Enkei GVDP Earn Programme 2012
Enkei GVDP Earn Programme 2012
Sr. EARN
Saving OBJECTIVE
No. PILLAR
TARGET
S.NO
S.NO
1480units/day 1
on 22 LPDC
on-50 ton/D of Reduce energy consumption
ENERGY
capacity by 80 Kw to 36 Kw, 2
3
and as well as lining pattern
from glass wool lining to
Hiseal Board in 04 LPDC 3
machine .
EARN PROGRAM /
S.NO
1
Providing shut off valve in All
ENERGY
S.NO
1
Reduce furnace oil
ENERGY
S.NO
1
All Legal REGULAR MONITORING OF 2
9 requirements ALL APPLICABLE LEGAL 3
identified. REQUIREMENTS 4
5
6
7
12.5
2.4
EARN PROGRAM / PROJECTS FOR YEAR 2011-12
TIME BOUND PROGRAM
RESPONSIBILI
ACTIVITY TY June July August September October
Procurement of air booster for suitable rating . Mr. Ashwani
RESPONSIBILI
ACTIVITY TY June July August September October
Material procurement for new lining Mr. Pramod
RESPONSIBILI
ACTIVITY TY June July August September October
Review of all legal requirements Mr.Arvind
Do gap analysis Mr.Arvind
Updating in related chapters Mr.Arvind
Document control compliance Mr.Arvind
Training for regular update Mr.Arvind
Training of Legal register Mr.Arvind
Audits of legal register Mr.Arvind
2011-12
PROGRAM
Calculation
TIMINGS
October November December January February March April May
160
TIMINGS
October November December January February March April May
360
TIMINGS
October November December January February March April May
800
2011-12
TIMINGS
October November December January February March April May 160
TIMINGS
October November December January February March April May
TIMINGS
October November December January February March April May
2011-12
TIMINGS
October November December January February March April May
TIMINGS
October November December January February March April May
112500
2009-2010 2010-20
EARN PILLER HEAD EARN Program Program Program Carry Investme saving EARN Program
Taken Completed Forword nt (Lac) (Lac) Taken
Energy Management 5 4 1 4.49 5.68 7
Water Management 4 4 0.37 3.9 3
waste Management 5 4 2 5.5 4.8 7
Prevention of Poloution 3 3 6 0 6
6 5 3 27.86 51.96
ENERGY MANAGEMENT -EARN PROGRAME (Indicator - Specific
YEAR current
Target Actual
Base line data Present level Producti
value Achived
on level
224
2008-
627364 551213 657063 551213 TON/MO
2009
NTH
300
2009-
690220 559287 466749 559287 TON/MO
2010
NTH
300
2010-
559287 450000 450000 450000 TON/MO
2011
NTH
500
2011-
720000 720000 44400 675600 TON/MO
2012
NTH
-EARN PROGRAME (Indicator - Specific KWH Consumption)
Energy
investme Amount
saving
Projects under taken nt In saving in
KWH/An
(lacs) (Lacs)
um
TO REDUCE POWER CONSUMPTION BY CHANGING 2 No's
SILICARB FURNACE TO CRUCIBLE TYPE FURNAC
TO REDUCE POWER CONSUMPTION BY PROVIDING ON OFF TIMMER
FOR SHOP FLOOR LIGHTING
TO REDUCE POWER CONSUMPTION BY PROVIDING TEMPERATURE
CONTROLLER IN COOLING TOWER RC FAN MOTOR
4.49 105850 5.68
POWER CONSUMPTION TO BE REDUCED BY PROVIDING
CAPACITOR BANK FOR IMPROVEMENT OF POWER FACTOR
FROM .96 TO UNITY.
PROVIDED THYRISTOR DRIVE FOR H/T FURNACE
K
TO REDUCE POWER CONSUMPTION BY CHANGING 2 No's SILICARB
FURNACE TO CRUCIBLE TYPE FURNAC 900000
TO REDUCE POWER CONSUMPTION BY PROVIDING PROPER 800000
INSULATION ON TOP OF FURNACE COVER 700000
O REDUCE POWER CONSUMPTION BY REDUCING THE MOTOR 600000
CAPACITY FROM 15 HP TO 7.5 OF COLLING TOWER PUMP
500000
POWER CONSUMPTION REDUCE PROVIDING CENTRILIZED POWER 24.2 805190 60.38 400000
PACK SYSTEM FOR ALL 7 GDC MACHINE 300000
Reduce energy consumption in C/S machine by providing heat 200000
resistance plate and heater position to be changed 100000
Improve main header of compressor discharge 0
Power saving by doing automation in fume exhaust system 09
20 -2
0
REPLACED ALL METAL HELID STREET LAMPS BY ENERGY EFFECENT
0 8- 0 9
20 20
LIGHTS .
REDUCE POWER CONSUMPTION BY MODIFYLING HYDRAULIC
POWER PACK MAIN LINE AND IN PUMP IN BOTH LPDC LINE
REDUCTION OF ENERGY CONSUMPTION IN LPDC HOLDING
FURNACE BY CHANGING LINING PATTERN . 14 460800 34.56
REDUCE FURANCE OIL CONSUMPTION BY PROVIDING LADDAL
PREHEATING SYSTEM IN MELTING SECTION .
224
2008-
1392KL 950 KL 750 KL 950 KL TON/MO
2009
NTH
300
2009-
950 KL 950 KL 900 KL 923 KL TON/MO
2010
NTH
300
2010-
950 KL 950 KL 900 KL 860 KL TON/MO
2011
NTH
ARN PROGRAME (Indicator - Specific KL Consumption)
Investme Water Amount
Projects under taken nt In saving saving in
(lacs) KL/Anum Rupees
Re-cycling of quenching water
Push button on each tap
Canteen waste water to used for land escaping 0.37 5304 KL 3.9
Use of STP water for gardening,shop floor cleaning
YEAR current
Base line data Present level Target value Actual Achived Producti
on level
224
2008-
240 TON 210 TON 200 TON 210 TON TON/MO
2009
NTH
300
2009-
235 TON 212 TON 200 TON 212 TON TON/MO
2010
NTH
300
2009-
220 220 175 182 TON/MO
2010
NTH
PROGRAME (Indicator - Kg Reduction)
Waste
Investme Reductio Amount
Projects under taken nt In n in saving in
(lacs) (Tons/An Rupees
num)
Re-use of un-burnt sand
Nozzle change at defined frequency to
avoid sand waste 4.5 240 4.8
Repleaeced CI stalk by ceramic stalk
Reuse of alum. Chips/ Flashes
Re-use of un-burnt sand
Nozzle change at defined frequency to
avoid sand waste
Rectification in die gap
Automation in c/s m/c for shooting
provided ms plate to collect unburnt
sand 7.4 216.48 7.7
Provided a frame to reduce wastage of
ceramic blanket in LPDC furnace
Water Con
4.50
Nos of 4.00
Correspo Total
EARN Water 3.50
nding Water Investme Water
Year Program Saving
Producti Consume nt (Lacs) Cons./Tons 3.00
Impleme (KL)
on (Tons) d (KL) 2.50
nted 2.00
1.50
2009-2010 2665.64 11400 4 0.37 5304 4.28 1.00
0.50
2010-2011 3711.23 11076 2 1.37 600 2.98 0.00
2011-2012 5216.82 10320 1 4.8 670 1.98
10 11 12
2012-2013 5216.82 10320 0 0 670 1.98 20 20 20
0 9- 1 0- 1 1-
20 20 20
Energy Cons./Tons
Energy
Cons./Tons
10 11 12 13
20 20 20 20
0 9- 1 0- 1 1- 1 2-
20 20 20
Water Cons./Tons
Water
Cons./Tons
10 11 12 13
20 20 20 20
0 9- 1 0- 1 1- 1 2-
20 20 20
Supplier Name: Alicon Castalloy
PILLAR HEAD
WASTE MANAGEMENT
PREVENTION OF POLLUTION
MIS
FY: 2009 -2010
Investment
Brief Description of each Earn programs
(Rs Lacs)
1-TO REDUCE POWER CONSUMPTION BY CHANGING 2 No's SILICARB
FURNACE TO CRUCIBLE TYPE FURNAC .
2-TO REDUCE POWER CONSUMPTION BY PROVIDING ON OFF TIMMER FOR
SHOP FLOOR LIGHTING . 3-TO
REDUCE POWER CONSUMPTION BY PROVIDING TEMPERATURE
CONTROLLER IN COOLING TOWER RC FAN MOTOR . 4- 4.9
POWER CONSUMPTION TO BE REDUCED BY PROVIDING CAPACITOR BANK
FOR IMPROVEMENT OF POWER FACTOR FROM .96 TO UNITY. 5-
PROVIDED THYRISTOR DRIVE FOR H/T FURNACE
5.68
3.9
4.8
0
Supplier Name: Alicon Castalloy
PILLAR HEAD
WASTE MANAGEMENT
PREVENTION OF POLLUTION
MIS
FY: 2010 -2011
Investment
Brief Description of each Earn programs
(Rs Lacs)
1- TO REDUCE POWER CONSUMPTION BY CHANGING 2 No's SILICARB
FURNACE TO CRUCIBLE TYPE FURNAC .
2- TO REDUCE POWER CONSUMPTION BY PROVIDING PROPER INSULATION
ON TOP OF FURNACE COVER . 3. REDUCE
POWER CONSUMPTION BY REDUCING THE MOTOR CAPACITY FROM 15 HP
TO 7.5 OF COLLING TOWER PUMP . 4- POWER
CONSUMPTION REDUCE PROVIDING CENTRILIZED POWER PACK SYSTEM
FOR ALL 7 GDC MACHINE . 5 - Reduce
24.2
energy consumption in C/S machine by providing heat resistance
plate and heater position to be changed . 6 - Improve main
header of compressor discharge . 7- Power saving by
doing automation in fume exhaust system
60.38
2.31
7.7
12
Supplier Name: Alicon Castalloy
PILLAR HEAD
WASTE MANAGEMENT
PREVENTION OF POLLUTION
MIS
FY: 2011 -2012
Investment
Brief Description of each Earn programs
(Rs Lacs)
1- REPLACED ALL METAL HELID STREET LAMPS BY ENERGY EFFECENT LIGHT
2- REDUCE POWER CONSUMPTION BY MODIFYLING HYDRAULIC POWER
PACK MAIN LINE AND IN PUMP IN BOTH LPDC LINE .
3.REDUCTION OF ENERGY CONSUMPTION IN LPDC HOLDING FURNACE BY
CHANGING LINING PATTERN . 4-
REDUCE FURANCE OIL CONSUMPTION BY PROVIDING LADDAL PREHEATING 14
SYSTEM IN MELTING SECTION . 5 -REDUCTION
IN FO OIL BY DOINING RELINING PATTERN MODIFIED .
34.56
36.75
0
Supplier Name: ALICON CAST ALLOY
Phase: 4
Legal Compliance Management
ASSESMENT OF LEGAL STATUS - PREVIOUS YEARS
Complianc
e Mgmt.
Licence/Consent Reqmts 2009 2010 2011 Valid Upto Plan Remarks
- -
Factory Current Licence Ref HP
9919
Manpower
Licenced Production
Corrosponding Production