SOP For SWS Application EV PCS
SOP For SWS Application EV PCS
Standard Operating Procedure (SOP) for Single Window System and Standard
Application Form:
1. Objective:
1. State Discom shall develop an online portal if they don’t already have, for
receiving applications for grant of public EV charging connections online.
2. Charge Point Operator (CPO) to fill the application form and upload
documents online including clearances from other agencies, if any. Online
form may have details as provided at Annexure A.
3. Discom shall examine / review the application and verify the supporting
documents submitted by CPO within 3 days of submission.
4. Post the review of the application, Discom may send back the application to
the applicant, in case of any discrepancy, to be re-submitted within 3 days.
5. Once an application complete in all respects is received by DISCOM,
DISCOM shall conduct technical feasibility of the desired location and provide
electricity connection in terms of the timelines prescribed in the Electricity
(Rights of Consumers) Rules dated 22nd Feb 2024.
6. Post the grant of the electricity connection by DISCOM, Charger Point
Operator (CPO) shall visit the site, install the EV charger and the required
electrical infrastructure.
7. Post installation, the CPO will submit the documents (as provided at
Annexure B) through the online portal to SNA.
8. Discoms shall integrate their online application portal with the portals of
concerned SNA and CNA(BEE) for visibility and monitoring the status of
charging infrastructure installations.
9. SNA / DISCOM may charge a fee from the CPO for taking necessary
clearances from relevant departments, wherever requested by the CPO.
Annexure A:
Application form (proposed)
S. No. Particulars Response
1. Name of Applicant / Organization
Company registered under (Indian Companies Act /
Individual / Co-operative Society / Any Other Corporate
2. Entity)
Company Registration Certificate / Memorandum of Understanding
to be submitted as proof)
3. Company registration number
4. Registered Address
Present activity/business carried by the applicant/
5.
organization
Details of Authorised person
6. Name
7. Designation
8. Mobile Number
9. Email ID
10. ID number of any Government ID proof
Location details of proposed site
Type of Location
11.
(Retail Outlets / Public / Semi-public (Restricted)
12. Address of location along with Area Pin Code
13. City
14. District
Geo-graphical co-ordinates of Location (Latitude and
15.
Longitude)
16. Details of Network Service Provider
17. Existing load (kW / kVA), if any
18. Desired Load (kW / kVA)
19. Supply type (LT / HT)
20. Tariff category
EV Charger details
Type of Charger (CCS / Type 2 / CHAdeMO / Bharat
21.
AC-001 / Others)
22. Number of EV chargers
23. Capacity of each charger (kW)
24. No. of connector guns
25. Total connected load
Annexure B
Documents required from the CPO.
1) Lease agreement between Land Owning Agency and the CPO.
2) Power of Attorney confirming powers on the person(s) who are competent to
execute the MoU / agreement.
3) Certified copy of Company Registration Certificate
4) Copy of PAN Card
5) Copy of GST Registration
6) Self-Attested copy of Govt. ID Proof of the Authorised Representative
7) Petroleum & Explosives Safety Organization (PESO) Approval in case electricity
connection required for installation of EV chargers at Petrol Pumps / Gas
Stations, shall be sought by CPO.
8) NOC from fire department (if EV charger is to be installed in the basement of a
building).
9) EV Charger test certificate from NABL Accredited Lab.
10) Undertaking on Stamp Paper for using power supply only for public EV charging.