Hiradc Survey
Hiradc Survey
........................................... ...........................................
NAME :MN. DEHVIN ROY NAME : Ahmad Hafizuddin Ramle DESIGNATION
DESIGNATION : HSE OFFICER : PROJECT MANAGER
DATE : DATE :
HAZARD IDENTFICATION, RISK ASSESSMENT & DETERMINING CONTROL (HIRADC)
Contract No.: TNB 39/2022
Project Name: 275kV OVERHEAD LINES FROM PMU NENGGIRI TO LALOH SWITCHING STATION: MAINHEAD A: PMU NENGGIRI (SP) TO POINT A (AP9)
Location: Gua Musang
1
Department: Health Safety Environmental Prepared by: MN.Dehvin Roy (HSEO) Revision: 0
HIRADC No.: 1 Agreed by: Ahmad Hafizuddin Ramle (PM) Date: 18/3/2022
Job Title: Check Survey Page: 1 of 55
Surveying during rainy R Thunderstorm Lightning Strike: 1. Toolbox and safety 1. Temporary Stop Work
day Serious Burn briefing.
Fatal 2. Method statement-
Survey.
3. Safe operation procedure
(SOP)-Survey work. SHO/ SSS/
3 4 12 Medium Isolated
4. Carry sufficient drinking SSV
water.
5. Be in sheddy area.