Installation Instructions CLNX 1B & Condensing Unit (Direct Expansion) v1

Uploaded by

nhan.bui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

INSTALLATION

INSTRUCTIONS

CLINICAIR 1B

AND CONDENSING UNIT


(Direct expansion)

Page 1 on 12 Installation instructions CLN V1


Probes connections

The temperature and humidity signal cables must not be located near the
220/380 V power supply cables or near the contactors wiring ;this way,
we can avoid the risk of error of
measurement caused by electromagnetic coupling

 Probe air intake

 To take a 2-pair shielded cable between the CLINICAIR® and


the probe
 To connect following the schematics (Refer Technical Manual)

 Probe air supply (if it is not pre-mounted on the Clinicair)


 To take a 2-pair shielded cable between the CLINICAIR® and
the probe
 To connect following the schematics (Refer Technical Manual)

Page 2 on 12 Installation instructions CLN V1


Power connection

The CLINICAIR® must be supplied with 400V + N + T 50Hz, with a quadrupole


curved head protection D of appropriate size

To determine the appropriate protection refer to the power table on the


schematics of CLINICAIR® (see individual data sheet)

To take a cable for the power


supply of the CLINICAIR,
from the electrical box to the
CLINICAIR and connect it
according to the schematics.
(Note the dimensions of the
electrical protections on the
electrical box recommended
on the connection sheet)

Page 3 on 12 Installation instructions CLN V1


INSTALLATION INSTRUCTIONS OF CONDENSING UNIT

1. Mounting

To respect minimum spaces around the


unit external to allow good air
circulation and access for maintenance

The group should be installed on a flat


surface and mounted on anti-vibration
pads

Page 4 on 12 Installation instructions CLN V1


Remove the restrictor located on the
liquid valve of the unit

Install the dryer and sight glass on


liquid line of the unit

(provided by the customer)

Page 5 on 12 Installation instructions CLN V1


2. Refrigeration connections.

2.1. Connection diameters (Refer connections instructions)


Refrigeration piping must be dehydrated refrigerated grade copper (norm EN 12735-1)
2.2. Particular case : condensing unit located at the top of
CLINICAIR

Provide an oil trap at the upflow and


every 3 meters at suction in case of
vertical upflow to the unit compressor.

Maximum drop-off is of 21 meters

Si If the upflow is more than 6 meters


provide 2 pipes for suction and 1 pipe
for liquid line

Page 6 on 12 Installation instructions CLN V1


3. Electrical connections of condensing units (CLNX)

Electrical connections

Power : Refer to the connection


instructions for power cable section.

Control : Cable section 4x1²


Power
2 wires for working
Tp CLN
1 wire for default
Control

3-phase 400V condensing unit

- 1st Circuit

 To take a cable to power the condensing unit between the


CLINICAIR® and the condensing unit

 To Connect the condensing unit power to the terminals and


ground of the CLINICAIR® following the schematis (Refer
technical manual )

 Take a control cable in 4x1² between the CLINICAIR® and the


condensing unit

 To connect the control to the terminals 3 - 6 of condensing unit


and to the terminals of CLINICAIR® following the schematis
(Refer technical manual )

 To connect the default to the terminal 5of the condensing unit


and the terminal on CLINICAIR® following the schematis (Refer
technical manual )

Page 7 on 12 Installation instructions CLN V1


- 2nd Circuit

 To take a cable to power the condensing unit between the


CLINICAIR® and the condensing unit

 To Connect the condensing unit power to the terminals and


ground of the CLINICAIR® following the schematis (Refer
technical manual )

 Take a control cable in 4x1² between the CLINICAIR® and the


condensing unit

 To connect the control to the terminals 3 - 6 of condensing unit


and to the terminals of CLINICAIR® following the schematis
(Refer technical manual )

 To connect the default to the terminal 5of the condensing unit


and the terminal on CLINICAIR® following the schematis (Refer
technical manual )

Page 8 on 12 Installation instructions CLN V1


4. Problems and solutions CLN and condensing unit

DEFAULTS CONDENSING UNIT

DEFAULTS POSSIBLES CAUSES SOLUTIONS


Incorrect freon load Detect and repair the leak
Condenser is dirty Clean the condenser
Inappropriate coolig
Compressor defetc Replace the compressor
Safety pressure HP switch is opened Restart and check
Safety pressure LP switch is opened Restart and check
No electric power Check power supply
Fuse defect Replace the fuse
Wiring defect Check the connections
Compressor and fan (s) not working Defect of the thermostat, relay or thermal
Replace faulty spare part
protection
Compressor defect Replace the compressor
No request Set the thermostat
Anti-short cycle functioning Wait for 3 minutes

Page 9 on 12 Installation instructions CLN V1


DEFAULTS CLINICAIR

DEFAULT POSSIBLES CAUSES (READ DEFAULTS ON HMI) SOLUTIONS

Fire detection defect - Check fire security

Maintenance panel opening defect - Check if door contact is in order (if not replace it)

- Raise fresh air temperature


- Check if antifreeze sensor is in order(if not
Antifreeze detection defect
replace it)
- Check if pre-heating coil is in order (if present)
- Supply fan is stopped
- Fresh air damper is closed. - Check power of supply fan
Electric defect of supply fan
- Check if fan speed is in order (if not replace it)
- Regulatio loops breakage.
- Editing of defect message (display).
- Check if air pressure switch is in order (if not
- LED indicating a defect is in permanent mode. Air flow defect of fan supply
replace it)
- Check wiring of fresh air damper
Fresh air damper defect (valid if fresh air option)
- Check if fresh air damper is in order

- Check probe wiring on electric coil


110°C thermostat defect (valid if BE1 or BE2 option) - Check wiring and electric coil
- Check air flow

- Replace air supply filter / Check supply filter


Air supply filter clogging alarm
- Alarm message on front panel pressure switch
- Flashing of defect led - Replace air intake filter / Check intake filter
Air intake filter clogging alarm
pressure switch

Page 10 on 12 Installation instructions CLN V1


DEFAULT POSSIBLES CAUSES (READ DEFAULTS ON HMI) SOLUTIONS

High temperature alarm at air supply


- Check if heating coil is in order (if present)
High temperature alarm at air intake
- Check if cooling coil is in order (if present)

Low temperature alarm at air supply


- Check if heating coil is in order (if present)
Low temperature alarm at air intake
- Check if cooling coil is in order (if present)
High hygrometry alarm at air supply
- Check if de-humidier is in order
Low hygrometry alarm at air supply
- Check if humidier is in order
- Check T° air intake probe value and replace if
T° probe alarm at air intake
necessary
- Check T° air supply probe value and replace if
- Alarm message on front panel T° probe alarm at air supply
necessary
- Flashing of defect led T° probe alarm at preheating (valid if preheating hot - Check T° preheating probe value and replace if
water or electric) necessary
- Check T° fresh air probe value and replace if
T° probe alarm at air supply (valid if fresh air option)
necessary
- Check electric supply of condensate pump
Electrical defect alarm of condensate pump (valid if
(replace it if out of order)
condensate pump option)
- Check probe wiring on electric coil
70°C thermostat defect (valid if BE1 or BE2 option) - Check wiring and electric coil
- Check air flow
Fres air electrical fan alarm (valid if fresh air fan
- Check power supply fresh air fan
option)
Air extraction electrical fan alarm (valid if extraction
- Check power supply air extraction fan
fan option)

Page 11 on 12 Installation instructions CLN V1


ATA SAS
16 rue Jules Verne
44700 ORVAULT
TEL : 02.40.92.03.00
FAX : 02.40.92.08.22

AGENCE ILE DE FRANCE


1 rue Boole
91240 Saint-Michel-sur-Orge
TEL : 01.80.75.00.25
FAX : 02.40.92.08.22

E-mail : [email protected]

www.ata-medical.com

Page 12 on 12 Installation instructions CLN V1