008 - Cat-6060 - Attachment Functions FS (Read-Only) (Compatibility Mode)
008 - Cat-6060 - Attachment Functions FS (Read-Only) (Compatibility Mode)
Cat® 6060/6060FS
Boom Down
(Float)
Bucket Bucket
Curl Close Curl Open
Boom
(Power)
Horn Down
Boom Up
Spare Truck
Counter
2
LH Joystick Service Training
Stick Out
Swing Swing
Left Right
Stick
(Power)
In Spare
Stick In
Clam Spare
Open/Close
3
Pedals Service Training
4
Main Pump Assembly Service Training
P8
P7
P6
P5
P4
P3
P2
P1
5
Travel Supply: P1/P7 and P2/P8 (P3/5 and P4/6 Attachment) Service Training
6
Rotary Joint and Main Valves (side views) Service Training
*The High pressure routing from Pump 3/5 and 4/6 leads direct to the attachment functions
*The High pressure routing from Pump 1/7 and 2/8 leads direct via Rotary Joint to the travel functions
7
Main Control Valves (Triple – Spool Valve) Service Training
Secondary- and
Anti Cavitation
Valves
Main
Valve
Spool
Load
Check
Valves
8
Attachment Main Valves Service Training
9
Attachment ------- Valve ----- Spool ---- Control
Attach-
ment
Valve-
Spool
Control
Tank
Lines
FS – Attachment – Proportional Valve Control Blocks
Tank Line
Attach-
ment
Valve- 35 bar Servo
Spool Pressure delivery
Service Training
Control
10
Functions - Proportional Valve Banks - Attachment - FS - Version Service Training
-2Y36
-2Y10
-2Y8 Stick Cylinder out (Stick out)
-2Y2
-2Y5
-2Y8
-2Y10 Clam Cylinder out (Clam close)
Tank Return
Tank Return
-2Y37 Valveblock Pre Heating
Stick Float Valve Tank Return (no electrical signal)
-2Y37
-2Y7 Stick Cylinder in- Float (Stick float)
-2Y7
-2Y4
-2Y4 Boom Cylinder in- Float (Boom float)
Boom Float Valve Tank Return (no electrical signal)
-2Y6
-2Y3
-2Y2
-2Y9
-2Y3 Boom Cylinder in (Boom power down)
-2Y2 Bucket Cylinder out (Bucket fill)
-2Y9 Clam Cylinder in (Clam open)
Tank 35 bar
11
Proportional Valve Banks - installation Service Training
12
Proportional Valve Banks - Routing Servo- Control Hoses Service Training
13
Main Valves on FS Attachment – Description and Legend Service Training
188/1 188/2
14
Main Valves – Front View with Servo- Control Hoses Service Training
15
Main Valves – Rear View with Servo- Control Hoses Service Training
16
Main Valves - side view – with HP- Hose- and Pipe-routing Service Training
17
Main Valves - side view – with HP- Hose- and Pipe-routing Service Training
18
Main Valve - installation with detailed HP- Pipe-routing Service Training
19
Main Valve installation – with full HP- Hose- and Pipe-routing Service Training
20
Main Valve installation - with full HP- Hose- and Pipe-routing Service Training
Top - view
21
Main Valve installation – with full HP- Hose- and Pipe-routing Service Training
Side view - LH
Side view - RH
22
Condition: Boom Up Service Training
23
Condition: Boom Down (Floating) Service Training
24
Example: Float Valve - Condition Service Training
Boom 182 / 2
164/ 1
160
Tank lines
Boom 182 / 1
25
Attachment: Boom Up - Condition Service Training
Tank- Line
HP- Lines = Servo- Pressure Lines – 35 bar
182/2
164
boom 182/1
P2 / P8
HP - Line
Routing to Spool- Block 160 / 2
26
Condition: Boom Power Down Service Training
27
Secondary Relief Valves Service Training
28
Secondary Relief Valves with Anti Cavitation Function Service Training
Valve short before opening Valve open due to high pressure Anti cavitation function
29
More Information? Service Training
30