EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Backilling
LPG Lines, gas lines and oil well flowlines in trenches shall have a SAES-L-450
A1
minimum cover of 900mm, all others shall have 600mm. Sec. 14.6.3
The top of the pipe, in trenches, shall not be closer to finished grade SAES-L-450
A2
than half the total cover required in sand areas. Sec. 14.8.1
In Sabkha areas, the top of the pipe shall be below the level of the SAES-L-450
A3
construction road by at least 100 mm. Sec. 14.10.2
The top of pipe shall be 50mm below original grade in rippable rock or SAES-L-450
A4
hard marl areas. Sec. 14.9.3a
The top of pipe shall be 150mm from the top of finished grade in hard
SAES-L-450
A5 rock areas when the rock layer is closer to finished grade by half a pipe
Sec. 14.9.3a
diameter plus 150mm.
Spot backfilling shall be used to restrain the pipe after it has been SAES-L-450
A6
lowered into the trench. Sec. 14.6.1
SAES-L-450
A7 Any voids underneath the pipe shall be carefully backfilled.
Sec. 14.5
Spot backfilling shall have full specified cover and shall cover all
SAES-L-450
A8 preformed bends a distance of 6m to each side of the center of the
Sec. 14.6.1
bends.
The maximum clear distance between spot backfills shall be as shown
SAES-L-450
A9 on IFC Drawings; Spot backfills shall cover at least 4.5m of the pipe
Sec. 14.6.1
lowered into the trench.
Fills and cuts shall be made to reduce the number and/or magnitude of
SAES-L-450
A10 overbends and sagbends in the pipeline. Fills should be avoided in
Sec. 7.1.3
areas where the natural drainage of the surrounding area is affected.
Surveying sticks shall be used to check the depth of cover and centering SAES-L-450
A11
of the pipe. Sec. 14.9.3d
Sand cover shall be at least 200mm thick around and above the pipe; SAES-L-450
A12
The sand pile above this shall be shaped to its natural angle of repose. Sec. 14.9.3e
Page 1 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MARCH 2010) Rev 4 31-Mar-10
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Backfilling and Berm Construction Inspection SAIC-L-1004 31-Aug-11 CIVIL
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Where the line passes through a sand dune, the width of leveled,
SAES-L-450
A15 stabilized right-of-way shall be 3m on each side of the pipeline plus 1m
Sec. 14.8.5
for every 1m of dune height in both the "cut" and "fill" areas.
SAES-L-450
The sand bedding under the pipe and backfill over the pipe can be
Sec. 14.8.5
A16 compacted to provide additional restraint around the buried pipe to
Commentary
reduce pipe deflection and stress under the weight of sand dune.
Note
B Berm Construction
The width of the flat top of the dike berm shall be at least twice the pipe SAES-L-450
B2
diameter along the overall minimum cover above the top of the pipe. Sec. 14.9.3g
Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MARCH 2010) Rev 4 31-Mar-10
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Backfilling and Berm Construction Inspection SAIC-L-1004 31-Aug-11 CIVIL
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Diversion ditches and/or culverts for flood water shall be provided to SAES-L-450
B5
keep the pipeline cover from acting as a dam or a channel bank. Sec. 14.9i
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-L-460 -- Pipeline Crossings Under Roads and Railroads, 6 May 2009
2- SAES-L-450 -- Construction of On-Land and Near Shore Pipelines, 30 June 2009