0% found this document useful (0 votes)
18 views

DRHT35 BBC

Uploaded by

preetbatra1678
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

DRHT35 BBC

Uploaded by

preetbatra1678
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Hubli Electricity Supply Company (HESCOM)

(Wholly owned Government of Karnataka Undertaking) GSTIN:29AABCH3176JEZZ


Office Of The Assistant Executive Engineer(Ele..),C(O&M), DharwadRSD
RR No. ConnectionID Tariff BillingMonthFrom BillingMonthT PayByDate ReadingDate BillNo
DRHT35 593438 HT-2(a) Sep 2024 Sep 2024 15 Oct 2024 01 Oct 2024 202410059343801
Name & Address : Contract Demand(KVA) 1500.00 90% of CD(KVA) 1350.00
M/S ADM AGRO INDUSTRIES INDIA PVT. LTD. Recorded Demand(KVA) 1351.8 Billing Demand(KVA) 1352
Plot No, Spl Incentive scheme(SIS) No Spl Incentive BaseCons
260-262, Karnataka, Wheeled Energy(Cap) 0.00 Wheeled Energy(Non Cap) 0.00
580011, Open access energy 0.00 Supply Voltage 33/66 KV
BELUR IA, Submeter(same bill) Submeter(seperate bill)
DWD, 560005 CSS Exempted WE(NCS) 0.00
Description MD KWH KVAH PF TOD/Wheeling/Open Access Energy
Pres Reading:01 Oct 2024 0.1502 1320.511 1359.5 0.98 TOD Zone IR FR TOD Units Wheeled Wheeled Open TOD
Prev Reading:01 Sep 2024 0 1257.196 6 to 9 202.41 210.10 69255.00 Units(Cap) 0 Units(Non
0.00 Access
0.00 EC/SIS 0
Difference 0.1502 63.31 9 to 18 420.62 444.39 213921.00 0 0.00 0.00 0
MC 9000 9000 18 to 22 215.16 226.23 99612.00 0 0.00 0.00 0
Consumption 1351.8 569835 22 to 06 418.79 439.58 187047.00 0 0.00 0.00 0
Less/Add:Cons 0 0
Net Cons(ECI) 1351.8 569835 Total 1256.98 1320.3 569835 0 0 0 0
Billing Details Tax Details
Bill Details Units Rate(Rs) Amount(Rs) Tax on Energy charges @ 9% 353867.54
Demand Charges1 1352 340 459680 Tax on Open Access Energy @ 9% 0
Demand Charges2 0 Tax on Wheeled Energy(Captive) @ 20 paise 0
Excess MD Penalty 1 0 0 0 Tax on Wheeled Energy(Non Captive) @ 9% 0
Excess MD Penalty@(HT-5) 0 0 0 Tax Shortclaim
EC Slab 1 569835 6.9 3931861.5 CGST 0
EC Slab 2 0 0 0 SGST 0
EC@HT-5 0 0 Total Tax 353867.54
FAC 569835 -0.19 -108268.65 D&R Fees 0
Sub Meter EC/HVR/IOD -11397 Misc Charges/Tax ShortClaim 0
BBC AMOUNT AS PER MRT 1856149 Total Others 0
REPORT LTR NO:2450-53
DT:09.09.2024
Special Incentive(SIS) 0 Bill Amount 6481892.39
PF Penalty 0 Details of Arrears Amount(Rs)
Rebate/Discount 0 Revenue 0
Cross Subsidy Charges(OAU) 0 0.55 0 Tax 0
Cross Subsidy Charges(Wheeling 0 0.55 0 Interest on Revenue 606.73
Addl Sur charges on OAU 0 1.37 0 Interest on Tax 40.72
Addl Sur charges on wheeled(Non 0 0.82 0 Total Arrears 647.45
Reading Charges 0 0 Total Bill Amount 6482539.84
Audit Short Cliam 0 Amount Payable 6482540
Sixty Four Lakh Eighty Two Thousand Five Hundred Fourty Only.
Total IOD:0.00 ,TDS Deducation:0.00 ,Net IOD:0.00

Amount Under Disputes: Appeal 0 Court Case 0


FOR HUBLI ELECTRICITY SUPPLY COMPANY LTD.,

Assistant Executive Engineer (Ele.,)


Payment Slip

RR No. Tariff SubDivision BillingMonth ReadingDate PayByDate BillNo


DRHT35 HT-2(a) DWDSD Sep 2024 01 Oct 2024 15 Oct 2024 202410059343801
Amount to be paid: Rs.6482540.00 ReceiptNo/Date :

Name ot the Bank Cheque/DDNo Cheque/DD Date Amount(Rs.) Amount in Words

HAVE YOU CHECKED YOUR NAME IN THE ELECTORAL ROLL !?

You might also like