Boq 1

Uploaded by

roshanregmi97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Boq 1

Uploaded by

roshanregmi97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Description of work Unit Quantity Official Rate

Provisional Sum : Cost for provision of insurance for


the contractor's all risk policy covering all
requirements stipulated in contract document, cost
of lab tests for quality control as per specification,
submission of regular photographic reports of work PS 1.00 169,500.00
progress & other miscellaneous costs as per field
condition and instruction of site incharge all
complete.

Dismantling work of plaster: Dismantling of the


existing plaster on on the top of the roof of the
building complete as per the instruction of Site sqm 177.67 80.73
Engineer.
1

Earth Disposal works: Disposal works of excavated


earth materials to designated disposal site (outside
at least 2 km far from the construction site) as per cum 64.80 606.75
drawing, specification and instruction.
2
Earth filling work: Earth filling & compaction work
by water & ramming with transported earth as per cum 282.82 1,166.78
drawing & specification all complete.
3

Brick on flat Soling Works using old brick: Supply,


laying and compacting old dismantled brick on flat
for base of raft foundation, including filling of voids sqm 81.00 387.89
by river / pit sand, all complete as per drawing,
specification and approval of Engineer.

PCC work 1:2:4 ratio: Supplying, mixing & pouring


plain cement concrete in 1:2:4 cement sand &
aggregate of approved size & quality as specified cum 3.93 13,627.22
thickness in the drawing, compactioning, curing etc.
all complete.
5

Brick masonry work in 1:4 ratio: Chimney made


brick work in cement mortar 1:4 in level upto
ground floor including wetting of bricks, curing of cum 5.78 18,124.07
work, perfect line & level as specified in the
specification & drawings all complete .
6

12.5 mm thick Plaster work in 1:4 ratio: 12.5 mm


thick cement plaster in 1:4 cement & sand for wall
including perfect line & level, curing before sqm 471.41 384.98
plastering & after plastering, cleaning of sand etc. as
per specification all complete.
7
20 mm thick cement plaster in 1:4 ratio: 20 mm
thick cement plaster in 1:4 cement & sand in floor
of the building including perfect line & level with
good finish, curing before plastering & after sqm 23.18 498.59
plastering, cleaning of sand etc. as per specification
all complete.
8
3 mm thick cement punning: 3 mm thick cement
punning in 1:1 cement & sand in floor of the
building including perfect line & level with good
finish, curing before plastering & after plastering, sqm 23.18 284.13
cleaning of sand etc. as per specification all
complete.
9

S/f of 32 mm th. readymade door: Supplying &


fixing of 32 mm thick waterproof plywood door
shutters of both side teak ply with listi on side
including all necessaries such as standard quality of sqm 15.12 7,007.51
mortice lock brass handle, aluminium tower bolt
etc. all complete.
10

Parapet Railing (Steel) Work : Supplying & fixing of


1" dia 3 lines of Stainless Steel inclined pipe, 2'' dia
handrail pipe on 1.5" dia. Vertical post for parapet
wall railing work as per drawing, design and rm 5.00 6,376.75
specification including necessary accessories all
complete.
11
MS Angle/section work : Supply and fitting of MS
angle/section for door frame/ as per requirement all kg 68.40 205.10
complete. 12

S/F of 12 gauge barbed wire : Providing, supplying


and fixing of Galvanised Steel Barbed wire for
fencing to retain horizontal, including necessary
bolts or G.I. barbed wire tied to angle iron, all m 103.00 72.46
complete as per direction of Engineer-in-charge, &
as per drawing, specification (A-1 IS 278).
13

Waterproof Wall putty work : Supplying & applying


2 mm thick Wall Putty (WATER PROOF)
(Asian/Berger or Equivalent) on EXTERNAL SURFACE
WALL and Ceiling of good finish including racking sqm 755.67 275.12
the joint, wetting of surfaces & curing the work and
as per instruction of Engineer all complete.
14

Exterior Emulsion painting work : Supplying and


applying two or more coat WEATHERGUARD 3X
PAINTING-Exterior emulsion paint (Asian/Berger or
Equivalent) with one coat of cement primer of sqm 1006.22 473.01
approved colour in outer side of building including
as per specifications and instruction of the site
engineer in all complete.

15
Plastic emulsion paint : Supplying & applying of
approved color & quality of two or more coats
plastic emulsion paint painting work & one coat of sqm 404.70 423.33
primer paint including wetting of surface as
specified in the specification all complete.
16

Cement Paint painting work : Supply and applying


two or more coat of high quality snowcem cement
paint of high quality with primer over existing
painted surface of wall including supply of sqm 2877.78 121.62
materials, labor cleaning the surface, preparation of
the base , painting & curing etc, all complete as per
drawing, specification and approval of the Engineer.

17

Washable distemper painting work : Supply and


applying two or more coat of distemper paint of
high quality with primer over existing painted
surface of wall including supply of materials, labor sqm 1029.45 177.81
cleaning the surface, preparation of the base ,
painting & curing etc, all complete as per drawing,
specification and approval of the Engineer.

18
Enamel painting work : Supplying & applying of
approved color & quality of two or more coats of
readymade synthetic enamel paint & one coat of
primer paint including surface preparation applying sqm 792.05 322.57
putty etc. as specified in the specification all
complete.
19

Miscellaneous Cost of Labor : Labor cost for site


cleaning and other miscellaneous
repair/maintenance works (such as cleaning old
painted surface before applying new paint, window
repair, door maintenance, plumbing system md 10.00 1,069.50
maintenance to prevent leakages etc.) as per
requirement and instruction of site incharge all
complete. Skilled Manpower

20

Miscellaneous Cost of Labor : Labor cost for site


cleaning and other miscellaneous
repair/maintenance works (such as cleaning old
painted surface before applying new paint, window
repair, door maintenance, plumbing system md 10.00 983.25
maintenance to prevent leakages etc.) as per
requirement and instruction of site incharge all
complete. Semi-Skilled Manpower

21
Miscellaneous Cost of Labor : Labor cost for site
cleaning and other miscellaneous
repair/maintenance works (such as cleaning old
painted surface before applying new paint, window
repair, door maintenance, plumbing system md 50.00 776.25
maintenance to prevent leakages etc.) as per
requirement and instruction of site incharge all
complete. Un-Skilled Manpower

22