Project Profile 1
Project Profile 1
Spreading perfection...
...in Indian industries
SUBHCREATION INTERIOR MONK PVT. LTD. has established a group-wide practice of setting
and maintaining the highest possible Quality and HSE standards while giving equal value with
other business objectives without compromising the Customer satisfaction.
SUBHCREATION INTERIOR MONK PVT. LTD. is an association of young director with proven
track record in Oil and Gas industry (Specially in Mechanical, Electrical / Instrumentation and
Civil works), setting up a high-standards in the industry in terms of productivity with zero re-
work, paying meticulous attention towards safety] and improving safety standards every
second to make it is as culture of work force.
SUBHCREATION INTERIOR MONK PVT. LTD. main strength is own technical and skilled man
power working 24X7 to reach "Clients Goal and Mile Stones" to achieve business objective. This
helped SUBHCREATION INTERIOR MONK PVT. LTD. capturing
more Contracts last few years lucidly adding jewel to their
crown really shows the strategic approach in expanding the
Why
business.
SUBHCREATION??
SUBHCREATION INTERIOR MONK PVT. LTD. core strength is not
only in construction ( Fabrication / Erection and Testing ) but Technical
key strength is also in completing the Pre-Commissioning and
Commissioning activities within defined time frame, delivered Competency
number Sub- stations (33Kv / 11KV ,33Kv / 6.6KV ), Process Operational Excellence
Systems ( including final sign-off Final Cause and Effects
document and handing over CCR ), Static and Rotary Equipment Commitments towards
load testing before introducing hydro carbons in tanks and
systems with an established permit to work system both in
Quality and Safety
Green fields and Brown fields with well-equipped in house Stable Financial
testing and calibration facilities.
Background
B K RAI
HSE
Implementing robust safety protocols to ensure workplace safety.
Providing continuous safety training for employees to prevent accidents.
Prioritizing the well-being of employees with health programs and assistance.
Adhering to environmental regulations and promoting sustainability efforts.
Regularly conducting risk assessments and taking preventive measures.
Maintaining a safe and clean working environment to prevent health hazards.
Encouraging open communication channels for reporting safety concerns.
Monitoring and improving safety performance through audits and feedback mechanisms.
To provide adequate control of the health and safety risks arising from our work activities.
To consult with our employees on matters affecting their health and safety.
To provide and maintain safe plant and equipment.
To ensure safe handling and use of substances.
To provide information instruction and supervision for employees.
To ensure all employees are competent to do their tasks and to give them adequate
training.
To prevent accidents and cases of work-related ill-health.
To maintain safe and healthy working conditions.
To review and revise this policy as necessary at regular intervals.
Committed to:
Providing customers with high quality construction, pre- commissioning, commissioning
services which meet requirements and are fit for their purpose.
Operating business to the quality systems required by international standards and various
government regulations.
Enhancing the skills of management and staff through review and actively pursuing an on-going
training policy, the objective of which is to prepare staff to perform their work more effectively
and efficiently.
Promoting the culture of continual quality improvements and the philosophy of getting things
“right first time”. Rigorously controlling the supply, installation and completion program of all
projects.
Promoting the quality management systems and ensuring implementation is achieved by
internal auditing, management review, corrective and preventive action.
Everyone is responsible for the quality within the company and for maintaining high standards.
focus on expertise capability,
training, safety, performance…
Constructions services
We provide a broad range of field construction services that include modular and conventional
construction, project management, construction inspection and management, scheduling,
welding and quality assurance, plant start-ups and commissioning. In addition to new
construction work, our projects have included plant relocations, retrofits, disassembly,
upgrades, de-bottlenecking and shutdowns.
Our resources are supported by a fleet of cranes and vehicles and an extensive range of welding,
rigging, mechanical and piping equipment’s and Electrical and instrumentation facilities.
We have an extensive range of general and specific procedures, work instructions and check
sheets to support construction execution. Our extensive range of qualified welding procedures
coupled with stringent weld control ensures optimum weld quality.
PIPING/STRUCTURAL
Pipe Fabrication & Erection
Structural Fabrication & Erection
Cross country pipeline
Specialized welding like DSS, IBR, SS-316L
Insulation Cold & Hot
Hydro testing
EQUIPMENT
Various types Rotary equipment erection & alignment
Static equipment erection & alignment
E&I
Control room equipment installation like DCS, Marshaling panels, server panel
Switch gear installation
Transformer installation
Lighting system installation both indoor & out door
Building Automation Systems
Fire & gas Detection & Protection systems
Fire suppression & fighting systems
Unit UCP/PLC panel installation
Telecom
PA / GA systems
Access control system
CCTV
IDS (Intrusion system)
Pre-Commissioning Services
Mechanical
Low /High pressure leak testing of all systems after re-instatement.
Flushing of pipe work.
Vessel cleaning and inspection.
Systems dry out.
Air Blowing of pipe work to remove dirt and debris.
Equipment inspection.
Chemical Cleaning / sterilization of potable water systems.
Process chemicals (e.g. molecular sieve material, mercury absorbent, etc.).
Removal of ‘gags’ and setting of spring supports
Final vessel internal inspections and boxing up
Filling of systems with lubricants (under supervision of commissioning team)
Installation of car seals and other locks – Needs confirmation
Reinstatement of all gate, globe and check valves, as required, with new gaskets and refurbished
bolts
Rupture disc installed- Needs confirmation
Installation of temporary strainers as required Filling of vessels with solid Calibration checks
various types Pigging
Final alignment of rotating machinery.
Reinstatement, of analyzers, flow-meters and Thermo wells (Pipe work re-Instatement may also
be a condition of accepting the RFC).
E&I
Megger and continuity checks of power, instrument, electrical cables.
Hi-Pot testing of HT cables and switch gear
Switch gear Primary/secondary injection testing.
Testing of set-points, alarms and shutdowns.
Stroking of Control Valves, Emergency Shutdown Valves and Blow-down Valves
Solo run de-coupled electric motors.
DCS power – up & SAT activities (in presents of sys vendor)
Loop checking of various field instruments
C&E (cause & Effect testing and functional narrative testing
Building F&G system loop and function test.
Commissioning Services
Dynamic verifications that for each Plant elementary electrical, telecommunications, and
instrumental function, performs properly according to its design criteria. Typical examples of
such tests are electrical motors loaded runs; instrument loops tests, electrical breakers
operation. The energization of the electrical distribution network is part of this activity.
Running-in and on-line tests for a significant period of the plant utilities (electrical, air, HVAC,
water, crane, etc.), and wherever applicable, of the main process equipment in closed loop with
inert fluids. Witnessing and assistance from Operator is required to allow a smooth transfer of
the facilities from the Commissioning team to the Operator, in full confidence, and with all the
required safety.
Pre-Start-up activities: A number of activities related to, such as piping drying-out, chemical
cleaning, Process leak testing, and inerting, or loading of various chemicals and catalyst.
Commissioning encompasses all those activities required to prepare for a safe start-up of the
system. The handover process will be phased, and will include both full and part systems.
Commissioning activities are Performed on a System basis to approved company procedures
and include, but are not limited to the following:
Filling of systems with liquid process chemicals (e.g. Amine, Corrosion Inhibitor, Heating
medium etc.)
Instrument loop checks
Motor ‘bump’ tests
Uncoupled run testing of motors and logic testing
PSV testing, calibration, tagging & sealing
Testing and calibration of analyzers and flow-meters
ESD functional tests etc.
Load-Run tests of circulation pumps & systems (e.g. Amine, Heating medium etc.)
Filling of Firewater tanks
Charging Process Refrigeration System with refrigerant
Leak testing of all Systems at 1.1x operating pressure
Installation of blinds / spacers as per P&ID’s or to suit Start Up requirements
PROJECTS COMPLETED
Completed modular skid fabrication & commissioning at Mangala Well pads of Cairns India Ltd.
Rajasthan, Barmer under Google Arc Enterprises. in 3months.
Mechanical, pre-commissioning & commissioning at Mangala Processing Terminal, EPC 2 and
3, of Cairn India Ltd. Rajasthan, Barmer under Leighton Welspun from August 2013 to 15
December 2014.
Electrical and Instrumentation at Mangala Well pads of Cairn India Ltd.
Mechanical Manpower at Mangala Well pads of Cairn India Ltd.
Modular skid fabrication & erection Mangala well pads of Cairn India Ltd.
Fabrication, Erection & full construction of Modular Skid for Mangala & Aishwarya well pads of
Cairn India Ltd under Aarvi Encon Pvt. Ltd.
Fabrication, Erection full construction & commissioning of CPF Project Cairn India Ltd under
IETS Pvt. Ltd.
35 km firefighting line running from July 2016 under unique tech machine Ltd. In NTPC Kanti
(Muzafarpur) Bihar.
OUR CLIENTS
ORGANISATIONAL HIERARCHY
CEO
HR &
PROJECT HSE
FINANCE
DIRECTOR DIRECTOR
DIRECTOR
NIKHILESH YADAV
+91-9818596610