Civil Schedule
Civil Schedule
.
Page 118
.
Page 119
.
Page 120
.
Page 121
.
Page 122
.
Page 123
18.33
13.5.1 With common burnt clay F.P.S.(non modular) bricks of
class designation 7.5 5 each 10862.40 54312.00 18.33.1 SR
13.6 Providing and fixing G.I. Union in G.I. pipe including
cutting and threading the pipe and making long screws
etc. complete (New work) : 18.46
13.6.1 40 mm nominal bore 25 each 631.30 15783.00 18.46.5 SR
.
Page 124
.
Page 125
.
Page 126
.
Page 127
26.87
17.2.1 30 mm thick 8 sqm 4346.70 34774.00 26.87.1 SR
Sub-Total 58111.00
Total 40373420.00
Less Cost Index @1% on SR&DR Total 4,03,73,420.00
-403734.00
Total 39969686.00
18 NON-SCHEDULE ITEMS
18.1 Supplying and filling of locally available Moorum or
kopra(excluding rock) of approved quality in trenches
plinth and sides of foundation etc. in layers not
exceeding 20cm depth consoliding each layer by
ramming and watering for all lead & lift as per the
direction of Engineer-in-Charge. 1356 cum 625.55 848246.00 NS MR
.