Declaration About Me: Aknowledgement
Declaration About Me: Aknowledgement
AKNOWLEDGEMENT
First I would like to express my heartfelt sincerely thanks to the
almighty heavenly father god for his help at every state dependency in
my life.
EXECUTIVE SUMMERY
From the internship I got a lot of knowledge about the site and
office works. It gives me a good view about:-
Mat foundation, shear wall, column, beam, ribbed slab
The coordination of the workers
How to change the plane in to actual position
.
To decide what objective to purchase and how to determine the
activities and also to accomplish one organization objectives, it is
necessarily planned every activities from the list up to the most.
If this works haven’t given proper attention and speed, we might lose
a huge amount of money and equipments. B/c of these reasons for the
success of the company they should give a proper attention for three things
which are;-
Speed
Time
quality
To fulfilling these three things, the companies follow its planning
procedure, B/c when we planned something we produce a schedule for
future action to bring specified results at specified period of time
though all of my daily activities most of the time I try to fulfill above
three things
I. When I start in A-Z real estate around kazanchies area the construction
building project is at 2nd floor (which is a ribbed slab), now it is some part of
7th floor slab formwork, but the company schedule shows at these time at
11th floor slab.
Some of the reasons for the company can’t run with it work progress
(schedule plan) is lack of managerial skill.
As it’s indicated in the above the managers are the major factor that
cause problems made a big challenge on work man.
Defects in building occur due to many reasons. Some of the reason may
be;
1. Poor workmanship
2. Poor material quality
3. Poorly prepared formwork and false work leading to leakage
4. Inappropriate mix design
5. Design problems
When I was in A-Z real estate, some of the defects I observed were;
a) Honey combing (voids)
b) Excess casting of concrete on stairs and difference in height of
risers
c) The creation of dig voids and holes between slab blocks
A brief yet concise explanation of the causes and remedies of the above
situations shall be presented.
Some of the voids are advantageous when the finishing work starts, this
will help as;
Adopt the same procedure as mentioned above (for area where loose
concrete and big honeycomb exist)
The application of the concrete should be injection method of using
pumps.
Fig-14 helmet
Improving my entrepreneurship skills
In my company sometimes challenges happened on the project. If we
can’t face out this challenge with in a time, it put its sign project duration. We
always provide a new thing to face out the challenges and put the project on
the regulation way to meet the present project schedule.
Sometimes new challenges happened in our company b/c of it, new we
can’t face if by the present way. We provide new facing ideas with
cooperating the workers. We face it every challenges, these things gives for
me a good knowledge about creating a new ideas to face out any challenge on
the construction, these thing gives for me a good knowledge about internship
skills.
Generally, cheating a new way for the works to move project parallel.
Providing a new idea to face out challenges. Cheating a new idea for the
company to meet the project duration and also:-
Challenges always happened on the construction industry.
Providing better way for the work flow and project duration.
My assistance gives for me the chance to create a new idea on the
task.
Up and down (backwardness or forwardness) or not smoothly move
off the project.
Give a huge entrepreneurship skill for me.
Conclusion
All in all, during four month internship experience, I have been able to
observe that as an construction engineer, the main tasks that I am supported
to perform include:
Management
Quantity specification
Equipment organization
Man power organization
Site establishment
Work supervision
About skills
Management is perfect, when human, material, and finical and time
resources are properly combined and effectively managed. In this regard the
knowledge of management enables managers to create favorable working
environment. In quantity specification, I am referring to determining the
approximate amount of construction materials like steel, concrete and borrow
materials. Equipment organization on the other hand refers to the
assigning of the proper number of tools like the shovel, hammer and wheel
barrows and so on with an adequate efficient number of labor. Site
establishment is the preliminary step of starting site work. Through site
establishment, proper locations of various components like the store, crane,
mixer, water reservoir and material duping areas are set. Supervision is the
proper follow up that is done so that the design is properly converted into a
reality and workmanship errors exist. My skills are the main things in for the
construction environment, some examples that I improve are; when I say my
practical skills I notice different work section. Like concrete casting, carpenters
work and steel workers and also I got a skill how to coordinate this work section
and I got another practical skills other than civil parts like electrical installation
and so on. So regarding practical skills, internship program is essential. When I
come to interpersonal communication skills, I got skills to communicate with
different respected peoples and workers of the site, so internship program was
give me such a good things. And team playing skills also my important area that
internship program give me. So internship program was giving me such a good
thing. Responding leadership I got a good skill how to lead the work and the
workers smoothly and I got some basic work ethics and so on.
Recommendation
I recommend the company BamaCon engineering PLC and its
workers, in the areas that I observe such as
Managements
Quality of work
Adequacy of the work
Safety
When I say managements, from my point of view, the management
was good. But in man power managements, I see some wastage. So I
recommend the company to improve amount of money of day salary.
Regarding quality and adequacy of the work, I can speak confidently
that is the best company which can be seen the building that it done. So I
recommend that it would continue in its good quality.
Regarding safety of the workers, I saw something that is not good,
like all the works haven’t Hamlet and safety shoes. And also I don’t see
stand by car for emergency case. So I recommend the company to
facilitate those safety shoes and Hamlet and prepare car at all site.
Generally, BamaCon engineering PLC is the best, working in this
company is nice and I recommend all to work in this company.
Reference
To write this final internship report I use supporting materials such as;
Internet accesses
Company profile
Course related books
Appendix
This consisting consists:-
40*50*18cm “ “
40*50*20cm “ “