0% found this document useful (0 votes)
12 views36 pages

Hospital Project 1

For study and for evryone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views36 pages

Hospital Project 1

For study and for evryone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

INDEX SHEET INDEX SHEET

PAGE NO SHEET NO DRAWING TITLES SCALE PAGE NO SHEET NO DRAWING TITLES SCALE

1 W LEGEND AND MENHOLE SPECIFICATION As shown 18 W17 ABLUTION BUILDING WASTE WATER PLAN As shown
W01 As shown W18 As shown
2 SITE PLAN FOR WATER SUPPLY
19 ABLUTION BUILDING GRAY WATER DIAGRAM

W02 SITE PLAN FOR WASTE WATER As shown 20 W19 As shown


3 G JOINT WATER SUPPLY PLAN

4 W03 B BUILDING WATER SUPPLY PLAN As shown 21 W20 G JOINT BLACK & GRAY WATER DIAGRAM As shown

5 W04 B BUILDING WASTE WATER PLAN As shown 22 W21 A JOINT WATER SUPPLY PLAN As shown

6 W05 A BUILDING 1St FLOOR WATER SUPPLY PLAN As shown 23 W22 A JOINT BLACK & GRAY WATER DIAGRAM As shown

7 W06 A BUILDING 1st FLOOR WASTE WATER PLAN As shown 24 W23 WASHING ROOM WATER SUPPLY PLAN As shown

8 W07 DETILE A & B As shown 25 W24 WASHING ROOM WASTE WATER DIAGRAM As shown

9 W08 DETILE C & D As shown 26 W25 KITCHEN WATER SUPPLY PLAN


As shown

10 W09 ROOF PLAN FOR WATER TANK As shown 27 W26 OFFICE BUILDING WATER SUPPLY PLAN As shown

11 W10 B BUILDING WATER SUPPLY DIAGRAM As shown 28 W27 MULLA &SERVANT ROOM WATER SUPPLYPLAN As shown

12 W11 B BUILDING GRAY & BLACK WATER DIAGRAM As shown 29 W28 GARD ROOM WATER SUPPLY PLAN As shown

13 W12 A BUILDING WATER SUPPLY DIAGRAM As shown 30 W29 CANALIZATION AND WATER DETAIL As shown

14 W13 A BUILDING GRAY & BLACK WATER DIAGRAM As shown 31 W30 SEPTIC TANK PLAN As shown

15 W14 ABLUTION BUILDING WATER SUPPLY PLAN As shown 32 W31 A & B BUILDING ROOF PLAN As shown

16 W15 ABLUTION BUILDING WATER SUPPLY DIAGRAM As shown 33 W32 ABLUTION & KITCHEN BUILDING ROOF PLAN As shown

17 W16 ABLUTION BUILDING WATER SUPPLY DIAGRAM As shown 34 W33 JOINTS ROOF PLAN As shown

35 W34 MOSQE ROOF PLAN As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W
LEGEND FOR WATER SUPPLY & WASTE WATER DIAGRAMS Specification of Manholes

NO Symbol Shape In Water Supply Shape In Waste water NO OF Manhole


Name abbreviation Diagram Diagram NO Distance(m) I(%)
in Plan (80x80)cm

1 Shower Sh 1 MH1-MH2 1.6 1


2 volve vo 2 MH2-MH3 10.4 1
3 Tap T 3 MH3-MH4 7.6 1
4 Water Closet WC 4 MH4-MH5 5.3 1
5 Water Boiler WB 5 0.1
MH5-MH6 1
6 Cold Water Pipe 6 MH5-MH6 18.3 1
7 Black Water Pipe 7 MH6-MH7 9.8 1
8 Gry Water Pipe 8 MH7-MH8 22 1
9 Hot Water Line 9 2
MH8-MH13 1
10 Close Co 10 MH9-MH10 18.7 1
11 Dry weather Flow DWF 11 MH10-MH11 6.3 1
12 Sink 12 MH11-MH12 12.3 1
13 Gas 13 MH12-MH13 3 1
14 Refrigerator Ref 14 MH21-MH14 18 1
15 Dish Washer DW DW 15 MH14-MH15 17.5 1
16 Connected to Kitchen CO-K 16 MH15-MH17 17.6 1
17 Connected To Fire CO-F 17 MH17-MH18 15 1
18 Connected To Well CO-WE 18 4.5
MH16-MH22 1
19 Connected To W Tank CO-W 19 MH20-MH22 19.7 1
20 Down to Drainage D-D 20 7.2
MH19-MH20 1
21 Down to Well D-WE

22 Down to Septic Tank D-SP

23 Down to Water Tank R- W

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W
9
18 10 11 11 8
=50mm
L=56.5m
=50mm L=17m
V CH

V CH
17

2
4
15

=50mm
L=22m

=50mm
L=23m
RAMP SLOP 10%
V CH RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10%

17 =50mm
L=10m UP UP UP UP

RAMP SLOP 10%

RAMP SLOP 10%


UP UP

V CH
=50mm
L=17m
6

17
=50mm
L=27m

UP

11

11 1
14
6220
V CH

=50mm
L=23m

1 MOSQUE WITH VERANDA

7 2 A BUILDING FOR ( HOSTEL)


=50mm L=17m

=50mm
& ( CLASS ROOMS)

L=29m
3 B BUILDING FOR ( HOSTEL)

4 KITCHEN

5 ABLUTION PLACES BUILDING

6 OFFICE BUILDING =50mm


UP UP
L=7.5m =50mm L=13m
7 GUARD ROOM

V CH
UP RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10% =50mm
8 CLOTHS WASHING ROOM
RAMP SLOP 10%

=50mm L=8m
9 GUARD TOWERS (2nd floor ) V CH L=121m WEEL
17 10 GENERATOR & ELECTRICAL ROOM

11 SEPTIC TANK 1st, 2nd & 3rd

L=11.4m
=50mm
12 BORE WELL
15
13 CAR PARKING

14 MAINE ENTRANCE GATE

15 SPORT AND RESERVE AREA

V CH
16
=50mm

GREEN AREA
5
L=36m

17 SHOPS 3

L=10.7m
=50mm
18 ABLUTION ROOM

21 19 RESERVE AREA FOR SHOPS

17 20 BOUNDARY WALL

21 PCC FLOORING
=50mm L=19.3m V CH =50mm L=60.5m

RAMP SLOP 10%


18 17 17 17 17 17 17 17 17
9

W Site Plan for Water supply


04 SCALE: As Shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-01
9
18 10 11 11 8
19

MH18
=125mm L=14.3m

17
21

=125mm
2

L=17m
4
15

RAMP SLOP 10%

MH10
RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10%

17 =125mm 21 21 TOP L=1799,995 MH1


MH20

L=7.2m UP UP UP UP BEDL=1799,385

RAMP SLOP 10%

RAMP SLOP 10%


MH19 UP

D-TOP L=1800,285
D-BEDL=1799.735 MH8
=150mm L=19.6m

MH13
MH11 MH12
6 =150mm
L=12m

17 TO DRAIN INLET=1799,52
OUTLLET EL=1799,686
UP INLET EL=1799,636
11
MH22

11 1
14
6220

MH16 =125mm MH17


L=14.9m

=150mm
1 MOSQUE WITH VERANDA

L=5.3m
MH7
7 2 A BUILDING FOR ( HOSTEL)
=150mm L=17.3m

=175mm
& ( CLASS ROOMS)
3 B BUILDING FOR ( HOSTEL)

L=10m
4 KITCHEN

5 ABLUTION PLACES BUILDING

6 OFFICE BUILDING
MH5 MH6
UP UP UP
7 GUARD ROOM
=150mm

=150mm
UP
8 CLOTHS WASHING ROOM
RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10% RAMP SLOP 10%
L=18m

L=5.3m
=125mm

MH4
9 GUARD TOWERS (2nd floor )
MH15

17 L=5.2m MH1
10 GENERATOR & ELECTRICAL ROOM

11 SEPTIC TANK 1st, 2nd & 3rd MH1

=125mm
12 BORE WELL

L=7.6m
15
=125mm L=17.8m

13 CAR PARKING

MH3
14 MAINE ENTRANCE GATE

15 SPORT AND RESERVE AREA

16 GREEN AREA
5
17 SHOPS 3

=125mm
L=10.6m
18 ABLUTION ROOM

21 19 RESERVE AREA FOR SHOPS

17 20 BOUNDARY WALL
MH21

21 PCC FLOORING
MH14 MH1 21 MH1 MH2
MH1
UP

=125mm

RAMP SLOP 10%


L=17m
18 17 17 17 17 17 17 17 17
9

W Site plane for Waste Water


04 SCALE: As Shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-02
(300*150)mm
UP

4 Stairs
1
2 Co-WE
3 CO-W
4
First floor LVL
Ramp slop=10% 0+00m Ramp slop=10% GV GV W2

D4 SH
HB
W2 W2
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
HB R-W
SH HB
WC
GV
HB
HB

Ramp slop=10%
SH HB
WC

Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed HB


HB
Room Room Room Corridor Room Room Room Room Room SH
(6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m HB WC

Heater Heater Heater Heater Heater Heater Heater Heater HB HB


SH
WC

HB
HB
First floor LVL
SH +0.30m
First floor LVL
W6 W6 W6 W6 W6 W6 W6 W6
+0.15m
D1 D1 D1 D1 D1 D1 D1 D1

First floor LVL


0+00m

First floor LVL 3 2 1


Corridor Corridor 0+00m UP
W-(2.82)m W-(2.82)m 3 Stairs
(300*170)mm

D1 D1 D1 D1 D1 D1 D1 D1 First floor LVL


W6 W6 W6 First floor LVL W6 W6 W6 W6 W6 +0.15m
D3
0+00m SH
First floor LVL
+0.30m D3 HB
HB
TO CONTINUOUS SEE ANOTHER PAGE

D1 22
UP 22 D1
D3 HB
SH D3
WC

Living/Bed
21 1 21
Heater Heater Heater 20 2 20 Heater Heater Heater Heater Heater
Room 19 3 19 HB
HB
(300*150)mm

(300*150)mm

(300*150)mm
(6.92*6)m 18 4 18
11 Stairs

11 Stairs

11 Stairs
Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed
WC

17 5 17 SH D3 D3
Room Room Room Room Room Room Room HB
16 6 16
(6.92*6)m (6.92*6)m 15 7 15 (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m
FIRE EXTINGUISHER CABINET HB
14 8 14
HB
9
WC

13 13 D3
12 10 12 SH D3
11 HB
HB
Storage/ WC

Servant room D3 HB
First landing LVL SH GV
under stairs +1.65m D3
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 (5.30*3.075)m W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 HB

D3
SH
W7
W4 GV GV A pipe

W3 W2 W2

B pipe

CO-W
NOTE:
1 ALL PIPES OF WATER SUPPLY ARE PPR
DETAIL # A
2 ALL DISTRIBUTION PIPES OF WATER SUPPLY 0W-7
W B BUILDING GROUND& FIRST FLOOR WATER SUPPLY PLAN WATER WELL TO WATER TANK AND SITE ARE 50MM
04 SCALE: As shown 3 POWER OF WATER PUMP TO BE 5HP

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-03
(300*150)mm
UP

4 Stairs
1
2 D-D
3
4
First floor LVL
Ramp slop=10% 0+00m Ramp slop=10%
W3 W2 W2

D4 FD FD
FD
W2 W2 FD
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
WC
FD FD D-SP

FD
WC

Ramp slop=10%
FD
FD
FD
Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed FD
WC
Room Room Room Corridor Room Room Room Room Room
(6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m FD

FD WC
Heater Heater Heater Heater Heater Heater Heater Heater
FD
FD
FD
WC
First floor LVL
+0.30m
FD First floor LVL FD
W6 W6 W6 W6 W6 W6 W6 W6
+0.15m
CO
D1 D1 D1 D1 D1 D1 D1 D1

First floor LVL


0+00m

First floor LVL 3 2 1


Corridor Corridor 0+00m UP
W-(2.82)m W-(2.82)m

D1 D1 D1 D1 D1 D1 D1 D1 First floor LVL FD


W6 W6 W6 First floor LVL W6 W6 W6 W6 W6 +0.15m
CO
0+00m FD
First floor LVL
+0.30m
WC
FD
TO CONTINUOUS SEE ANOTHER PAGE

FD
D1 22
UP 22 D1
FD
Living/Bed
21 1 21
Heater Heater Heater 20 2 20 Heater Heater Heater Heater Heater FD FD WC
Room
19 3 19
(300*150)mm

(300*150)mm

(300*150)mm
(6.92*6)m 18 4 18
11 Stairs

11 Stairs

11 Stairs
Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed
Room 17 5 17 FD
Room 16 6 16 Room Room Room Room Room
(6.92*6)m (6.92*6)m 15 7 15 (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m FD WC
FIRE EXTINGUISHER CABINET 8 FD
14 14
13 9 13
FD
12 10 12
11 FD WC
FD
Storage/
Servant room FD
First landing LVL FD
under stairs +1.65m WC
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 (5.30*3.075)m W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 FD
FD FD

FD
W7
W4

D-SP
W3 W2 W2

D-D

DETAIL # B
NOTE: 0W-7

W B BUILDING GROUND& FIRST FLOOR WAASTE WATER PLAN


04 SCALE: As shown 2 ALL PIPES OF WASTE WATER ARE PVC C CLASS
4 POWER OF WATER PUMP TO BE 5HP

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-04
W A BUILDING FIRST FLOOR PLAN
04 SCALE: As shown

DETAIL # C
W-08

Co-F W7 Co-WE
W4
R-W W2 W2
R-W

GV GV
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 Storage/ W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
Servant room +1.65m SH
under stairs
First landing LVL HB
HB
FIRE EXTINGUISHER CABINET (5.30*3.075)m WC

HB HB
11
12 10 12 SH
Black Board 13 9 13
HB WC

(300*150)mm

(300*150)mm

(300*150)mm
14 8 14
Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed HB

11 Stairs

11 Stairs

11 Stairs
15 7 15
Class Room Room Room 16 6 16 Room Room Room Room Room HB
SH
(6.92*6)m (6.92*6)m (6.92*6)m 17 5 17 (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m
18 4 18 WC

19 3 19 HB
Heater Heater Heater 20 2 20 Heater Heater Heater Heater Heater HB
21 1 21 SH
D1 22 22
HB WC

D1
UP

HB
SH
0+00m
D1 D1 D1 D1
First floor LVL D1 D1 D1 D1 D1

3 Stairs
(300*170)mm
Corridor
Corridor 0+00m UP
W-(2.82)m
W-(2.82)m First floor LVL 3 2 1

0+00m
First floor LVL

D1 D1 D1 D1 D1 D1 D1 D1

SH
HB
TO CONTINUOUS SEE ANOTHER PAGE

HB

SH WC

HB
Heater Heater Heater Heater Heater Heater Heater Heater

Corridor HB WC

Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed SH


Class Room

Ramp slop=10%
Room Room Room Room Room Room Room
Black Board (6.92*6)m HB HB
(6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m
WC

HB
SH
HB
HB
WC

SH HB HB
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
W2 W2 HB

SH

Ramp slop=10% 0+00m


First floor LVL
Ramp slop=10% GV GV

4 Stairs 4 Stairs W3 W2 W2
(300*150)mm (300*150)mm
UP UP R-W
1 2 3 4 4 3 2 1
NOTE:
1 ALL PIPES OF WATER SUPPLY ARE PPR
2 ALL DISTRIBUTION PIPES OF WATER SUPPLY
W A BUILDING FIRST FLOOR WATER SUPPLY PLAN WATER WELL TO WATER TANK AND SITE ARE 50MM
3 POWER OF WATER PUMP TO BE 5HP
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-05
DETAIL # D
W-08

W7 D-D D-SP
W4

W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 Storage/ W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
Servant room +1.65m WC
First landing LVL
under stairs FD
FD
FIRE EXTINGUISHER CABINET (5.30*3.075)m FD
FD FD
11 WC
12 10 12
Black Board 13 9 13 FD

(300*150)mm

(300*150)mm

(300*150)mm
14 8 14
FD

11 Stairs

11 Stairs

11 Stairs
Living/Bed Living/Bed 15 7 15 Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed
Class Room Room Room 16 6 16 Room Room Room Room Room WC
(6.92*6)m (6.92*6)m (6.92*6)m 17 5 17 (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m FD
18 4 18
19 3 19 FD
FD WC
Heater Heater Heater 20 2 20 Heater Heater Heater Heater Heater
21 1 21 FD
D1 22 22 D1
FD
UP
FD

0+00m FD
First floor LVL FD CO
D1 D1 D1 D1 D1 D1 D1 D1 D1

3 Stairs
(300*170)mm
Corridor
Corridor 0+00m UP
W-(2.82)m
W-(2.82)m First floor LVL 3 2 1

0+00m
First floor LVL

D1 D1 D1 D1 D1 D1 D1 D1 FD CO
FD
WC
FD
TO CONTINUOUS SEE ANOTHER PAGE

FD
Heater Heater Heater Heater Heater Heater Heater Heater FD WC
FD
Corridor FD
Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed Living/Bed
Class Room FD

Ramp slop=10%
Room Room Room Room Room Room Room
Black Board (6.92*6)m FD WC
(6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m (6.92*6)m
FD

FD
FD FD WC
FD

FD FD
WC
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 FD
W2 W2 FD FD

FD

Ramp slop=10% 0+00m Ramp slop=10%


First floor LVL

4 Stairs 4 Stairs W3 W2 W2
(300*150)mm
UP
(300*150)mm
UP NOTE: D-D
1 2 3 4 4 3 2 1

1 ALL PIPES OF WASTE WATER ARE PVC C CLASS


2 POWER OF WATER PUMP TO BE 5HP

W A BUILDING FIRST FLOOR WAASTE WATER PLAN


04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-06
First floor LVL
First floor LVL
+0.15m
FD +0.15m
CO First floor LVL
FD First floor LVL
+0.30m
SH +0.30m
WC
HB HB
FD
FD
FD SH HB WC

HB
FD
WC HB
WC

FD FD SH
HB
FD WC
HB
FD
HB WC

FD SH D3
FD HB
WC HB
FD
WC

FD HB GV
FD SH HB
WC
FD FD HB
FD

FD SH

GV GV A pipe
D-SP
W3 W2 W2 W3 W2 W2

B pipe
D-D

W DETAIL B W DETAIL A
04 SCALE: As shown 03 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-07
Co-WE D-D D-SP
R-W
R-W

GV GV
SH WC
HB FD
HB WC
FD
FD
FD FD
HB HB
SH WC
FD
HB WC

HB FD
SH HB WC
FD
WC

HB FD
HB FD WC
SH FD
HB WC
FD
FD
HB
SH
FD
FD CO

W DETAIL C W DETAIL D
05 SCALE: As shown 06 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-08
50MM OVER
FLOW PIPE
5.0 cum
Water Tank

50MM CONNECTIO
50MM OVER
FLOW PIPE
5.0 cum

PIPE
Water Tank

50MM OVER
FLOW PIPE

50MM PPR PIPE 5.0 cum


Water Tank
FROM WATERWELL 4# 50MM FIBER GLASS INSULATION WITH ALUMINUM
TO WATER TANK FOUIL PPR PIPE FROM WATER TANK TO A & B DISTRIBUTION PIPE
63MM PIPE
CO - FIRE-F

W A & B BUILDING Roof Plan For Water Tank


04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-09
HB
HB B Building Cold Water A pipe
HB section d (mm) L (m)
HB section(1-2) 32 4.74
HB
section(2-3) 40 4.13
HB
HB section(3-4) 40 3.3
HB section(4-Ta) 50

HB

HB

HB HB
HB
HB HB
HB
HB
HB HB
HB
HB
HB HB

HB

HB

HB

As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-10
B Black Gray Water Diagram
section d (mm) L (m) I (%)
A2-B2 50 1 1
B2-E2 76 6.72 1
C2-D2 76 7.3 1
D2-E2 76 0.6 1
E2-F2 76 1 1
F2-G2 76 3.3 -
F2- Drinrge 100 0.2 1

B Building Black Water pipe


section d (mm) i (%)
section(A-B) 100 1
section(B-C) 100 -
section(MH1) 100 1

DWF B BUILDING Black water Isometric Diagram


04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-11
HB
SH
HB
SH HB
HB
+3.30m SH
HB
2nd floor LVL HB
SH

SH +6.60m
Roof LVL A Building Cold Water Dpipe
SH
section d (mm)
A Building Cold Water C pipe
section(1-2) 32
section d (mm)
section(2-3) 40
section(1-2) 32
section(3-4) 40
section(2-6) 32
section(4-Ta) 50
section(3-5) 32 +3.30m HB
section(4-5) 20 2nd floor LVL
section(5-6) 40 HB

section(6-7) 50 HB
section(7-Ta) 50 HB
HB HB
A Building Hot Water C pipe SH HB +0.7 m
HB
section d (mm) HB First floor Distribution Pipe LVL
SH HB
HB
section(1-BL2) 20
HB
section(Sh-BL1) 20 SH HB
section(3-4) 20 SH
HB
SH HB

HB

W A BUILDING Water supply Isometric Diagram of C Pipe


W A BUILDING Water supply Isometric Diagram of D Pipe
04 SCALE: As shown
04 SCALE:

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-12
+6.60m
B Black Gray Water Diagram
section d (mm) L (m) I (%)
Roof LVL
A2-B2 50 1 1
B2-E2 76 6.72 1
C2-D2 76 7.3 1
D2-E2 76 0.6 1
E2-G2 76 3.3 -
G2- Drinrge 100 0.2 1

+3.30m
2nd floor LVL
+8.10m
VENTILATION PIPE LVL

VENTILATION PIPE(100)mm

+6.60m
Roof LVL
A Building Black Water pipe
section d (mm) i (%)
section(A-B) 100 1
section(B-C) 100 -
section(C-NH1) 100 1
+3.30m WC

2nd floor LVL B


WC

WC
ge
na

WC
dri
ce
rpe

WC
Su

WC
0+00M
FIRST FLOOR LVL C A
WC

WC
Under GL
Under GL WC

WC

DWF A BUILDING of Gary water Isometric Diagram DWF A BUILDING Black water Isometric Diagram
04 SCALE: As shown 04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-13
WC WC

HB HB

STORAGE

SERVANT
ROOM &
(3*1.50)
HB

m
HB
WC

HB WC WC

HB HB
HB
HB HB
HB HB
WC WC

HB HB
HB HB HB HB HB HB HB HB
HB HB HB HB HB
WC HB HB WC

HB HB
HB HB HB HB

HB HB
WC WC

HB HB
WC

HB HB HB
HB
HB
WC
HB WC

HB HB HB
WC
HB
HB HB
HB
HB
WC HB WC

WC HB HB HB
HB HB HB
HB
HB
WC
HB WC

WC

HB
HB HB
HB HB
HB HB
WC WC

(2.40*1.44)m
WC
HB

HEATER
PLACE
HB HB
HB HB GV HB
HB
HB
A PIPE
B PIPE GV HB

Ablution south side A pipe Diagram


UP

HB
B PIPE GV HB HB section d (mm)
A PIPE HB WC

section(1-2) 40
HB
GV HB section(2-3) 40
HB HB HB HB HB HB 2
HB section(4-3) 32
WC
WC WC
WC WC HB
HB
WC
HB section(3-5) 40
HB HB HB HB HB section(5-6)
HB 50
HB HB HB HB
WC WC
HB section(6-7) 50
WC HB WC WC WC HB
HB section(8-7) 40
HB HB 5 HB HB
HB HB HB section(7-Tank) 63
HB WC WC HB HB HB 4
HB HB HB HB
WC WC WC WC

HB HB
3 HB
HB HB HB HB HB HB
HB HB
HB
HB WC WC
HB HB HB
HB HB HB
HB HB
WC WC WC WC HB
HB
HB HB HB HB HB HB
HB HB
HB
WC WC HB HB HB
HB HB
HB WC
8
WC WC WC

HB HB
HB
HB HB
HB HB
HB HB HB HB
HB HB
HB WC WC WC

6 HB
HB HB HB
HB HB HB HB HB
HB HB HB HB HB HB HB HB
HB HB
HB HB HB
WC

HB HB
HB HB 1
HB
HB HB HB
WC
HB
HB
GV
HB
HB Connected to
HB HB HB HB HB HB HB Water(15000 liter) Tank
HB WC
7

HB

w ABLUTION BUILDING WATER SUPPLY PLAN


04 SCALE: As shown W Ablution Building Water supply Isometric Diagram of South side A Pipe
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-14
HB

2 HB Ablution North side B pipe Diagram


HB section d (mm)

HB section(1-2) 32
HB water distribution pipe
section(2-3) 50
HB
section(3-Tank) 50
HB HB

63MM
HB

HB HB

HB CO-W
50mm x32mm
Angle Volve

HB HB Nozzile

HB

50MM
HB
HB
HB

HB
HB
1 HB

HB
3
HB

50MM
CO-WE

Connected to
Water(15000 liter) Tank

GV As shown
W Ablution Building Water supply Isometric Diagram of South side B Pipe
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-15
Ablution north side A pipe Diagram
Connected to section d (mm)
Water(15000 liter) Tank
1 HB section(1-2) 40 3
HB
section(2-3) 40
HB HB HB
GV section(4-3) 32
HB HB HB
section(3-5) 50
6 HB section(5-6) 50 2
HB
HB
section(7-6) 50 HB
HB HB
HB section(6-Tank) 63 Connected to
Water(15000 liter) Tank HB
HB HB HB
HB HB
5 HB
HB HB GV
HB
HB HB
HB HB HB
HB HB HB

HB
HB
HB HB HB
HB
HB
HB HB HB HB
HB
HB HB HB HB
HB HB
7
HB
HB HB HB
4
HB HB
HB HB
HB HB
HB Ablution south side A pipe Diagram
HB
HB
HB HB section d (mm)
HB
HB 2 section(1-2) 50 HB HB HB
HB HB
section(5-4) 32 1
HB
HB section(2-4) 63
3
HB HB
section(2-3) 63
HB
section(3-Tank) 63 HB

HB HB 5
HB
HB

HB HB
4

W Ablution Building Water supply Isometric Diagram of North side B pipe


W Ablution Building Water supply Isometric Diagram of North side A pipe
04 SCALE: As shown
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-16
MH5 MH6
MH6
WC

Ablution BuildingBlack Water Diagram


section d (mm) L (m) i (%)
WC
FD FD A3-B3 100 15.2 1

STORAGE

SERVANT
ROOM &
(3*1.50)
FD FD WC B3-C3 1
100 6.7

m
WC
AB,P AB,P
FD C3-E3 100 9.66 1
WC
FD FD FD D3-E3 100 6 1
WC AB,P
WC E3-MH3 100 7.38 1
FD AB,P
FD FD WC F3-H3
FD 100 9.89 1
G3-H3 100 6.21 1
FD FD
MH4 WC FD WC H3-MH2 100 0.5 1
WC
FD MH2-MH3 125 10.2 1
FD FD
FD FD MH3-MH4 1
125 7.46
WC AB,P AB,P WC WC I3-K3 100 7.5 1
FD
FD J3-K3 100 4 1
FD FD FD
FD MH5 K3-MH4 100 1 1
WC WC
WC AB,P WC MH4-MH5
FD FD AB,P 150 5.13 1
AB,P
WC FD MH5-MH6 1
FD 150 16.6
FD
FD L3-MH6
FD WC WC 100 17.27 1
FD
WC AB,P AB,P WC
FD FD AB,P
WC FD
FD WC WC
FD
WC FD AB,P AB,P WC
AB,P
WC
WC
WC WC
FD
FD FD
WC FD FD AB,P WC
FD AB,P AB,P
WC
WC WC
MH3 (2.40*1.44)m
MH4
FD FD HEATER
PLACE
FD
FD FD WC
WC WC
WC WC AB,P
WC

FD
WC
WC WC
WC

L3
WC
WC
UP

FD WC
WC
FD
WC
FD WC
FD WC
WC FD
FD WC WC WC WC WC WC
FD
FD WC
FD FD WC
FD FD FD FD FD
FD WC WC
WC WC
WC WC WC
FD WC
WC
FD WC
WC WC FD FD MH3 WC
FD FD WC
WC WC WC WC WC WC

FD FD WC
WC WC FD WC
FD FD FD WC
FD WC
WC FD WC
WC WC WC WC
FD FD WC
WC

WC WC WC
WC
FD
FD FD FD WC WC
WC WC WC WC
WC
MH2
FD FD WC
FD FD FD FD WC
WC
WC WC WC
FD WC

WC
FD FD
FD FD
AB,P FD WC

FD WC
FD
AB,P AB,P AB,P WC
FD FD FD FD
FD
FD FD FD
FD
AB,P AB,P AB,P AB,P AB,P AB,P
AB,P AB,P WC MH2
FD FD FD FD FD FD
FD FD

DWF Ablution Building Black water Isometric Diagram


w ABLUTION BUILDING WATER SUPPLY PLAN
04 SCALE: 04 SCALE: As shown
As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-17
Ablution Room Gray Water Diagram south side Ablution Room Gray Water Diagram North side
section d (mm) L (m) I (%) section d (mm) L (m) I (%)
A-Drinage 65 9.27 1 A2-C2 76 6.31 1
B-Drinage 50 3.89 1 B2-C2 65 3.2 1
C-D 76 18 1 C2-Drinage 76 4.43 1
Drinage-D 76 3.5 1 D2-Drinage 76 9.5 1
D-out Drinage 100 2.8 1 E2-Drinage 65 3.45 1
F2-Drinage 76 13.4 1
Dr- out Dr 100 1

DWF Ablution Building Gary water Isometric Diagram of South side DWF Ablution Building Gary water Isometric Diagram of North side
04 SCALE: As shown 04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-18
Over Flow Pipe

Pipe For Clean

(G)JOINT WATERSUPPLY DIAGRAM +3.30m


section d (mm) roof LVL
section(1-2) 20
section(2-4) 40
section(3-4) 20
section(4- TA) 40
HB HB HB HB FD

HB
FD FD
HB
HB HB
HB FD
HB HB
HB
HB HB
FD FD +0.7 m
FD HB
HB GV floor Distribution Pipe LVL
HB
GV
FD FD HB HB
HB
HB
HB FD GV HB HB
HB HB HB
GV HB

w G JOINT Ablution Room Floor Plan


W G JOINT waterSupply Isometric Diagram
04 SCALE: As shown As shown
04 SCALE:

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-19
(G)JOINT Gray WATER DIAGRAM
section d (mm) I (%)
+4.0m
VENTILATION PIPE LVL A-Drinege 65 1
VENTILATION PIPE(100)mm
D-E 65 1 Su
rp
ec
e
B-C 65 1 dr
ina
ge
F-Drinege 80 1 FD
e
ag
rin D
iord
in ter

FD
(G)JOINT BLACK WATER DIAGRAM D
FD
B FD
section d (mm) L (m) i (%) Su
rp
FD ec
section(A-MH) 1 e
100 6.14 FD
dr
ina
D C ge
FD

FD
E A
FD ge
na
dri
MH E or
eri
int

WC
WC

WC

WC

DWF G JOINT Black water Isometric Diagram DWF G JOINT Gray water Isometric Diagram
04 SCALE: As shown 04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-20
(A,G,H)JOINTS WATERSUPPLY DIAGRAM
section d (mm) L (m)
section(1-2) 15 2.71
section(5-4) 15 9.88
section(4-3) 35 6.36
Over Flow Pipe
section(3-2) 40 7.1
GV
FD Tank Base LVL section(2- TA) 40 4.3
HB HB HB HB
GV +3.50m
Pipe For Clean

+3.30m
HB
roof floor LVL
FD FD
HB HB
Ablution HB
FD HB HB
Room(1) HB
(5.96*5.78)m HB
HB HB
FD FD GV
FD +0.7 m HB HB
HB First floor Distribution Pipe LVL
GV
HB
FD FD HB
HB
HB
HB HB HB FD HB HB
HB
HB

w A JOINT Ablution Room Floor Plan


04 SCALE: As shown W A JOINT waterSupply Isometric Diagram
04 SCALE: As shown

+4.0m
VENTILATION PIPE LVL

VENTILATION PIPE(100)mm

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-21
04 SCALE: As shown

+4.0m
VENTILATION PIPE LVL

VENTILATION PIPE(100)mm

(A)JOINT Gray WATER DIAGRAM


section d (mm) L (m) I (%)
B-C 50 3.37 1
rin
ag
e
FD D-E 50 3.89 1
io rd F
r
inte G E-Drinege 65 2.08 1
F-G 50 0.32 1
FD
FD B H-Drinege
(A,G,H)JOINTS BLACK WATER DIAGRAM D FD 50 2.08 1
section d (mm) L (m) i (%) FD FD
section(A-MH) 100 11.96 1 FD
H D FD
WC FD
C
FD
E e
WC nag
r dri
FD e rio
WC int
Su
E
rpe
WC ce
dri
na FD
ge E
MH 0+00M
-0.5 M
Under GL
FLOOR LVL

Under GL Su
rpe
ce
dri
na
ge

DWF A JOINT Black water Isometric Diagram DWF A JOINT Gray water Isometric Diagram
04 SCALE: As shown 04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-22
Washing Room Cold Water Diagram
section d (mm) L (m)
1-2 20 7.42 BL 2#80lit
4-2 20 10
2-5 25 1.38
3-5 25 25.9
GV +0.7 m
5-Tank 32 4 floor Distribution Pipe LVL
5
Washing Room Hot Water Diagram GV
HB 2
section d (mm) L (m)
Bil -1 20 9.88 HB
Bil- 2 HB C HB
20 26.88 HB
Bil- 4 20 HB
13
HB
HB

HB HB
GV
HB HB HB HB HB HB 1
B HB
HB
GV HB 4 HB
HB HB HB HB HB HB HB
HB

HB HB HB
HB 3
HB
Washing Room HB
HB (12.50*5.50)m HB

HB HB HB HB

w WASHING ROOM WATER SUPPLY PLAN PLAN w Washing Room Water supply Isometric Diagram
04 SCALE: As shown
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-23
Washing Room Gray Water Diagram
section d (mm) L (m) I (%)
A-B 50 2.8 1
C-B 50 5.7 1
B-D 65 2.5 1
D-Drinege 80 2.1 1
FD
C

FD
FD FD FD FD FD

FD FD
B

FD 4 FD

FD Washing Room FD FD FD
(12.50*5.50)m A D
ge
ina
FD dr
e
ec
rp
Su

w WASHING ROOM GRAY WATER PLAN


04 SCALE: As shown w Washing Room and Gray Water Isometric Diagram
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-24
(10.95*6.22)m

(6.22*5.23)m
Storage

Bakery
HB

DW DW
Co-A BUILDING

Kitchen Room Cold Water Supply pipe


section d (mm) L (m)
A Bulding-end 20
FD FD FD FD
Co-D Kitchen Room Gray Water pipe
section d (mm) L (m)

(16.30*9.76)m
FD - Drinage 76

Kitchen
UP

(16.30*12.85)m
Dining Hall

W Kitchen BUILDING FIRST FLOOR PLAN For Water and west water
04 SCALE:

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-25
Lav

WC
WC FD WC WC FD
SH
SH SH FD FD SH
Lav Lav
LV Lav Lav
LV
Office (1) LV LV Office (2) BL20 LI
Bed Room Bed Room
(5*5)m (5*5)m (5*4.77)m (4.77*4.50)m
BL20 LI

20 Stairs 10 Stairs
(300*145)mm (300*145)mm
UP UP
10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1
Bath
2.38*1.50)
11 12 1 2 3 4 5 6 11 12 13 14 15 16 17 18 19 20
m
UP
6 Stairs 10 Stairs
(300*145)mm (300*145)mm
Medical Room
(7*5)m

Living & dining room


(7.88*5)m
Students
visiting room Office
(5.50*5)m (5.50*5)m

(Office Building ColdWaterSupply


section d (mm) L (m)
Tank- end 25 16

(Office Building Gray Water


section d (mm) L (m)
FD - Drinage 50 5.5

(Office Building Cold Water Supply (Office Building Hot WaterSupply (Office Building Black & Gray Water
section d (mm) L (m) section d (mm) L (m) section d (mm) L (m)
w OFFICE BUILDING FIRST & SECOND FLOOR PLAN
Tank- end 25 19 BL- SH 20 9.54 Start-MH19 100 11
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-26
DETAIL # E
W-28

SH FD DN
Living Room
For mosque BL20 Li
servant
(4*3)m
Steel stairs
UP
20(200*200)mm

VERANDA
(25*18.20)m
UP Roof

Steel stairs
20(200*200)mm UP

Living Room
For Mulla BL20 Li
(4*3)m FD
SH DN

Mulla Room Gray Water Mulla Room Cold & Water Supply Mulla Room Hot Water Supply
section d (mm) section d (mm) section d (mm)
A Bulding-Drinage 50 Tank -end 20 BL-end 20

w FIRST FLOOR (Mulla & servant rooms) PLAN


04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-27
Gard Room Cold Water Supply
section d (mm)
FD-Drinage 50

Gard Room Cold Water Supply


section d (mm)
Tank -end 25

Guards Room
(6*4)m
Living Room SH FD
For mosque BL20 Li
servant
(4*3)m

Lav

SH
BL20 LI

Corridor LV
(2.78*1.40)m
FD CO-W

CO-WE

W DETAIL E
w (D) JOINT GUARD ROOM FIRST FLOOR WATER SUPPLY PLAN 28 SCALE: As shown
04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-28
VENT PIPE CAP

PLUMBING VENT PIPE


RUBBER PIPE BOOT WITH STAINLESS STEEL COLLAR
SET IN DIAMOND CONFIGURATION, BEND TO FORM WITH
PROFILE CONTOUR OF PANEL, SET CONTINUOUS TAPE
SEALANT AND FASTEN TO ROOF PANEL

METAL ROOF PANELS

w CLEAN OUT DETAIL


w PLUMBING VENT THROUGH DETAIL 04 SCALE: As shown
04 SCALE: As shown w LAVATERY PLUMBING DETAIL
04 SCALE: As shown

w P-TRAP DETAILE
04 SCALE: As shown

w TYPICAL LAVVATORY DETAIL w BACK TO BZCK LAVATORY DETAIL


04 SCALE: As shown 04 SCALE: As shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-29
In inlet PIPE
300

In inlet PIPE

300

300
In inlet PIPE Outlet PIPE
Outlet PIPE

3000
3000

3000
Baffle wall Baffle wall
Baffle wall

Section(A-A) Section(A-A) Section(A-A)


2500

Manhole
4600

5000
In inlet PIPE
Outlet PIPE

3800
inlet PIPE outlet PIPE
Manhole

4100 3100
9300 7600
outlet PIPE
inlet PIPE

DWF West Sid septic tank Plan and Section DWF East Sid septic tank Plan and Section DWF septic tank for A Joint Shops
04 SCALE: As shown 04 SCALE: As shown As shown
04 SCALE:

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-30
SLOP 1% SLOP 1%
SLOP 1%
SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1%

21
3

SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1% SLOP 1%

W A & B BUILDINGS ROOF PLAN NOTE:


04 SCALE: As Shown ALL DN PIPE ARE PVC (100)mm

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-31
SLOP 1%

8 SLOP 1%
SLOP 1%
SLOP 1%
6
W CLOTHS WASHING ROOF PLAN
04 SCALE: As Shown
SLOP 1% SLOP 1%

SLOP 1%
4 NOTE:
W OFFICE BUILDING ROOF PLAN
ALL DN PIPE ARE PVC (100)mm
04 SCALE: As Shown

SLOP 1%

SLOP 1%

W KITCKEN & ABLUTION BUILDING ROOF PLAN


04 SCALE: As Shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-32
SLOP 1%
SLOP 1% SLOP 1% SLOP 1% SLOP 1%

W G,H,I,G ROOF PLAN


04 SCALE: As Shown

SLOP 1% SLOP 1% SLOP 1% SLOP 1%

W K,L,M,N ROOF PLAN NOTE:


ALL DN PIPE ARE PVC (100)mm
04 SCALE: As Shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-33
SLO
P 1%
SLO
P 1%
SLO
RD P 1%
SLO
P 1%

1
SLO
P 1%
SLO
P 1%

SLO
P 1%

SLOP
1%

NOTE:
W KITCKEN BUILDING ROOF PLAN
04 SCALE: ALL DN PIPE ARE PVC (100)mm
As Shown

Designed by Eng.Naqib Ahmad Naeemi Scale As Shown G. NOTES:


PROJECT NAME:
WATER SUPPLY DESIGN Drowned by Design code Date: 2024/03/30 Dimentions are in
A & B BUILDINGS MM
Checked by No of drawings Sheet No W-34