0% found this document useful (0 votes)
20 views2 pages

Certificate of Completion

COMPLETION CERTIFICATE

Uploaded by

enggrowadhq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views2 pages

Certificate of Completion

COMPLETION CERTIFICATE

Uploaded by

enggrowadhq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SUBCONTRACT CERTIFICATE OF COMPLETION

FOR THE WHOLE OF THE WORKS

SCC Ref: UAF-TCT-10000-SCC-AR-00001 Date: 15-Feb-23

Bahadir Construction
Project: Contractor:
Accommodation and Supporting Facilities at Al Udeid Air Base (Z-125-01) Engineering Contracting &
Trading Inc. Co.
Subcontractor Top Thanjai Contracting & Trading Subcontract Ref.
UAF-TCT-10000-SC-AR-00001
: W.L.L. No:
Scope of
Workmanship For Kerbstones & Interlock Paving Works
Works:
Actual
Commenceme Original
20 July 2020 30-May-2021 Completion 30-Jun-2021
nt Date: Completion Date:
Date:

Subcontractor: Top Thanjai Contracting & Trading W.L.L.

This is to certify that the above works have been inspected on 30 June 2021 . All work has been satisfactorily

completed and is accepted subject to the terms and conditions of the Contract and Specifications. The
01-Jul-2021
effective start date of the Period of Maintenance (if applicable) is . The Completion date for this
30-Jun-2021
work is

Signed on behalf of the Contractor

Name: Selçuk Akan

Position: Site Manager

Company Stamp:

Doc. No.: BAH-CON-F13 Rev. No.: 02 Rev. Date: 27-Oct-2020 Page 1 of 2


SUBCONTRACT CERTIFICATE OF COMPLETION
FOR THE WHOLE OF THE WORKS

Doc. No.: BAH-CON-F13 Rev. No.: 02 Rev. Date: 27-Oct-2020 Page 2 of 2