0% found this document useful (0 votes)
39 views

Hiradc Survey

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Hiradc Survey

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

CLIENT:

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING


CONTROL
(HIRADC)

CONTRACT NO. TNB 39/2022 MAIN CONTRACTOR:

"275kV OVERHEAD LINES FROM PMU NENGGIRI TO LALOH


SWITCHING STATION: MAINHEAD A: PMU NENGGIRI (SP) TO POINT A
(AP9

NO. JOB DESCRIPTION HIRADC NO. PAGE NO. REV NO


1 CHECK SURVEY 1 - 1.2 1-3 0

PREPARED BY: VERIFIED & AGREED BY:

........................................... ...........................................
NAME :MN. DEHVIN ROY NAME : Ahmad Hafizuddin Ramle DESIGNATION
DESIGNATION : HSE OFFICER : PROJECT MANAGER
DATE : DATE :
HAZARD IDENTFICATION, RISK ASSESSMENT & DETERMINING CONTROL (HIRADC)
Contract No.: TNB 39/2022
Project Name: 275kV OVERHEAD LINES FROM PMU NENGGIRI TO LALOH SWITCHING STATION: MAINHEAD A: PMU NENGGIRI (SP) TO POINT A (AP9)
Location: Gua Musang
1
Department: Health Safety Environmental Prepared by: MN.Dehvin Roy (HSEO) Revision: 0
HIRADC No.: 1 Agreed by: Ahmad Hafizuddin Ramle (PM) Date: 18/3/2022
Job Title: Check Survey Page: 1 of 55

IDENTIFY ASSESSMENT CONTROL


Activities R/NR PIC
Hazard Consequences Current Risk Ctrl L/Hood Severity R/Level Risk Rating Type of Ctrl Futher Action / Control
Surveying works. Poisonous Bitten/stings: 1. Toolbox and Safety
Walk insects/animals Body injury, Fatal briefing.
over survey, Detailled (e.g: bee, snakes, (Leg, hand & etc) / 2. Method statement-
survey, allignment and wild animals and etc) Diseases Survey.
tower spotting 3. Safe operation procedure
(SOP)-Survey work.
SHO/ SSS/
4. Long sleeve attire. 3 4 12 Medium
SSV
5. Easiblity study on route.
6. Suitable safety shoes
(jungle boots).

Swampy / Slippery Stuck / Fall: 1. Toolbox and Safety


Area Minor injury briefing.
2. Method statement-
Survey.
3. Safe operation procedure
(SOP)-Survey work.
4. Easiblity study on route. SHO/ SSS/
3 2 6 Medium
R 5. Suitable safety shoes SSV
(jungle boots).
6. Using safe
access and egress.

Sprained Ankle 1. Toolbox and Safety


foot injury briefing.
2. Method statement-
Survey.
3. Safe operation procedure
(SOP)-Survey work.
4. Easiblity study on route. SHO/ SSS/
5. Suitable safety shoes 3 2 6 Medium
SSV
(jungle boots).
6. Using safe
access and egress.

LIKELIHOOD SEVERITY RISK = LIKELIHOOD X SEVERITY


Most Likely (5) The most likely result of the hazard / event being realised Catastropic (5) Numerous fatalities, irrecoverable property damage and productivity 1-4 LOW RISK
Possible (4) Has a good chance of occuring and is not unusual Fatal (4) Approximately one single fatality & major property damage if hazard is realized 5 - 12 MEDIUM RISK
Conceivable (3) Might be occur at sometime in future Serious/Major (3) Non fatal injury, permanent disability 15 - 25 HIGH RISK
Remote (2) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cut, first aid type injury NR Non-Routine
HAZARD IDENTFICATION, RISK ASSESSMENT & DETERMINING CONTROL (HIRADC)
Contract No.: TNB 39/2022
Project Name: 275kV OVERHEAD LINES FROM PMU NENGGIRI TO LALOH SWITCHING STATION: MAINHEAD A: PMU NENGGIRI (SP) TO POINT A (AP9)
Location: Gua Musang
1.1
Department: Health Safety Environmental Prepared by: MN.Dehvin Roy(HSEO) Revision: 0
HIRADC No.: 1.1 Agreed by: Ahmad Hafizuddin Ramle (PM) Date: 18/3/2022
Job Title: Check Survey Page: 2 of 55

IDENTIFY ASSESSMENT CONTROL


Activities R/NR PIC
Hazard Consequences Current Risk Ctrl L/Hood Severity R/Level Risk Rating Type of Ctrl Futher Action / Control
Surveying during sunny R Direct sun Dehydrate 1. Toolbox and safety
day briefing.
2. Method statement-
Survey.
3. Safe operation procedure
(SOP)-Survey work. SHO/ SSS/
3 2 6 Medium
4. Carry sufficient drinking SSV
water.
5. Be in sheddy area.

Headaches/ faint 1. Toolbox and safety


briefing.
2. Method statement-
Survey.
3. Safe operation procedure
(SOP)-Survey work. SHO/ SSS/
3 2 6 Medium
4. Carry sufficient drinking SSV
water.
5. Be in sheddy area.

Surveying during rainy R Thunderstorm Lightning Strike: 1. Toolbox and safety 1. Temporary Stop Work
day Serious Burn briefing.
Fatal 2. Method statement-
Survey.
3. Safe operation procedure
(SOP)-Survey work. SHO/ SSS/
3 4 12 Medium Isolated
4. Carry sufficient drinking SSV
water.
5. Be in sheddy area.

LIKELIHOOD SEVERITY RISK = LIKELIHOOD X SEVERITY


Most Likely (5) The most likely result of the hazard / event being realised Catastropic (5) Numerous fatalities, irrecoverable property damage and productivity 1-4 LOW RISK
Possible (4) Has a good chance of occuring and is not unusual Fatal (4) Approximately one single fatality & major property damage if hazard is realized 5 - 12 MEDIUM RISK
Conceivable (3) Might be occur at sometime in future Serious/Major (3) Non fatal injury, permanent disability 15 - 25 HIGH RISK
Remote (2) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cut, first aid type injury NR Non-Routine