0% found this document useful (0 votes)
14 views6 pages

1 RCOL MM CSBP Reports 15 V1.0

Uploaded by

bhusarepranav25
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views6 pages

1 RCOL MM CSBP Reports 15 V1.0

Uploaded by

bhusarepranav25
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

Reports In Inventory Management

Current State Business Processes

Doc No:15/RAIN/CSBP/MM/Rev 1.0

CSBP – Materials Management

Wipro Ltd Page 1 of 6 RAIN


Reports In Inventory Management
Current State Business Processes

Doc No:15/RAIN/CSBP/MM/Rev 1.0

DOCUMENT APPROVALS

NAME DESIGNATION SIGNATURE / DATE

Wipro Consultant
Mr.Siva Prasad
Mr.M.Sivarami Core Team Member
Reddy
Mr.K.Mayooranadha Business Process Owner
n

Wipro Ltd Page 2 of 6 RAIN


Reports In Inventory Management
Current State Business Processes

Doc No:15/RAIN/CSBP/MM/Rev 1.0

M.Sivarami Reddy
Name
Dy.Manager – Stores
Designation

Process Responsibility

Process Definition

Inventory Management
Major Process Name
Reports
Minor Process Name

Sub Process Name

Inputs:

Input Type of Input (Data/ Category of Input (Vital / Mode of Information


Activity) Essential / Desirable)

Wipro Ltd Page 3 of 6 RAIN


Reports In Inventory Management
Current State Business Processes

Doc No:15/RAIN/CSBP/MM/Rev 1.0

Process Details

Ste Description of Activity / Process Carried out


p
No
1 Material closing stock with value ( Item rate option, value option ) High value items report

2 Stock ledger with value details (from item code to item code) from Main group to sub group option

3 Item Wise Receipts , Consumption Summary with value (SP, IN, RG)

4 Transporter wise Material Wise receipt(Tpt code / Item Code) abstract,


Transporter wise Material Wise receipt(Tpt code / Item Code) only abstract
5
Daily packing material report (day option)
6
Ageing Analysis (from date to date) item code to item code

7 Sale Note wise receipts (GRN to GRN, Sale note No.


8 Cost center wise Dept wise pending indents with values
9 Cost center wise / dept wise POS raised / Cost center wise dept wise pending POs
10 Non moving items report (item code to code , purchase before, to not moved since)
11 Department wise total inventory status
12 Daily raw material summery report

Wipro Ltd Page 4 of 6 RAIN


Reports In Inventory Management
Current State Business Processes

Doc No:15/RAIN/CSBP/MM/Rev 1.0

Outputs:

Output Customer Type of output Category of Output Mode of


For e.g. Report / (Vital / Essential / Information
approval / plan / Desirable)
request / etc

Issues / Pain Areas perceived in the functioning of the Sub-Process:

S. Issue / Pain area perceived Remarks Priority


N H/M/L
o

Reporting requirement

S.N Name of the Report Type of Report Description of the Priority (C/N
o (Report/Layout) Report (C-Critical for Go-Live or
N Not Critical for Go-Live)

Wipro Ltd Page 5 of 6 RAIN


Reports In Inventory Management
Current State Business Processes

Doc No:15/RAIN/CSBP/MM/Rev 1.0

Wipro Ltd Page 6 of 6 RAIN

You might also like