0% found this document useful (0 votes)
75 views2 pages

Gujarat Technological University

Uploaded by

Mitesh Purani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views2 pages

Gujarat Technological University

Uploaded by

Mitesh Purani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Seat No.: ________ Enrolment No.

___________

GUJARAT TECHNOLOGICAL UNIVERSITY


MBA - SEMESTER– III EXAMINATION – WINTER 2020
Subject Code:4539285 Date:02/01/2021
Subject Name: Project Management (PM)
Time:10:30 AM TO 12.30 PM Total Marks: 47
Instructions:
1. Attempt any THREE questions from Q1 to Q6.
2. Q7 is compulsory.
3. Make suitable assumptions wherever necessary.

Q.1 a Each question carries 02 marks: 06


(a) What is the meaning of ‘Project Network’?
(b) Define ‘Project Control’.
(c) What is ‘WBS’?

Q.1 b Each question carries 02 marks: 06


(d) What do you mean by ‘Project Life Cycle’?
(e) Define ‘Risk Management’.
(f) What is ‘Project Identification’?

Q.2 (a) In risk management process, risk assessment is one of the most important 06
steps. Discuss with example.
(b) Discuss the best practices in outsourcing the project work. 06

Q.3 (a) Describe the five-stages of project team development model. 06


(b) Suppose you are conducting an audit of the new bridge construction 06
project. What are the main points of focus as an auditor? Discuss the
same with project audit process.

Q.4 (a) Discuss various types of project terminations with examples. 06


(b) Depict your understanding for “Work Breakdown Structure”. Develop 06
WBS for a project of making a small sized car suitable for Indian
environment.
Q.5 (a) Explain Project Life Cycle with diagram and clearly relate all the stages 06
with suitable examples.
(b) How you can evaluate the performance of a team in the post 06
implementation evaluation of Project.

Q.6 (a) Discuss the three problems that lead to the need for an effective project 06
portfolio management system.
(b) Explain different three types of matrix structures for organizing a project. 06
Q.7 Mr. Kapil Gohel has completed his engineering from one of the premier 11
institutes of management in India. He did his specialization in the field of
production engineering. After pursuing this degree, he worked in a
leading corporate, for a period of two years. During that time period, he
realized that he should start some business of his own instead of working
for others and he decided to start his production unit. He has thought of
setting up banana fiber extraction unit in Gujarat. During his study, he
came across this project and saw a great opportunity in this field. He
1
needs Rs. 20 lakhs (fixed and working capital) to start this unit. He is
able to manage Rs. 5 lakhs from his internal sources. He is exploring
various other options for raising the balance amount. He is approaching
the investors. But everyone is demanding a project proposal. Since he is
an engineer, he has technical knowhow but lacks expertise in writing a
business plan.

Based upon the above case, please answer the above questions and make
suitable assumptions wherever required.
1 Please guide Mr. Kapil Gohel on the content of writing a project Report
for this proposed venture.
2 Mr. Kapil is evaluating various debt and equity options for raising the
fund required for his project. Please advise him which option is best
suited in this situation and why? Also guide him specifically for various
products and services of Small Industries Development Bank of India
(SIDBI).
OR
Q.7 (a) Some of the organizations outsource their projects, due to the shortage of 5.5
resources and expertise. Which are the key points that an organization
should consider while outsourcing?
(b) Why team work is important in Project Management? Explain the Salient 5.5
Features of Project Management.

*************

You might also like