Fire NOC Checklist New Industry
Fire NOC Checklist New Industry
Building Details
1. Plinth Area
3. Height of building
5. No. of floors
6. BAR
8. Has Wet riser(s) been provided? (if any, provide no. of wet risers and
their diameter)
Fire NOC Check-List
9. Has Dry riser(s) been provided? (if any, provide Dry riser Details)
10. Has any down comer been provided? (if any, provide Down comer
Details)
11. Whether any water store available? (if any, provide Water quantity
available at Store (In Kiloliter, Distance from Store (In Meter)
12. Has internal hydrant been provided? (If any, water quantity available
at store)
13. Have first aid-hose reels been provided? (If any provide no. of hose
reels)
17. Is the hose reel connected directly to the riser or the hydrant outlet
22. Have branch pipes been provided? (If any, type of branch pipe?)
Others Details
Fire NOC Check-List
26. Is the building equipped with automatic fire detection and alarm
system? If any, provide
29. Has an intercom system been provided between the various floors
and the fire control room in entrance of the building?
30. Has a fire control room be provided in entrance lobby of the building?
31. How many staircases Unit have been provided in the building?
39. The type of doors fitted to the lift car and at each landing?
40. Fire resistance rating of lift car and landing doors, if known
44. Has communication system been installed in the lift for car?
45. Has a fireman’s switch been installed in the lift for grounding it in the
event of fire?
46. Have any stationary fire pump(s) been installed for pressurizing the
wet riser?
47. Size of suction and delivery connection of each pump (whether 100
or 150 mm)
54. The maximum head against which the pump can operate at the
output
60. Has any yard hydrant been provided form the building’s fire pump?
61. Where more than one lifts are installed in a common enclosure have
individual lift been separated by fire resisting walls or 2 hours fire
Fire NOC Check-List
ratting?
62. Has the lift shaft(s) lift lobby or stairwell been pressurized? lobby
details
63. Have the lift lobbies and staircase been effectively enclosed to
prevent fire/smoke entering them from outside at any floor?
64. Have all exits and direction of travel to each exit been sign-posted
with illuminated signs?
65. Has a false ceiling been provided in any protection of the building?
71. If any for insulating any portion of the duct, please also indicate how
the lagging is secured
74. If plonum is used a return air passage has it been protected with fire
detectors?
77. What precautions have been taken to prevent a possible fire in the
transformer(s) from spreading?
82. Please indicate if all fire extinguishers bear the ISI certification mark
83. Whether the refuge area has been provided? /Refuge area details
85. Has the building been protected against lightening? / Does the
lightening protect confirm to any code? Please indicate
87. Has a qualified fire officer been appointed for the building either
individually or jointly with other building(s)