Ge (Air) Faisal
Ge (Air) Faisal
GE (AIR) FAISAL
(E-6 Section)
No.6000-Bill/ 28 /E-6 12 Sep 2024
Notice of tender for uploading on PPRA Website is enclosed herewith for your
further necessary action, please.
(AMAD ALI)
XEN
GE (AIR) FAISAL
TELE: 5455
Encls: As Above
Link with P-28 (For PPRA)
Amount (Approx)
Ser Description of Work Code
(Rs in Million)
a. Repair / Maintenance / Replacement Works at PAF Base CC 3.000
b. Repair / Maint of Certain Non Resdl Accn at Domestic Area at PAF Base CC 1.200
c. Repair / Maint of Certain Non Resdl Accn at Tech Area at PAF Base CC 1.400
d. Repair / Maint of Certain Resdl Accn at Domestic Area at PAF Base CC 1.200
02. The contractors are required to submit their applications for issuance of tender
documents alongwith their complete credentials as shown at (serial 8). The applications
shall be scrutinized and the tender documents will only be issued to the firms who have
sufficient experience in the relevant field and satisfy other special conditions required for
the job and area. Application should reach the above mentioned office before
23 Sep 2024 before 1130 hrs. Tenders will be issued to scrutinized contractors on
23 Sep 2024. The tender must be received in the accepting office by 11:30 Hrs on
30 Sep 2024 and will be opened at 1200 Hrs on the same date.
03. Firms / Contractors borne on approved list ‘E’ of MES Contractors or the
Government Departments having experience of this type of work may only apply. The
contractors will also furnish valid registration certificate of Pakistan Engineering Council,
Bank Statement / GST and NTN certificate.
04. Contractors who desire may be present at the time of opening of tenders.
05. Tender documents will be provided after issuance of publications.
06. The accepting officer reserves the right to accept or reject the tender. Rejected
tenders will be dealt with as per para-33 (1) of PPRA Rules.
07. The interested parties can contact GE (Air) Faisal / authorized sensitive for further
details from 0715 to 1335 hours on all working days.
Note : Contractors shall provide certificate that they are not involved in any type of
litigation with government Department in the Court of Law and that no special report of
Directorate of inspection and Evolution (E-in-C’s branch GHQ) is outstanding against
them.
Name of Departmental
work performance
Time Percentage
Sl executed Amount Date of Date of report on
Agency Allowed progress of
No during of work Commencement Completion each work by
(Months) work in had
the last 2 the Engineer
years in Charge