System Handover Certificate

Serendah
South
SASA AcisProduction-A
Satellite
GASLIFT (SNPA)
(SASA)
FLOWLINES Surface Sand Management
Topside
RE-COMMISSIONING

Rev: 0

Client : PTTEP Sarawak


SarawakOil
OilLimited
Limited Date :

System : 06 Description : Gaslift System (SASA-20)

Outstanding A Punch Items: 0

Outstanding B Punch Items: 0

Total SSH: 1
16 Outstanding SSH: 0
16

This Certificate confirms All CTP is complete and all SubSystems are commissioned. All category punch list items are complete (except
agreed as
agreed as exception
exception with
with BDEWC/Client
DESB/Client Comm/OPS)
Comm/OPS)

Item Description YES NO N/A Remarks


01 MC Certificate Complete
02 SSH Certificate Complete
03 "A" Punch List Items Cleared
04 Drawing As Built(Redlined)
05 TQ,SI,CCN & NCR Closed
06 Confirm CTP complete
07 SAT Report (If any)
08 Vendor Report Closed
09 Temporary Isolation Removed
10 Preservation Performed (If req’d)
11 Areas are Clean and Safe
12 System is Safe for operation and put in service
13 Third Party Certification Complete Refer piping ITR Flange Management Certificates
14 All Permits Cancelled
15 All Safety Check is Complete
16 Cause & Effect test Complete Gaslift Header's PCS Instruments
17 System integration test Complete
18 System interface with relevant other System are Complete
19 All SP item are installed Complete with internal assemblies
20 Performance and endurance test of the system is complete
21 Handover of commissiong spares tools
22 Handover of software copies
23 Handover of keys (panels)
Handover of SP item
24 - Corrossion coupon and holder
- Corrossion probe
Adequate hands on training is given to Ops personel on system operation
25
(Basic)
Comment:
· Explanation required in this section for anything ticked an 'No'.
· The above system has satisfied the agreed acceptance contents as per Commissioning Manual and is ready for acceptance into service
with the excpetion of those items listed on the attached outstanding work list. These items shall not compromise the safe operation of the
System.
· By signature of this certificate, Operations accept responsibility for the operational and maintenance of the System and all parts of the
System

Completed By DESB COMM. Verified By Client COMM. Accepted By Client OP.

Name:

Position:

Date:

Signature: