0% found this document useful (0 votes)
7 views3 pages

Esteban E01 Est300

Uploaded by

Denzel Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views3 pages

Esteban E01 Est300

Uploaded by

Denzel Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ESTEBAN, ROMNOEL E01 EST 300 10/12/2024

GROUND FLOOR

Exterior Wall 1 MASONRY:


● Length: 8m / 0.4m = 12 layers of CHB
● Height: 3.2m / 0.2m = 16 layers of CHB
● D & W: 2.52 + 1.44 + 2.16 = 6.12 sqm
● CHB: 8 x 3.2 = 25.6 - 6.12 = 19.48 sqm
○ Total = 19.48 sqm / 0.08 sqm = 243.5 ≈ 244 CHB

REBAR:
● Vertical Bars: 8m / 0.4m = 20 rebars / 6 m = 3.33 ≈ 4 bars
● Horizontal Bars: 3.2m / 0.40m = 8 rebars x 2 (6m) = 16 bars
○ Total: 4 + 16 = 20 BARS

Exterior Wall 2 MASONRY:


● Length: 12.55m / 0.4m = 31.25 layers of CHB
● Height: 3.2m / 0.2m = 16 layers of CHB
○ Total: 31.25 x 16 = 500 CHB

REBAR:
● Vertical Bars: 12.55m / 0.4m = 31.25 pcs / 6 m = 5.20 ≈ 6 bars
● Horizontal Bars: 3.2m / 0.4m = 8 rebars x 2 (6m) rebars= 16 bars
○ Total: 16 + 6 = 22 BARS

Exterior Wall 3 MASONRY:


● Length: 8m / 0.4m = 12 layers of CHB
● Height: 3.2m / 0.2m = 16 layers of CHB
● D & W: 1.90 + 1.44 + 1.44 = 4.78 sqm
● CHB: 8 x 3.2 = 25.6 - 4.78 = 20.82 sqm
○ Total = 20.82 sqm / 0.08 sqm = 260.25 ≈ 261 CHB

REBAR:
● Vertical Bars: 8m / 0.4m = 20 rebars / 6 m = 3.33 ≈ 4 bars
● Horizontal Bars: 3.2m / 0.4m = 8 rebars x 2 (6m) = 16 bars
○ Total: 4 + 16 = 20 BARS

Exterior Wall 4 MASONRY:


● Length: 12.55m / 0.4m = 31.25 layers of CHB
● Height: 3.2m / 0.2m = 16 layers of CHB
● D & W: 1.90 + 1.44 + 1.44 + 1.44 + 1.44 = 7.66 sqm
● CHB: 8 x 3.2 = 25.6 - 7.66= 17.94 sqm
○ Total = 17.94 sqm / 0.08 sqm = 224.25 ≈ 225 CHB

REBAR:
● 16mm diameter for every 400 mm
● Vertical Bars: 12.55m / 0.4m = 31.25 pcs / 6 m = 5.20 ≈ 6 bars
● Horizontal Bars: 3.2m / 0.4m = 8 rebars x 2 (6m) rebars= 16 bars
○ Total: 16 + 6 = 22 BARS
SECOND FLOOR

Exterior Wall 1 MASONRY:


● Length: 8m / 0.4m = 12 layers of CHB
● Height: 2.8 m / 0.2m = 14 layers of CHB
● D & W: 1.44 + 1.44 + 2.16 = 5.04 sqm
● CHB: 8 x 2.8 = 22.4 - 5.04 = 17.36 sqm
○ Total = 17.36 sqm / 0.08 sqm = 217 CHB

REBAR:
● Vertical Bars: 8m / 0.4m = 20 rebars / 6 m = 3.33 ≈ 4 bars
● Horizontal Bars: 2.8m / 0.4m = 7 rebars x 2 (6m) = 14 bars
○ Total: 4 + 14 = 18 BARS

Exterior Wall 2 MASONRY:


● Length: 12.55m / 0.4m = 31.25 layers of CHB
● Height: 2.8m / 0.2m = 14 layers of CHB
○ Total: 31.25 x 14 = 437.5 ≈ 438 CHB

REBAR:
● Vertical Bars: 12.55m / 0.4m = 31.25 pcs / 6 m = 5.20 ≈ 6 bars
● Horizontal Bars: 2.8m / 0.4m = 7 rebars x 2 (6m) rebars= 14 bars
○ Total: 14 + 6 = 20 BARS

Exterior Wall 3 MASONRY:


● Length: 8m / 0.4m = 12 layers of CHB
● Height: 2.8m / 0.2m = 16 layers of CHB
● D & W: 1.44 + 1.44 = 2.88 sqm
● CHB: 8 x 2.8 = 22.4 - 2.88 = 19.52 sqm
○ Total = 19.52 sqm / 0.08 sqm = 244 CHB

REBAR:
● Vertical Bars: 8m / 0.4m = 20 rebars / 6 m = 3.33 ≈ 4 bars
● Horizontal Bars: 2.8m / 0.4m = 7 rebars x 2 (6m) = 14 bars
○ Total: 4 + 16 = 20 BARS

Exterior Wall 4 MASONRY:


● Length: 12.55m / 0.4m = 31.25 layers of CHB
● Height: 3.2m / 0.2m = 16 layers of CHB
● D & W: 1.44 + 1.44 + 1.44 + 1.44 = 5.76 sqm
● CHB: 8 x 2.8 = 22.4 - 5.76 = 16.64 sqm
○ Total = 16.64 sqm / 0.08 sqm = 208 CHB

REBAR:
● Vertical Bars: 8m / 0.4m = 20 rebars / 6 m = 3.33 ≈ 4 bars
● Horizontal Bars: 2.8m / 0.4m = 7 rebars x 2 (6m) = 14 bars
○ Total: 4 + 14 = 18 BARS
GROUND FLOOR

Interior Wall 1 MASONRY:


● Length: 6.35m + 6.60 / 0.4m = 32.37 layers of CHB
● Height: 3.2m / 0.2m = 48.37 layers of CHB
● D & W: 1.68 +1.68 = 3.36 sqm
● CHB: 12.95 x 3.2 = 41.44 - 3.36 = 38.08 sqm
○ Total = 38.08 sqm / 0.08 sqm = 476 CHB

REBAR:
● Vertical Bars: 12.95 / 0.4m = 32.37 rebars / 6 m = 5.39 ≈ 6 bars
● Horizontal Bars: 3.2m / 0.4m = 8 rebars x 2 (6m) = 16 bars
○ Total: 4 + 14 = 18 BARS

SECOND FLOOR

Interior Wall 1 MASONRY:


● Length: 3.85m + 5m / 0.4m = 22.125 layers of CHB
● Height: 2.8m / 0.2m = 14 layers of CHB
● D & W: 1.68 = 1.68 sqm
● CHB: 8.85 x 2.8 = 24.78 - 1.68 = 23.1 sqm
○ Total = 23.1 sqm / 0.08 sqm = 288.75 ≈ 289 CHB

REBAR:
● Vertical Bars: 8.85m / 0.4m = 22.125 rebars / 6m = 3.68 ≈ 4 bars
● Horizontal Bars: 2.8m / 0.4m = 7 rebars x 2 (6m) = 14 bars
○ Total: 4 + 14 = 18 BARS

Interior Wall 2 MASONRY:


● Length: 4.475m + 2.55m / 0.4m = 12 layers of CHB
● Height: 2.8 / 0.2m = 14 layers of CHB
● D & W: 1.68 +1.68 = 3.36 sqm
● CHB: 7.025 x 2.8 = 19.67 - 3.36 = 16.31 sqm
○ Total = 16.31 sqm / 0.08 sqm = 203.87 ≈ 204 CHB

REBAR:
● Vertical Bars: 7.025m / 0.4m = 17.56 / 6 m = 2.92 ≈ 3 bars
● Horizontal Bars: 2.8m / 0.4m = 7 rebars x 2 (6m) = 14 bars
○ Total: 3 + 14 = 17 BARS

SUMMARY

TOTAL CHB: 3025

TOTAL REBARS: 195