Generator Set Low Water Level Alarm Troubleshooting Guide
Generator Set Low Water Level Alarm Troubleshooting Guide
Troubleshooting Guide
ISSUE 01
DATE 2016-08-29
NOTICE: •Do not add or drain coolant, engine oil, or fuel when the DG is running.
•Do not check the oil level dipstick when the DG is running.
1
GMU Alarm and Troubleshooting Measure
2
1. Check the Coolant Level in the Water Tank
Step 1. Check the coolant level and add coolant if it is insufficient when the generator set
is stopping status. Figure 1-1 shows a coolant filler port. Prepare coolant by
referring to the coolant instructions.
3
2. Check the Water Level Sensor
Step 1: Unplug the sensor connecter and measure the resistance of the water level sensor
contact by using a multimeter.
If the sensor always open no matter the water tank is full or empty, that means the
water level sensor is faulty
Step 3: If water level sensor is ok, but low water level alarm on ECC, please check the
connecting cable from sensor to GMU interface board, follow the chapter 3
0.2 Ω
• If the contact is closed when the radiator is full, proceed with the operations described in
section 3. "Checking the Water Level Sensor Cable Connection“
• If the contact is not closed when the radiator is full, replace the water level sensor
(Huawei part number: 52261420/52260830).
4
3. Check the water level sensor cable connection
Step 1: Check the cable connection between the plug and pin 3 and pin 5 of the J1008
terminal on the GMU interface board.
Figure 3-1 Check the cable connection
5
4. Restoring Components of the Generator Set
After troubleshooting is complete, check and restore the components changed or moved
during the troubleshooting process. Ensure that the fuel pipes of the generator set do not
leak, and the cables are not loose or short-circuited. Set the GMU mode to automatic
before leaving the site.
6
Appendix : Replacing the Water Level Sensor
b
Step 1: Drain the coolant, collect the coolant with a container.
Step 3: Bind the sealing tape on the new sensor for 0.5mm thickness.
Figure 1 Bind the sealing tape on the new sensor for 0.5mm thickness
Step 4: Screw the new sensor on the radiator, the arrow should be downward.
Figure 2 Install the new sensor on the radiator
Step 5: Add coolant to water tank and close the tank cover
7