Audit Report
Audit Report
Audit profile
Contract ID (ZE): 55490230
Standards under contract / ISO 9001:2015 ISO 14001:2015
Audit type nd
2 Surveillance Audit 2nd Surveillance Audit
Transition audit Transition audit
ISO 45001:2018
2nd Surveillance Audit
Transition audit
Surveillance mode Yearlly Surveilllance
Audit team leader Basem Nabil (BN)
E-Mail Audit team leader [email protected]
Audit team Mohamed Abdelaziz (MA)
Technical expert Shehata Dorra (SD)
Trainee None
Observer None
Audited Standards
ISO 9001:2015 SA2
Certificate ID (TP): 4410021370041 Valid until: 08.01.2024
Scope: Design, Supply, Construction, Installation, Operation & Maintenance of Potable & Sewage
Water Treatment Plants and Desalination Plants
Industry / Sector (EA, TB, …) EAC: 27, 28, 39 NACE: 36, 41.2, 37
Non-applicability of chapters: None
No. of considered persons: 731 No. of sites (incl. HQ): 1
Lead auditor: Basem Nabil Audit ID (ZA): ER 0147
ISO 14001:2015 SA2
Certificate ID (TP): 4410421370041 Valid until: 08.01.2024
Scope: Design, Supply, Construction, Installation, Operation & Maintenance of Potable & Sewage
Water Treatment Plants and Desalination Plants
Industry / Sector (EA, TB, …) EAC: 27, 28, 39 NACE: 36, 41.2, 37
Non-applicability of chapters: None
No. of considered persons: 731 No. of sites (incl. HQ): 1
Lead auditor: Basem Nabil Audit ID (ZA): ER 0147
ISO 45001:2018 SA2
Certificate ID (TP): 4412621370041 Valid until: 08.01.2024
Scope: Design, Supply, Construction, Installation, Operation & Maintenance of Potable & Sewage
Water Treatment Plants and Desalination Plants
Industry / Sector (EA, TB, …) EAC: 27, 28, 39 NACE: 36, 41.2, 37
Non-applicability of chapters None
No. of considered persons: 731 No. of sites (incl. HQ): 1
Lead auditor: Basem Nabil Audit ID (ZA): ER 0147
Audit Details
Sites Head Office + Temporary Site
Audit date 01-04.01.2023
Audit duration 7.89 person Days on site (incl. remote locations as applicable) inclusive
0,00 person Days on site for audit stage 1 (separate report)
the consecutive processing of the single sessions with the individual units;
the online interviews with different people from diverse units and various hierarchical levels;
the discussion of appropriate charts, diagrams, slides or any other relevant information;
the presentation and discussion of photos, videos and audios of issues, being prepared on detailed guidance
and governance of the audit team.
Details about reviewed information or documents, interviewed persons, content of videos & photos etc. are
recorded in the report or (handwritten) notes.
If the audit was performed partly remote, the corresponding sessions are identified unambiguously in the audit
plan.
Distribution/Confidentiality/Rights of ownership/Limitations/Responsibilities
This report is sent to the certification body or bodies, the members of the audit team and the audit representative of the
organisation. All documents (such as this report) regarding the certification procedure are treated confidentially by the audit team
and the certification body. This audit report remains the property of the certification body.
An audit is a procedure based on the principle of random sampling and cannot cover each detail of the management system.
Therefore nonconformities of weaknesses may still exist which were not expressly mentioned by the auditors in the final meeting
or in the audit report.
The responsibility for continuous effective operation of the management system always rests solely with the audited and certified
organisation.
Salvo clause:
The audit report will be left to the organisation at the end of the audit - subject to approval by the certification body. The
independent veto process may cause modifications or additions. In these cases a modified revision will be sent to the audited
organisation.
Annex/Enclosures
Annex/ Questionaire(s) / Checklist(s)
corresponding audit documentation Additional annexes, number
Table of Results
Audit results
ISO 9001:2015 ISO 14001:2015 ISO 45001:2018
Clause Rslt.* Clause Rslt.* Clause Rslt.* Clause Rslt.*
Table of Results
Audit results
ISO 9001:2015 ISO 14001:2015 ISO 45001:2018
Clause Rslt.* Clause Rslt.* Clause Rslt.* Clause Rslt.*
progress of planned activities aimed at continual improvement 1
the client’s management system ability and its performance regarding meeting of applicable requirements 1
operational control of the client’s processes 1
review of any changes including the management system documentation 1
use of marks and/or any other reference to certification 1
Rslt.* (Result):
“Empty” = not audited; 1 = fulfilled; 2 = basically fulfilled/ potential for improvement; 3 = not fulfilled/ nonconformity; - = not applicable/ excluded.
Details: see section „Detailed results“
Organisations profil
Companies profile containing following information (this text higlighted yellow is invisble in printed documents)
The International Company for Environmental Technology was established in 1994 as an Egyptian joint
stock company in and the International Company for Environmental Technology as an Egyptian joint stock
company in 2003 with a group of experts specialized in the field of Design, supply, installation, operation
and maintenance of drinking water treatment plants And sanitation, and since its establishment, the
company has gone through stages of development, the results of which were the expansion of its scope of
work and the continuous increase in the number of its employees, and the International Company for
Environmental Technology was merged with the International Company for Environmental Technologies on
22/2/2009 under the name International Company for Environmental Technologies With the aim of
expanding activity at the local and regional levels
Certified Since:
Main Clients
- Sewage and water institute
- New cities institute
Main Processes:
- Top Management.
- Procurement & Purchasing Processes.
- HR and Training Processes.
- Quality Process
- HSE Process
- Technical Office
- Tendering and Customer Services
- Projects Sites
- Projects management
Summary of Results
The present report documents the QMS, EMS & OH&S 2nd Surveillance Audit of the company "
International Environmental Technologies (INTECH)" in the scope of:
The implementation of the systems was examined through various contracts on a random basis. The audit revealed
the effective implementation of all management systems to all departments and activities. The auditor recommends
to continue of the certificates of the company according to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 After
Accepting Action Plan for raising Minor NC
The organization has determined external and internal issues that are relevant to its purpose and its strategic
direction that affects its ability to achieve the intended results of its QMS, EMS & OH&S by applying SWOT method
Organization is understanding its context through determination of these issues with risks and opportunities
and action plan.
The internal / External issues includes for examples::
Commitment of the top management
Proper competence of the persons
Development of the applied technology
Erratic political situations in Egypt and surrounding area
…etc.
Risk based approach (analysis of risks and opportunities) & Hazard Identification
The organization established criteria for risk and opportunity assessment as considered the internal and external
issues and needs and expectation of interested parties
Hazard Identification covered all processes, functions and equipment with risk and opportunity assessment that
determined according to special criteria for severity and probability.
Actions taken to address risks and opportunities are ensuring that it is to be proportionate to the potential impact on
the conformity of Activities
The organization addressed and communicated IMS requirements to the supplier including agencies and
contractor through contracts and service work order. Such as final disposal, treatment, usages etc. need to
consider the environment.
Considering the life cycle perspective when determining the significant environmental aspects:
Organization addressed and communicated IMS requirements to the suppliers including agencies and
contractor through contract and service work order. Such as final disposal, treatment, usages etc. need to
consider the environment.
Information are providing to the relevant personal and/or agencies about potential significant environment
impact associated with the transportation or delivery, use, end-of life treatment and final disposal of it
products, service and activities.
Corrective action bare proposed, if there is any non-achievement of policy and objectives.
The output of this planning in the form inspection plan / process monitoring instructions / operational control
program / management program / operation control procedure / are made and provided at the relevant
stages of processing for implementation.
A00F207e - Audit report-2.doc 8 / 14 Rev. 11/10.22
Audit Report (SA2)
Organisation: International Environmental Technologies (INTECH)
Audits (ZA): ER 0147
Organization evaluates the performance and the effectiveness of the IMS and maintains the records. Environmental
Measurements is done for sites as Noise, Lighting, …etc.
Organization continually improves the suitability, adequacy and effectiveness of the IMS. also considers the results of
analysis and evaluation, and the outputs from management review, to determine if there are needs or opportunities
that shall be addressed as part of continual improvement.
The organization evaluates the performance and the effectiveness of the IMS and maintains the records.
These documents identify such characteristics / indicators for products / services / activities which need to be
constantly monitored to meet the specified requirements against acceptance criteria. These documents are
developed at the system, sub-system and finished product/service/activity levels.
The Organization maintains documented information of its legal and other requirement (compliance obligations).
The organization is maintained records of evaluation of compliance
Applicable Laws and other requirements include:
Egyptian Labor Law No. 12/2003
Egyptian Environmental Law No. 4/94
A00F207e - Audit report-2.doc 9 / 14 Rev. 11/10.22
Audit Report (SA2)
Organisation: International Environmental Technologies (INTECH)
Audits (ZA): ER 0147
Law 154/2007
Law 7/2010
Law 44/2000
Law 148/2019
Decision 458/2007
Management of Change
Organization established a process for Management of Change that implemented and controlled of planned
temporary and permanent changes that impact QHSE performance. Depending on the nature of an expected change,
the organization use an appropriate methodology(ies) for assessing the OH&S risks and the OH&S opportunities of the
change. The need to manage change can be an outcome of planning.
Consultations and Participations
The organization is ensured workers at all levels are encouraged to report hazardous situations by different method
like complaints boxes, HSE Members meeting so that preventive measures can be put in place and corrective action
taken. Consultations and Participations of non-managerial workers occurred by HSE meeting, Computerized program,
E-mails and others
The top management were attended in the closing meeting and recorded by list of participants that also included:
The Management Legally responsible for occupational health and safety : Mr. Islam Eltabay
Personnel Responsible for Monitoring employee’s health: Mr. Islam Eltabay
The Employees representation with responsibility for occupational health and safety: Eng. Hosam Mohamed
Conclusion
Taking into account the size and structure of the organisation, the objectives, the scope of the management system,
the processes and the outcome, the organisation has demonstrated, that it operates its management system in order
to ensure fulfilment of its own requirements, the requirements of its customers and the relevant legal requirements
as well as the applicable requirements of the management system standards.
GP Positive aspects / Positive aspects of the management system worthy of special mention (see also point 4.3 if
Good Practice applicable).
Detailed results
If applicable: Guidance for management of nonconformities
The organization shall perform a root cause analysis for any nonconformity and define adequate corrective actions.
Root cause analysis, corrective actions including action plan for implementation and - if applicable- objective
evidences for performed corrections or containment actions shall be submitted electronically to nominated lead
auditor in charge on time to agreed deadline (latest six weeks after last day of the audit). The lead auditor will review
these documents and shall inform organisation about the result.
The auditee organisation shall implement the corrective actions as defined in the approved action plan and review
the effectiveness of implemented actions.
In the case of major nonconformities (NC A) the lead auditor shall verify the complete and effective implementation
of action plan until agreed date (latest three months after last day of the audit). On decision of the auditor depending
on type and extent of identified nonconformity, this can be done in a follow up audit on site or in a desktop-review of
submitted documentation (objective evidence).
For minor nonconformities (NC B) it can be agreed to perform the verification of effective implementation of action
plan in the next regular audit.
If any nonconformity applies for more than one audited standard, it shall be counted for every applicable standard;
therefore the total number of nonconformity reports can be less than the number of nonconformities.
Recommendations
Results ISO ISO ISO
9001:2015 14001:2015 45001:2018
Fulfilled
Open nonconformities
Not fulfilled
Recommendations
Grant*/ Extension*/ Renewing*
Maintenance*
Suspension
Restoring
Refuse
Withdrawal
*)Grant / Extension / Renewing / Maintenance in the case of open nonconformities assumes that the nonconformities will be
cleared as agreed
Explanation of the terms:
Renewing: New issue of the certificate for the re-certification.
Restoring: End of the temporary invalidity of certificate after the suspension or after delayed re-certification.