Psoc Assignment 2
Psoc Assignment 2
receiving end
ratio fap sottino fnd
prduet of the two off nominal
fo kv at load bus.
the tap satting o give
Sotution:
I:ts V,dokv
V Vs = aaokv = lp.u
P= So Mw
& = |sl sin ()
=60 MVAR
Wk.T,
ts ty =I
R( P.u) = 20
Á8A
X(p-u) bo
A84
0-124 x0-6)
t -0.43) t
(a-t)*- teho432t,
Let x = tr
a-x)= x-0432 X
4 44322
A 4:4 32 t
ts 0-q5
t 05ab
bs
tr l:0 52b
fom a constant )kv supply .ot the bad end, of the dine
of hne and
rato 132 /n kv The total pedan ce the
are
hansformer
the otge of
of he load bs bar at n kv .Uee base MV4
to0 MVÀ
1:ts
1t is de sirad to have V, V:
P= l00 MW
= cos'lo..4))t-i
Q5841o
6= 48.43 MVAR
ts RP+ Xa Vr
|-0
Vs
(
t=
ts = 1:487
ty =
|t = 0.5419
the e 0o nDMie point for the thre wnitt brow
A Dotevmîne
defiaiy
a to tal
b = 7.4a
b 1.85 a, 0:00|a4
b 7.44 ag 0.0048
Po 8 50 MW
M
6236.1lo.
6&1.s7 681. S
4.4Q2 -7.97
do-0048a.
P3 = l22219M2-A
dC
=0:075 e, + 18 Rs Mwh
dca
Soln
B = -0 o004
L-00004
P, = B Pe 2B, PePaa + Bo Paa
TL, dPL
dPa
dPGa
|- ITL |-ITLa
0 -075 Po t 18
I - 0-003Pe t0-D008 Pas
Paa
la =35158 Mw
Vaa = 36.4 MW
Power foss.
+ (36-4)(o-003a)
|PL -6.826 MW
Total domand
) 51. 58 26.9.
b) Consider
TC; =
the foltowing 3 units
.92
:
O-o0 3124 Pe t 7 Rs mwh
TC; = 0003 se Pe t 7.&5 Ra w
Rs
/M
Detes mine the optmum schedue the loaod is
a ;b = 7.85
ay = 0-00 964 ba 7.97
( 7.92
0-003RE)
P.= 393 MW
P : 334 -53 MN
P3 = 9.I4& - 7.97
b00964
0 69 MW
0-378 M
Pas
015 Mw
34! + (o 469)(60)
Poew +
=334.53 + (o-378)(50
Prns 353.435 Mw
loaw3
7) of
Thee plants a fofal o uantihy c 500 MW are sclhuled
Pp = 31b MW
X
H0
0-075 Y
ax0o6 0075 X
A= 4).33
A| 33 athdo.
P, = 41.33-3o
/P, -94.414MW
P. 44.416 3i1.43
=41:3? 40
P, b65MW
= 65 l5- 66
719 65
Since <Q0
dei
Cons tant
dP,
axo.o6 P t 3o
Pi, ; - &7.037 20, do2.463 MW.
()Ge out
Ha
H
the
full load average
H 5lo
7e +
72 ,
pronty
7.97Pas
ist
of wnt commitrant
o oo142
t O. oD 482 Pa
ung
Jrendata
MwAy
w r
Min CMw) Mox (Mw) Fuel ost ()
6o0
w to0 400
Soluto0:
H (Pan)
Goo
FIAPC)
FLAPC2 k Xx Ha (Pas)
PG t Paa P moz.
4 00
FL ACP = 4.401
Unit 3:
FJAPC = Ks x Hs (Pen)
mox
Unit Commlfment
Combination Mio M) Max (Mw)
300
50
400
Soln
Pr = 3o MW o.8 Pf lagging
I =6 56-08
V =44 325.59.
= 4433 kv
Here A |
B= 5 Jao
IB75.q6
To find kVAR va ting fr ompensdthg egutpment
Here
V = Vy :3:kv (andihon giren)
33= 33 + (20.w)'/30
33
x 30 cos (75.96)
aIA0.62Xy sin(75.4%)
4J5-|e4
332
t 300.14 + 40&r
-408, 0-396,= 35|-20t 300> u4
D-39
Ar43548y- A1R55D 616.O.
039 6Y 2 + 48 Er t 651.34b
Since The
the
Prmor = (-cosp)
B
33
- (1- os (75.46))