STEP01 Kick-Off Presentation 2023 APJ v2
STEP01 Kick-Off Presentation 2023 APJ v2
STEP01
Jennie Qi
Ashuta Sheth
Eu Jin Sie
Rohit Khan
Sep 2023
Customer
Agenda for today
➢ Program Overview
➢ Introductions
➢ System Conversion
➢ System landscape
➢ Call to action
➢ Q&A
Basis
Senior technical expert with experience in OS/DB migrations and upgrades.
Main tasks: Technical preparation for system conversion, SUM execution,
migration to HANA, Gateway configuration, FIORI initial configuration.
Hours of commitment: 50 hours (Presentation: ~20 and Hands-On: ~30)
Finance
Finance expert with experience in accounting.
Main tasks: Check consistency of finance data, period-end closing activities, posting
data snapshot, finance migration to ACDOCA, customizing migration for SAP
Accounting, credit management migration.
Hours of commitment: 30 hours (Presentation: ~20 and Hands-On: ~10)
Logistics
Logistics expert with a general understanding of Master data and MRP
Main tasks: Customer Vendor integration, MRP.
Hours of commitment: 30 hours (Presentation: ~20 and Hands-On: ~10)
ABAP (Optional)
Developer with experience in ABAP development and optimizations.
Main tasks: Check custom code for migration to S/4HANA, fix SPAU and SPDD,
and learn S/4HANA Extensibility options.
Hours of commitment: 10 hours (Presentation: ~5 and Hands-On: ~5)
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 5
Disclaimer & Important Information
▪ Hands-on experience in the technical and functional activities for doing a system
conversion
Objective Initial Kickoff call Prepare phase Prepare phase Prepare phase Realization phase
Technical Logistics Finance Technical Conversion
Content & • Program Overview • Readiness Check • Review STEP02 • Review STEP03 • Review STEP04
• Mutual Expectations • Maintenance Planner • Business Partner • Consistency Checks • Introduction to SUM
Activities • System Conversion • Simplification Items Concept • Reconciliation and DMO
Overview Check (tool) • Customer Vendor • Period-end and • Minimizing downtime
• System Environment • Custom Code Integration (CVI) Document Closing • Migrating to the cloud
• Q&A Analysis • MRP Activities with DMO with
• Q&A • MATNR Extension • Simplification Item System Move
• Simplification Item Check (FI-CO) • Q&A
Check (Logistics) • Q&A
• Q&A
Presentation (all) 2 hours 2 hours 2 hours 2 hours 2 hours
hands-on
effort for
activities
ABAP 1 hour
Finance 1 hour 4 hours
Logistics 1 hour 8 hours
Objective Realization phase Realization phase Realization phase Realization phase Review and Feedback
Finance migration SAP Fiori activation Logistics activities Custom Code Adaptation
& Extensibility
Content & • Review STEP05 • Review STEP06 • Review STEP07 • Review STEP08 • Review STEP09
• FI Customizing and • Overview of Fiori • Post Conversion • Custom Code • System Access
Activities Data Model Adaptation Deployment Options Logistics Activities Adaptation • JAM Group Access
• FI Data Migration • SAP Fiori apps • Optional: Configuration • S/4HANA Extensibility • Feedback
• Financial Position selection and Activation of Options • Pre-project
Validation • Rapid Activation for S/4HANA Output • Extensibility tools and recommendations
• Post Migration FI SAP Fiori in SAP Management Custom Fields App • Q&A
Activities S/4HANA • Q&A (hands-on)
• Q&A • Q&A • Q&A
Presentation (All) 2 hours 2 hours 2 hours 2 hours 1 hour
Basis 6 hours 2 hours
Estimated
hands-on
effort for
activities
ABAP 4 hours
Finance 4 hours
Logistics 2 hrs + Optional Activities
SAP S/4HANA
ERP 6.0, EhP 7 2022
One M onth Duration
MSSQL SAP HANA 2.0
STEP01 (Kickoff) STEP02 (MP, Readiness Check, SI-Check, Sizing) STEP05 (SUM) STEP06 (FIN-Mig)
STEP03 (Logistics) STEP07 (Fiori)
STEP04 (FIN) STEP08 (Logistics)
STEP09 (Cust. Code)
STEP10 (Feedback)
Lars Rueter
Sponsor and SAP S/4HANA Regional
Implementation Group Head - APJ
What do we do?
Collaborative working
The program support will commence with the start of your go-live project
and end one month after your first Go-Live, but latest after 12 months.
Public
V36 – Sep 6, 2022
SAP S/4HANA RIG enablement offerings
Modernization
Start Rapid
System SAP S/4HANA Cloud,
REUSE private edition
by in-place conversion Conversion
SAP S/4HANA
Process Optimization
Selective Business
SAP S/4HANA Cloud,
Hybrid private edition
Selective
Hybrid
Transition
Customer-tailored SAP S/4HANA
Data Transition
Transition
REENGENEERING
with data migration
Business Model
SAP S/4HANA Cloud, public
New
Innovation
edition
Implementation SAP S/4HANA Cloud,
Highly standardized fueled with best private edition
practices & based on a clean core
SAP S/4HANA
<50%
<5%
<50%
Drivers: Challenges:
• Heavy changes of Org Structures / business • Multi-system (parallel) during long time
processes required
• Implement in parallel to daily workload
• Lots of “dead“ data
• Additional IT-Resources required
• Blocking Add-ons / Business functions • Maintenance of existing solution
• Build / rollout of new solution
• Phased implementation required
• Heavy business involvement
• Cost
Drivers: Challenges:
• Existing solution still fits the business • All company codes at once (big bang)
requirements
• Implementation of new processes (Change)
• “Clean“ system
(only compatible Add-ons / Business • Roll-out of new User Interface options
functions) • Fiori vs. as-is
• Cost
Conversion requirements including minimum -maximum SP-level on source 2620910 - SAP S/4HANA . . . and SAP BW/4HANA 1.0:
system: 2884313 - SAP S/4HANA 2020: Release Information Note Recommended application server platforms
EWM
PP/DS
Fiori
PoC
Pre-project
S/4HANA 2022
Presales
Adoption Sandbox
Starter
Time
Preparation Conversion Innovation Projects
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 25
SAP S/4HANA conversion project
An overview of a conversion project and the key tools
Terminal Server
S/4HANA Adobe
Custom Code Check Document Services
ATC
Communication
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 28
Connection guide
Navigate to
Content and open
folders to access
presentation and
activity documents
for each step