Installation Instructions CLNX 1B & Condensing Unit (Direct Expansion) v1
Installation Instructions CLNX 1B & Condensing Unit (Direct Expansion) v1
INSTRUCTIONS
CLINICAIR 1B
The temperature and humidity signal cables must not be located near the
220/380 V power supply cables or near the contactors wiring ;this way,
we can avoid the risk of error of
measurement caused by electromagnetic coupling
1. Mounting
Electrical connections
- 1st Circuit
Maintenance panel opening defect - Check if door contact is in order (if not replace it)
E-mail : [email protected]
www.ata-medical.com