Spencer Wanjohi Chiera 2191010051 - 081252
Spencer Wanjohi Chiera 2191010051 - 081252
CERTIFICATE IN PLUMBING
SIGNATURE ……………………………………………DATE…………………...
ii
DEDICATION
I dedicate this wonderful work to my dear parents for giving me a way forward due to there
financial support they have invested on me throughout my studies.
iii
ACKNOWLEDGEMENT
First and foremost I thank the Almighty God for hi love, care and protection in my entire
endeavour in life. I’m grateful to my academic lectures and supervisors for encouragement and
tireless efforts in ensuring that my work was successful.. For the advice and guidance forms an
integral part in completion of this project
iv
TABLE OF CONTENT
DECLARATION.............................................................................................................................ii
ABSTRACT...................................................................................................................................vi
CHAPTER ONE..............................................................................................................................1
1.0 INTRODUCTION................................................................................................................1
1.1 WHAT IS ENTAILED IN THE PROJECT......................................................................1
1.2 AIMS OF THE PROJECT..................................................................................................2
1.3 RELATION TO ENVIRONMENT....................................................................................2
CHAPTER TWO.............................................................................................................................3
2.0 LITERATURE REVIEW....................................................................................................3
CHAPTER THREE.........................................................................................................................4
3.0 PLAN.........................................................................................................................................4
3.1 SYMBOLS OF APPLIANCES.................................................................................................5
3.2 SECTION VIEW.......................................................................................................................6
3.3 ISOMETRIC VIEW..................................................................................................................7
3.4 FRONT VIEW...........................................................................................................................8
3.5 END VIEW................................................................................................................................9
CHAPTER FOUR.........................................................................................................................10
`4.0 DATA ANALYSIS............................................................................................................10
PROGRAM OF ACTIVITIES...............................................................................................11
4.1 FINDINGS..........................................................................................................................11
4.2 CONCLUSION...................................................................................................................11
4.3 RECOMMENDATIONS...................................................................................................12
APPENDICES...............................................................................................................................12
APPENDIX I............................................................................................................................12
BILL OF QUANTITY.........................................................................................................12
v
ABSTRACT
This project highlight aims of the project, relation to environment and a national and local view
of the project. It also relys on the literature review, critical details of the project in relation to the
past and in present day. It outlines the researches recommendation and conclusion about the
study. It also has step by step procedure of actualizing my project till to the final step.
vi
CHAPTER ONE
1.0 INTRODUCTION
Wash hand basin and kitchen sink entailed a great qualities that make them a good choice for
any home. It is made from high impact material with a high steel finish making each home
sink use, visually appealing and providing long lasting durability. Their look is timeless and
complements other porcelain appliances, they can be strong and durable but quality
of other materials like ceramic which has been alloyed or combined with chromium and
nickel that give it more beneficial properties that it would otherwise have on it's own.
Wash hand basin have taps(Faucets) that will supply hot and cold water. They also include a
drain to remove used water . Sink may also have an integrated soap dispenser, when a sink
become clogged, a person will often resort to using a drain cleaner or a plunger.
Wash hand basin is one of the highest utilisation rates of equipment in the home . Many
people like it because it is easy to clean, light weight and corrosion resistance. Also ceramical
basin has to entail the following requirements for it's effectiveness that is;
Most Wash hand basin are made of sanitary materials which are easily clean and self
1
1.2 AIMS OF THE PROJECT
The aim of the project is to provide high quality utensils washing and handwashing solutions
wherever needed and to reduce the boredom and shortcomings which may occur.
To manage gases from the sanitary system entering into the building by applying traps.
the environment from water pollution since the chemicals are disposed off as intended.The
kitchen sink has its soakpit where the unused water flows off.
2
CHAPTER TWO
2.0 LITERATURE REVIEW
This case study present analysis of injury risk and prevalence in a house behind the side of a
Each kitchen sink is unique in it's design. When installing a kitchen sink manufacturers
literature need to be put into consideration to come out with actual measurements required.
The height of kitchen sink above the ground should be 900mm unless it is
CHAPTER THREE
3
3.1 PLAN
3.2 SECTION
4
3.3 ISOMETRIC VIEW
5
3.4 GRAPH
6
CHAPTER FOUR
4.0 DATA ANALYSIS
Data analysis is the arrangement and processing of the data collected. This chapter contains
data and information collected in field. Furthermore comparison is made at the end of data
presentation.
7
Worker No. Working Wage per Wage per Working
Hours hour day days
Plumber 1 76 188 1000 10
Unskilled 1 42 75 600 5
1000
300 × 2= 600
= ,1600
Over head
=(1600+9600+3840 )
= 15040
4.2 APPENDICES
APPENDIX I
BILL OF QUANTITY
ITEM DESCRIPTION NO COST@ TOTAL
8
NO COST
wheelbarrow
TOTAL 14400
9
4 10 Installation of appliances
5 11 Testing
6 5 Cleaning
7 11 Retesting
8 3 Commissioning
10