0% found this document useful (0 votes)
236 views1 page

ATT Checklist

CHECKLIST FOR ATT

Uploaded by

Bittu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
236 views1 page

ATT Checklist

CHECKLIST FOR ATT

Uploaded by

Bittu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRAGATI INFRA SOLUTIONS PVT LTD

Project:- NCR BIG BOX PATLI

CHECKLIST FOR ANTI-TERMITE TREATMENT

PROJECT NCR BIG BOX Document No.

LOCATION DATE

GRID Ref Drg. No.

S. No. Description YES NO N/A REMARK

DETAIL

a. Area ready for ATT

b. Total Qty. of Chemical Required for ATT

c. Total Qty. of Solution (ATT+Water) made for the Area

PRE CHECK

1 Method statement is approved

2 Material is as per Indian standard / specifications and approved

3 Ensure material expiry date.

Previous activity/excavation/Filling are inspected and ready to


4 receive ATT.
HSE rules/ regulations are followed and following are available on
5 site.
Local weather condition is favourable to carry out anti-termite
6 treatment i.e. no rain or probability of raining during anti-termite
treatment.

7 Spraying apparatus available on site is in working Condition

DURING & POST CHECKS

8 Chemical is mixed in proper ratio as per specification

9 Rate of spray is maintained as per specification/ Mockup

Corrective action, if any:

PISL ENGINEER PISL QA/QC CLIENT REPRESENTATIVE

Signature

Name
Date