Equipment List and Brief Scope of Detailing (Jan, 2023)
Equipment List and Brief Scope of Detailing (Jan, 2023)
Water Coolers = 12
E1110A L= 5.723 m, D= 0.700 m
C1101 overhead cooler
E1110B L= 5.723 m, D= 0.700 m
E1111 K-I cooler L= 5.926 m, D= 0.770 m
E1112 K-II cooler L= 5.926 m, D= 0.770 m
E1113 LGO cooler L= 5.926 m, D= 0.770 m
E1114 HGO cooler L= 5.926 m, D= 0.770 m
E1115 RCO cooler L= 6.444 m, D= 0.770 m
E1117 LPG cooler L= 5.926 m, D= 0.770 m
E1121 HG Cooler L= 5.85 m, D= 0.770 m
E1122 LG Cooler L= 5.81 m, D= 0.863 m
E1151
Desalter water in/out
E1152
Aerocondenser = 5x2
E1123A
E1123B
E1123C
E1123D L=25.5m W= 8.8m H= 6.5m(From 1st
Overhead condenser of C1101
E1123E platform)
E1123F
E1123G
E1123H
E1124A L=6.375m W= 8.8m H= 6.5m(From 1st
Overhead condenser of C1103
E1124B platform)
Pumps = 21
PM1101A
Feed pump
PM1101B
L=2.56m, W=1.2m
PM1102A
Booster pump B1101
Equpiment List: Topping and Fuel gas system
L=2.56m, W=1.2m
Booster pump B1101
PM1102B
PM1103A
K-I
PM1103B
PM1104 K-II
PM1105A
LGO
PM1105B
PM1106 HGO
PM1107A
RCO
PM1107B
PM1108A
Int. reflux
PM1108B
PM1109A
Top reflux
PM1109B
PM1110A
Unstabilized naphtha to C1103
PM1110B
PM1111A
LPG
PM1111B
PM1112A
HG
PM1112B
PM1113A
LG
PM1113B
PM1115 Sepacor
PM1120A
Hot reflux/ Recirculation
PM1120B
PM1121A
Water injection 1st stage
PM1121B
PM1122A
Water injection 2nd stage
PM1122B
PM1123 Separol
PM1124 Caustic
Baloons = 10
B1101 Vertical, flash drum
B1102 3 phase separator
B1103 3 phase separator
B1104 3 phase separator
B1111 Desalter 1st stage
B1112 Desalter 2nd stage
B1105 Sepacor
B1113 Water
B1114 Separol
B1115 Caustic
Columns = 4
C1101 Atmospheric distillation
C1102 Stripper
Equpiment List: Topping and Fuel gas system
C1103 Stabilizer
C1104 Re-distillation
Product tanks-
1. LPG sphere x 2
2. Naphtha
3. JP-1/MTT
4. Petrol, Octane
5. Kerosene
6. Diesel
7. RCO/ FO
8. Bitumen
Sub-Total= 10 nos.
Total = 11 nos tanks
Jetty 1. Gangway with pipeline
2. A model/specimen ship L=25 cm
2. Fire extinguishing system and hydrant
point
Flare system 1x Knock drum
1x flare torch
Equpiment List: Topping and Fuel gas system
Block Comments
Level of detail-
Level of detail- 1. Platforms and
basements 1. Platforms, structures 2.
Block-1 inlet outlet lines 3.
and basements
Block-1 Manholes 2. inlet outlet lines
4. Ladders, if not all,
3. Ladders, a few
if not all, a
just to represent the presence of
few just to represent the presence of itit
4.
Block-2 Fuel suply line
Block-5
Block-5
Block-5