPM at a design head ,of 150 PSIG TDH
2.47.39 12.01 (*) Diesel Fire Pump (1250 GPM, 150 NUMBER 1
PSI)
Note Note Details
2.47.40 15320 JOCKEY FIRE PUMP
2.47.41 13 Supplying, installing, connecting, testing and commissioning
an automatic packaged vertical multi‐ stage jockey pump
having a design cap. of 25 Gpm at a design head of 160 PSIG
TDH, complete including but not limited to the UL listed
Item Code Description Unit of Quantity/
Measurem Base
ent Price
2.47.42 13.01 (*) Jockey Fire Pump ( 25 GPM, 160 PSI) NUMBER 1
Note Note Details
2.47.43 15360 CARBON DIOXIDE EXTINGUISHING SYSTEM
2.47.44 14 Supplying, installing, connecting, testing and commissioning
CO2 total flooding automatic fire extinguishing system
complete including cylinders, manifolds, nozzles, piping
work, detectors, alarm horns, flashing devices, switches,
batteries, enunciators, manual pull stations and control
cabinets all as specified and as shown on drawings:
2.47.45 14.01 (*) CO2 system (1) for Chiller Sub TR Room , 5 Cylinders L.M 1
2.47.46 14.02 filled
(*) CO2with 45 kg.(2) for Switch Gear room , 10 Cylinders filled L.M
system 1
2.47.47 14.03 with
(*) CO245 system
kg. (3) for Chiller substation L.M 1
MDB Room, 8 Cylinders filled with 45 kg.
2.47.48 14.04 (*) CO2 system (4) for Transformer area L.M 2
, 3 Cylinders filled with 45 kg.
2.47.49 14.05 (*) CO2 system (5) for Main Distribution Board , 3 Cylinders L.M 2
Note filled
Note with 45 kg.
Details
2.47.50 15375 FIRE STANDPIPE SYSTEMS
2.47.51 15 Supply, install, connect and test of dry chemical multi
purpose manual, portable, hand held, fire extinguishers to
be installed all around the building and to be used
mechanical rooms and CO2 fire extinguishers to be used in
electrical rooms all as specified and as shown on drawings.
2.47.59 18.01 (*) spare parts for fire protection system L.M 1
Note Note Details
2.47.60 19 Including builder's work as required by the above specified
systems including, but not limited to, the following: holes,
mortises, chases and the like required in the structure and
for all necessary sleeves, anchors. base plates, isolation
2.48 HVAC
Note Note Details
2.48.1 15020 General notes:
2.48.2 1 Supply installation and commissioning of a complete system
of Air condition system, ductwork, all piping, fittings as
herein specified and shown on plans. Price for system shall
include all required equipment accessories, pipe sleeves &
Escutcheons, Equipment identification, tools & spare parts,
protective painting of all systems .etc. Specification,
drawings, and bill of quantities are complimentary and are
to be taken together for complete interpretations of the
work.
2.48.14 3.01 (*) (E.A.F‐01)‐(8460 L/S / 11300 L/S) ‐ (Typical E.A.F‐01 to NUMBER 10
E.A.F‐10)
2.48.15 3.02 (*) (E.A.F‐11)‐(5850 L/S ) NUMBER 1
2.48.16 3.03 (*) (E.A.F‐12 )‐(50 L/S) NUMBER 1
2.48.17 3.04 (*) (E.A.F‐13 )‐(300 L/S) NUMBER 1
2.48.18 3.05 (*) (E.A.F‐14 )‐(200 L/S) NUMBER 1
2.48.19 3.06 (*) ( EAF‐15)‐(400 L/S) ‐ (Typical E.A.F‐ NUMBER 3
15 to E.A.F‐17)
2.48.20 3.07 (*) ( EAF‐18 )‐(3450 L/S) NUMBER 1
2.48.21 3.08 (*) (F.A.F‐01)‐(8460 L/S / 11300 L/S) ‐ (Typical F.A.F‐01 to NUMBER 4
F.A.F‐04)
2.48.22 3.09 (*) (F.A.F‐05)‐(6850 L/S ) NUMBER 1
Note Note Details
2.48.23 15932 AIR OUTLETS
2.48.24 4 Supply, installation, connection, testing and commissioning
of air registers such as
grilles , ceiling diffusers, linear slot diffusers from painted
aluminum section complete
with all accessories as specifications.
2.48.48 8.01.01 (*) Provide , install a fuel oil tank level monitoring and alarm NUMBER 1
system for emergency generator fuel oil tanks including :‐
‐Remote electronic tank gauge
‐ Fill alarm control
‐ Round alalrm bell size 100 mm
‐ Panels for high level alarm , low level alarm and rupture
alarm
‐ Theminals and daily contacts for interface of alarm to
building management system
‐ Float switch in each day tank rupture basin switch
‐ Weath proof alarm bell size 250 mm .
2.48.51 8.02.01 (*) provide anti ‐ siphon valve at high points of suction line L.M 1
and relief valves. Furnish and install a water tight street box.
Diesel fuel transfer system consisting of supply piping , over
flow piping , return piping and all parts and fittings required
for a complete installation . Fill Line Piping Drain piping to
nearest drain point . Direct reading type level gauge
Indication functions with large display , LED'S for ) fuel
level , power available , switch off ,pump running , low level
alarm , pump control
2.53.65 12.06 (*) SP‐11 & 12 Duplex Submersible waste Pump L.M 1
70 gpm & 25 psi
2.53.66 12.07 (*) SP‐13 & 14 Duplex Submersible waste Pump L.M 1
70 gpm & 25 psi
2.53.67 12.08 (*) SP‐17 & 18 Duplex Submersible waste Pump L.M 1
70 gpm & 25 psi
Note Note Details
2.53.68 13 Including builder's work as required by the above specified
systems including, but not limited to, the following: holes,
mortises, chases and the like required in the structure and
for all necessary sleeves, anchors. base plates, isolation
2.54 Plumbing BOQ ‐ Buildings
Note Note Details
2.54.1 15410 PLUMBING PIPING AND FITTING MATERIALS
2.54.2 1 Supply, install, connect, and test of (PPR) piping systems (PN
20) for Domestic cold water inside building for toilet,
kitchen and all services complete with water hammer
arrestors, automatic air vent including fittings , supports ,
hangars and fittings and all other accessories and as shown
on drawings. . ( all Dia. of pipes inner Dia.)
2.55.7 3 Supply, install, connect and test all soil, waste, storm and
vent (UPVC) PN.10 vertical & horizontal piping system above
ground piping from all
plumbing fixtures to outside the building complete including
clean outs fittings, roof vent caps, couplings, supports,
hangers , traps and all other accessories as specified and as
shown on drawings. ( all Dia. of pipes inner Dia.)
2.55.35 9.01 (*) ‐ Water Meter 150 mm Dia . (Supply by Employer) NUMBER 1
Note Note Details
2.55.36 15425 Pump Room Water Piping System
Item Code Description Unit of Quantity/
Measurem Base
ent Price
2.55.37 10 (*) Supply, install, connect and test all piping system for L.M 1
plumbing and fire within pump room complete including
but not limited to pipes, fittings, flanges & unions, flexible
connection, valves, check valves, relife valves, sand basin,
insulation & cladding and all other accessories as per specs
and as shown on drawings (take into consideration that all
the valves charged on pumps items are not included in this
item).
2.55.57 17.01 (*) Triplex set each of (200Gpm ,80Psi ) ( 2w+1SB). L.M 1
Note Note Details
2.55.58 15453 Underground Submersible Pump
Systems
2.55.59 18 Supply,install,connect, test and commissioning of sump
pumps complete including pumps IP68,cutter vanes,gate
valves,check valves, control panel with siren, sedimentation
flush valve, spare parts, guide rod and chain, venting
Item Code Description Unit of Quantity/
Measurem Base
ent Price
2.55.60 18.01 (*) SP‐15 & 16 Duplex Submersible waste Pump L.M 1
150 gpm & 25 psi
Note Note Details
2.55.61 19 Including builder's work as required by the above specified
systems including, but not limited to, the following: holes,
mortises, chases and the like required in the structure and
for all necessary sleeves, anchors. base plates, isolation
Q 1700 m3/d
V 1 1.5 2
A 0.019676 0.013117 0.009838
D2 0.025065 0.01671 0.012532
D (m) 0.158319 0.129267 0.111948
D (mm) 158.3189 129.2668 111.9484
Q 1000 m3/d
V 1 1.5 2
A 0.011574 0.007716 0.005787
D2 0.014744 0.009829 0.007372
D (m) 0.121425 0.099143 0.08586
D (mm) 121.4251 99.14314 85.86048
Q 500 m3/d
V 1 1.5 2
A 0.005787 0.003858 0.002894
D2 0.007372 0.004915 0.003686
D (m) 0.08586 0.070105 0.060713
D (mm) 85.86048 70.10479 60.71253
m3/day
2.5 3 3.5
0.00787 0.006559 0.005622
0.010026 0.008355 0.007161
0.10013 0.091405 0.084625
100.1297 91.40546 84.62501
m3/day
2.5 3 3.5
0.00463 0.003858 0.003307
0.005898 0.004915 0.004213
0.076796 0.070105 0.064904
76.79595 70.10479 64.90442
m3/day
2.5 3 3.5
0.002315 0.001929 0.001653
0.002949 0.002457 0.002106
0.054303 0.049572 0.045894
54.30293 49.57157 45.89436