1. Environment, structural requirements, economics, and
quality-Explain the construction
1.1 Construction Method
Process: Laying out floor decks, which are then supported by beams
and columns. For precast systems, panels are lifted into place using
cranes.
1
Process: The external façade is installed to provide insulation,
aesthetics, and protection from the elements.
Resource Use
Waste Management
2
includes sorting materials on-site and sending recyclable materials to
appropriate facilities.
Water Management
Energy Efficiency
3
standards can guide and validate the project's environmental
performance.
4
1.3 Structural
1.3.1 Structural Considerations in Civil Engineering Projects
Structural Design
Foundation Design
Material Selection
5
Strength and Durability: Selecting materials that provide the required
strength and durability for the project. This might include high-strength
concrete, steel with specific properties, or advanced composite
materials.
Construction Techniques
Structural Stability
Load Distribution
Load Paths: Ensuring that loads are effectively transferred through the
structure from the point of application to the foundation. This involves
designing load paths that align with the building’s structural system.
6
Redundancy: Incorporating redundancy into the design to provide
alternative load paths in case of component failure, thus enhancing
overall safety.
Foundation Design: Given the urban site with varying soil conditions, a
deep foundation system using piles was chosen to support the building.
Soil testing informed the pile design to ensure stability and minimal
settlement.
7
Dynamic analysis confirmed the building’s ability to withstand expected
vibrations and sway.
Cost Management
8
expenditures, managing change orders, and forecasting potential cost
overruns.
Financial Planning
Lifecycle Costs
Risk Management
9
Insurance: Obtaining appropriate insurance coverage to protect against
financial losses due to construction accidents, damage, or other
unforeseen events.
Project Scheduling
Project Budgeting:
10
Initial Costs: The project budget included costs for infrastructure (e.g.,
tracks, stations), rolling stock (e.g., trains), and project management.
Detailed cost estimates were prepared based on similar projects and
current market rates.
Cost Management:
Financial Planning:
Lifecycle Costs:
Risk Management:
11
Risk Assessment: Potential risks included construction delays and cost
fluctuations in materials. Contingency plans were developed, and risk
mitigation strategies were implemented.
Project Scheduling:
12
Adherence to Standards: Ensuring that the design complies with
relevant building codes, industry standards, and regulations. This
includes structural integrity, safety features, and functional requirements.
Material Quality
Construction Quality
Quality Assurance
13
Documentation: Maintaining comprehensive documentation of quality
checks, inspections, and tests. This provides a record of compliance and
helps address any quality issues that arise.
Post-Construction Quality
Continuous Improvement
14
Lessons Learned: Documenting lessons learned from the project to
improve future projects. This includes evaluating what went well and
identifying opportunities for enhancing quality practices.
Design Quality:
Material Quality:
Construction Quality:
Quality Assurance:
15
Quality Management Plan: A comprehensive Quality Management
Plan was developed, detailing quality assurance and control procedures.
This included regular audits and inspections.
Building Codes: The project complied with all relevant building codes,
including those for fire safety, structural design, and accessibility.
Post-Construction Quality:
Continuous Improvement:
16
Lessons Learned: A review of the project highlighted successful
practices and areas for improvement, informing future projects.
Types of Risks: Identifying different types of risks that may affect the
project, including:
17
Checklists: Using predefined lists of common risks based on historical
data and industry standards.
Risk Assessment
Risk Matrix: Creating a risk matrix to plot risks based on their probability
and impact. This helps visualize and prioritize risks.
Risk Mitigation
18
Risk Response Plans: Developing detailed response plans for high-
priority risks, outlining specific actions, responsibilities, and resources
required to manage the risks effectively.
Risk Communication
Lessons Learned
19
1.6.2 Bridge Construction Project
Risk Management Considerations
Risk Identification:
Technical Risks: Potential issues with the design of the bridge or the
construction methods used.
Risk Assessment:
20
Risk Analysis: Conducted both qualitative and quantitative analyses to
assess the likelihood and impact of each identified risk. A risk matrix was
used to prioritize risks.
Risk Mitigation:
Risk Communication:
Lessons Learned:
21
Post-Project Review: Conducted a post-project review to evaluate the
effectiveness of risk management practices and identify areas for
improvement.