Action Plan
Action Plan
22/12/2023
20/12/2023:Feedback pending.
21/12/2023:Review to be done on cw52
15-01-24:Due date updated due to the change of
the process to in beKW 05 .22/12/2023
Project status Structure reviwed
Status ASSIGNED
Project Priority SOP Date TASK Details PROGRESS START Due date PE Quality Status comment
08-02-24 : IQS PFMEA -pending.
Review Planning is
( SOP ) TO 20/12/2023:Feedback
provided but to add to
21/12/2023:Review thebeexact
doneprojects
on cw52affected
MS contact element 1 Wk01/24 Overdue Create unique processes in 1st level Done but to be revised for the shared Chaimae El Bouhssini 80% 9/1/2023 13/12/2024 Chaimae El BouhssiHind Doukkali New 13-02-24 : Management
15-01-24:Due date updatedmeeting done
due to thetochange
be of
comments Wk28 Jaouhary, Karim alligned about
the process the 05
in KW FMEA /CP between Engineering
& quality -
08-02-24 :: CP Under validation
IQScreated
PFMEA & of
- Review the planning
Planning is by
Done but to be revised for the shared Hind Doukkali 08-02-24
definningbut the topriorities released but to be
MS contact element 1 Wk01/24 Overdue Create Second level PFMEA Chaimae El Bouhssini 80% 10/10/2023 13/12/2024 Chaimae El BouhssiJaouhary, Karim New provided
updated inadd
thethe exactofprojects
FMEAonaffected
comments Wk28 15-02-24based
13-02-24 : Management
: Due dates update
updated based
meeting done the
to be
13-02-24
provided : Management meeting done to be
planning
Done but to be revised for the shared Hind doukkali Hind Doukkali alligned about
alligned about the FMEA
the FMEA /CP
/CP between
between Engineering
Engineering
MS contact element 1 Wk01/24 Overdue Create Control Plan 80% 10/15/2023 13/12/2024 Chaimae El BouhssiJaouhary, Karim New 17.05.24
& quality :-- AUnder
review
Under of SOP &ofpriority
validation & PFMEA
the planning
planning by due
comments Jaouhary, Karim Wk28 & quality
dates donethe validation
( Alignement ofEngineering's
with the by
definning
definning the priorities
priorities
manager )
15-02-24 :: Due Due dates
dates updated
updated based
based on
on the
the
MS contact element 1 Wk01/24 Finished Balloon drawings 1260685811 Hayat El Azzouzi 100% 10/9/2023 10/13/2023 Chaimae El BouhssiHind Doukkali New 15-02-24
Done
1260685812 provided
provided planning
planning
08.02.24:No update provided
MS contact element 1 Wk01/24 Finished Visual aids Asmae Faquihi 100% 10/10/2023 2/15/2024 Chaimae El BouhssiHind Doukkali New 15-02-24 : 100% implemented
( wwiqs.elharrakzohra )
MS contact element 1 Wk01/24 Finished Create inspection points (validation repports) Hind Doukkali 100% 10/18/2023 5/13/2024 Chaimae El BouhssiHind Doukkali New
MS contact element 1 Wk01/24 Finished Create inspection points (Shipping Audit) 1260685811 Asmae Faquihi 100% 10/18/2023 10/31/2023 Chaimae El BouhssiHind Doukkali New
1260685812
MS contact element 1 Wk01/24 Finished Create incoming inpsection points for all 10032575-10032573-10032572-10033553- Sanae El outmani/Imane Fahmi 100% 9/1/2023 Chaimae El BouhssiHind Doukkali New
components 10032536-10004079-10032574 11/18/2023
MS contact element 1 Wk01/24 Finished Create SFGs inspection points 50043636 Mouzoune Mohammed 100% 10/18/2023 10/18/2023 Chaimae El BouhssiHind Doukkali New
50043637
MS contact element 1 Wk01/24 Finished Create SPC dummies 10004079 ( Wire SAP 10032536 Sec 0.25 ) Badr Ghississ 100% 10/18/2023 18/10/2023 Chaimae El BouhssiHind Doukkali New
23/10/2023
20/12/2023:Feedback pending
MS contact element 1 Wk01/24 Finished Definition of process which need IQS Only cutting Chaimae El Bouhssini / Hind Dou100% 3/7/2024 3/7/2024 Chaimae El BouhssiHind Doukkali New 21/12/2023:Updated status to be provided by
CW01
16-01-24 : Due date updated
MS contact element 1 Wk01/24 Finished Creation of session / Installation of IQS Implemented for cutting only Atlas, Abderrahmane 100% 3/7/2024 3/7/2024 Chaimae El BouhssiHind Doukkali New 08-02-24 : IQS PFMEA - Review Planning is
10/11/2023 provided but to add the exact projects affected
21/11/2023 08-02-24 : IQS PFMEA - Review Planning is
ADM RoP 1 W33/24 Finished Create unique processes in 1st level Chaimae El Bouhssini 100% 9/1/2023 26-01-24 Chaimae El BouhssiAicha Jlih New provided but to add the exact projects affected
15/11/2023
18-12-24 13-02-24 : Management meeting done to be
21/11/2023
02-04-24 20/12/2023:Feedback
alligned about the FMEA pending
/CP between Engineering
ADM RoP 1 W33/24 Finished Create Second level PFMEA Chaimae El Bouhssini 100% 11/10/2023 30-01-24 Chaimae El BouhssiAicha Jlih New 21/12/2023:Updated status of
& quality - Under validation to the
be provided
planning by
18/11/2023
18-12-24 CW01
definning the priorities
22/11/2023
02-04-24 08.02.24
15-02-24 :: CP
Duetodates
be created after
updated release
based of FMEA
on the
ADM RoP 1 W33/24 Finished Create Control Plan Aicha Jlih 100% 11/15/2023 02-02-24 Chaimae El BouhssiAicha Jlih New 13-02-24 : Management meeting done to be
provided planning
18-12-24
01/11/2023 alligned
19-03-24about
: Duethe FMEA
dates /CP between
updated based onEngineering
SOP date
02-04-24
24/11/2023 & quality - Under validation of the planning by
ADM RoP 1 W33/24 Finished Balloon drawings ZF01C41001F / ZF01C41001K Hayat El Azzouzi 100% 10/1/2023 01/01/2024 Chaimae El BouhssiAicha Jlih New Done
definning
08.02.24: theupdate
No priorities
provided
24/11/2023
12-01-24 14.02.24
14-02-24 :: Planning to be
still pending asprepared
the PFMA&still
provided
not yet
ADM RoP 1 W33/24 Finished Visual aids Asmae Faquihi 100% 10/18/2023 02.02.24 Chaimae El BouhssiAicha Jlih New 19.03.24 : Trained person on sick leave ( Back up
implemented.
20/03/2024
18/11/2023 on going ): Management meeting done to be
13-02-24
09/04/24
24/11/2023 09.04.24: packaging instruction to be added
alligned about the FMEA /CP between Engineering after
ADM RoP 1 W33/24 Finished Create inspection points (validation repports) Aicha Jlih 100% 10/18/2023 09-02-24 Chaimae El BouhssiAicha Jlih New confirmation
& quality - Under validation of the planning by
18-12-24
18/11/2023 definning the priorities
08.02.24: No update provided
08-04-24
02-02-24 15-02-24 :: Planning
14.02.24 Due datestoupdated based&on
be prepared the
provided
ADM RoP 1 W33/24 Finished Create inspection points (Shipping Audit) Asmae Faquihi 100% 10/18/2023 20/03/2024 Chaimae El BouhssiAicha Jlih New provided :planning
19.03.24 Trained person on sick leave ( Back up
10017572 19-03-24
10000071 18/12/2023
09/04/24 on going ): Due dates feedback
20/12/2023:Pending
updated based on SOP date
ADM RoP 1 W33/24 Finished Create incoming inpsection points for all 10000341 Sanae El otmani 100% 9/1/2023 12/01/2023 Chaimae El BouhssiAicha Jlih New
components 22-04-2024 21/12/2023:Updated planing to be prepared by
10000342
1125_50043479 15/04/24 sanae for the enw project.Updated status to be
10002828
1125_50043481 18/11/2023 shared on CW01.
ADM RoP 1 W33/24 Finished Create SFGs inspection points 1125_50043483 Mouzoune Mohammed 100% 10/18/2023 12/12/2023 Chaimae El BouhssiAicha Jlih New
10000341 ( Ter Wire SAP 10033055 Sec 0.50 )
1125_50044025
10000342 ( Ter Wire SAP 10033055 Sec 0.50 ) 18/11/2023
ADM RoP 1 W33/24 Finished Create SPC dummies 10006374 ( Ter Wire SAP 10033055 Sec 0.50 ) Badr Ghississ 100% 10/18/2023 12/12/2023 Chaimae El BouhssiAicha Jlih New
Processes
10028404 need IQS :SAP 10033055 Sec 0.50 )
( Ter Wire 02/04/24
Cutting
10033131: 0 (cut
Ter Wire SAP 10033055 Sec 0.50 )
ADM RoP 1 W33/24 Finished Definition of process which need IQS Preassy : Double crimping / Welding & spacer Chaimae El Bouhssini / Aicha Jli 100% 4/2/2024 4/2/2024 Chaimae El BouhssiAicha Jlih New
assembly
Assembly : 2 crimping machines 05/04/2024
ADM RoP 1 W33/24 Finished Creation of session / Installation of IQS Session created/ IQS installed Atlas, Abderrahmane 100% 4/2/2024 09/04/24 Chaimae El BouhssiAicha Jlih New
5/12/2023 08-02-24 : IQS PFMEA - Review Planning is
08-03-24 provided but to add the exact projects affected
ECM 2.0 1 W13/24 Finished Create unique processes in 1st level Chaimae El Bouhssini 100% 10/1/2023 18-08-24 Chaimae El BouhssiImane Fahmi New 15-02-24 :: IQS
08-02-24 DuePFMEA
dates updated
- Reviewbased on the
Planning is
05/12/2023
02-04-24 provided but
provided planning
to add the exact projects affected
08-03-24 19-03-24
15-02-24 :: Due
Due dates
dates updated
updated based
based on
on SOP
the date
ECM 2.0 1 W13/24 Finished Create Second level PFMEA Chaimae El Bouhssini 100% 11/29/2023 18-08-24 Chaimae El BouhssiImane Fahmi New provided planning
02-04-24
15/03/2024 19-03-24
15-02-24 :: Due
Due dates
dates updated
updated based
based on
on SOP
the date
ECM 2.0 1 W13/24 Finished Create Control Plan Imane Fahmi 100% 12/15/2023 18-08-24 Chaimae El BouhssiImane Fahmi New provided planning
05-04-24 19-03-24 : Due dates updated based on SOP date
ECM 2.0 1 W13/24 Finished Balloon drawings Drawing available - Z3134462448 Hayat El Azzouzi 100% 11/1/2023 15/03/2024 Chaimae El BouhssiImane Fahmi New
25-03-24
14.02.24 : Planning to be prepared & provided
ECM 2.0 1 W13/24 Finished Visual aids Asmae Faquihi 100% 11/29/2023 20/03/2024 Chaimae El BouhssiImane Fahmi New 15-02-24 : Planning provided
18/4/24 19.03.24 : Trained person on sick leave ( Back up
14.02.24
on going ): Planning to be prepared & provided
ECM 2.0 1 W13/24 Finished Create inspection points (validation repports) Imane Fahmi 100% 18/08/2024 Chaimae El BouhssiImane Fahmi New 15-02-24 : Due dates updated based on the
05-04-24 provided planning feedback
20/12/2023:Pending
19-03-24 : Due dates updated
21/12/2023:Updated based
planing to on SOP date
be prepared by
ECM 2.0 1 W13/24 Finished Create inspection points (Shipping Audit) Asmae Faquihi 100% 3/15/2024 20/03/2024 Chaimae El BouhssiImane Fahmi New sanae for the enw project.Updated status to be
18/4/24 shared on CW01.
Create incoming inpsection points for all 12/18/2023 15/01/24 : No BOM shared so far so far ( No
ECM 2.0 1 W13/24 Finished components Sanae El otmani 100% 11/1/2023 06/04/24 Chaimae El BouhssiImane Fahmi New documentations available to be implemented in
23/04/24 IQS )
08.02.24 : BOM provided ( Documentations ubder
ECM 2.0 1 W13/24 Finished Create SFGs inspection points Mouzoune Mohammed 100% 11/18/2023 3/26/2024 Chaimae El BouhssiImane Fahmi New request by QA management )
16.04.24: Due date postponed as we had other
15/03/2024 project as priority
ECM 2.0 1 W13/24 Finished Create SPC dummies Badr Ghississ 100% 11/18/2023 19/04/24 Chaimae El BouhssiImane Fahmi New 28.03.24 : Due date postponed upon request
Processes need IQS :
ECM 2.0 1 W13/24 Finished Definition of process which need IQS Cutting : Crimping Chaimae El Bouhssini / Imane F 100% 4/2/2024 4/2/2024 Chaimae El BouhssiImane Fahmi New
Assembly : Crimping & Stripping
ECM 2.0 1 W13/24 Finished Creation of session / Installation of IQS Done Atlas, Abderrahmane 100% 4/2/2024 4/2/2024 Chaimae El BouhssiImane Fahmi New
Done but to be revised for the shared 13/06/2024 12/13/2023 /Structure to be reviwed . the due
AS RAS 1 W14-24 Overdue Create unique processes in 1st level comments Zainab Haida 80% 10/20/2023 Wk31 Zainab Haida Aicha Jlih New date is 22/12/2023
16-01-24 : PFMEA finished but need to correct
Status ASSIGNED some errors
Project Priority SOP Date TASK Details PROGRESS START Due date PE Quality Project status 08-02-24
Status comment
: IQS PFMEA - Review Planning is
( SOP ) TO
provided but
16-01-24- to add
Waiting thethe exactupdate
PFMEA projects affected
AS RAS 1 W14-24 Overdue Create Second level PFMEA Done but to be revised for the shared Zainab Haida 80% 10/2/2023 13/06/2024 Zainab Haida Aicha Jlih New 13-02-24 :: To
08.02.24 Management
be updatedmeeting done
after FMEA to be &
update
comments Wk31 alligned
release about the FMEA /CP between Engineering
& quality - Under validation of
13-02-24 : Management meeting done the planning
to beby
Done but to be revised for the shared 13/06/2024 definningabout
the priorities
AS RAS 1 W14-24 Overdue Create Control Plan comments Aicha Jlih 80% 10/2/2023 Wk31 Zainab Haida Aicha Jlih New alligned the FMEA /CP between Engineering
15-02-24
& quality :- Due
Underdates updated
validation of based on the by
the planning
provided
definningplanning
the priorities
AS RAS 1 W14-24 Finished Balloon drawings 45331.12.2014819 / 4532032574 ( W02-25 ) Hayat El Azzouzi 100% Done 1/15/2024 Zainab Haida Aicha Jlih New Done
15-02-24 : Due dates updated based on the
provided planning
AS RAS 1 W14-24 Finished Visual aids Asmae Faquihi 100% 10/20/2023 1/16/2024 Zainab Haida Aicha Jlih New 12/14/2023- Simulation 12/14/2023
15-01-24 : training method provided by sanae
13/06/2024 08.02.2024 : Pending till release the PFMEA/CP
AS RAS 1 W14-24 Overdue Create inspection points (validation repports) Pending release of PFMEA/CP Aicha Jlih 0% 10/4/2023 Wk31 Zainab Haida Aicha Jlih New 15-02-24 : Due dates updated based on the
provided planning feedback
20/12/2023:Pending
21/12/2023:Updated planing to be prepared by
AS RAS 1 W14-24 Finished Create inspection points (Shipping Audit) 4532032574 Asmae Faquihi 100% 10/2/2023 11/3/2023 Zainab Haida Aicha Jlih New sanae for the enw project.Updated status to be
01/07/2024 shared on CW01.
AS RAS 1 W14-24 Overdue Create incoming inpsection points for all 10000096-10001373-10004083-10004671 Sanae El otmani 47% 10/2/2023 30-07-24 Zainab Haida Aicha Jlih New 15/01/24 : Due date updated according to the
components Wk40 created planning
01-07-24: Due date postponed as we had a priority
AS RAS 1 W14-24 Finished Create SFGs inspection points 50025867 & 50025872 & Mouzoune Mohammed 100% 10/2/2023 10/20/2023 Zainab Haida Aicha Jlih New of other new projects to finish
50025878 & 5003551 31.07.24: Due date updated due to the holidays
For cutting done 100%:10004700 Ter FLR9Y period
AS RAS 1 W14-24 Finished Create SPC dummies SEC 0.35 Badr Ghississ 100% 10/2/2023 10/20/2023 Zainab Haida Aicha Jlih New
10009929 TER FLR9y sec 0,35
AS RAS 1 W14-24 Finished Definition of process which need IQS Cutting : Crimping Zainab Haida / Aicha Jlih 100% 4/2/2024 4/2/2024 Zainab Haida Aicha Jlih New
Assembly : Crimping
AS RAS 1 W14-24 Finished Creation of session / Installation of IQS IQS applied for Line 3 Atlas, Abderrahmane 100% 4/2/2024 4/15/2024 Zainab Haida Aicha Jlih New
Done but to be revised for the shared 18/07/2024 Hind Doukkali Meeting report:
Magna LV 1 W02-24 Overdue Create unique processes in 1st level comments Zainab Haida 80% 9/18/2023 WK29 Zainab Haida Jaouhary, Karim New Issues still not yet fixed ralted to hogh RPN(1000)
and duplicated charchteristics.
Done but to be revised for the shared 18/07/2024 Hind Doukkali 08-02-24 : IQS PFMEA - Review Planning is
Magna LV 1 W02-24 Overdue Create Second level PFMEA comments Zainab Haida 80% 9/18/2023 WK29 Zainab Haida Jaouhary, Karim New provided but to add the exact projects affected
13-02-24 : Management meeting done to be
Done but to be revised for the shared Hind doukkali 18/07/2024 Hind Doukkali 08-02-24 : CP tothe
alligned about beFMEA
updated
/CPbased on the
between update
Engineering
Magna LV 1 W02-24 Overdue Create Control Plan M0143121
comments Jaouhary, Karim 80% 9/18/2023 WK29 Zainab Haida Jaouhary, Karim New of FMEA - Under validation of the planning by
& quality
M0143145 13-02-24
definning :the
Management
priorities meeting done to be
M0146979 alligned about the FMEA /CP between Engineering
Magna LV 1 W02-24 Finished Balloon drawings M0156377 Hayat El Azzouzi 100% - 10/6/2023 Zainab Haida Hind Doukkali New Done
& quality - Under validation of the planning by
M0156378 definning the priorities
20/10/2023
Magna LV 1 W02-24 Finished Visual aids M0160338 Asmae Faquihi 100% 10/6/2023 17/11/2023 Zainab Haida Hind Doukkali New
16/01/2024
Magna LV 1 W02-24 Overdue Create inspection points (validation repports) Hind doukkali 80% 9/20/2023 18/07/2024 Zainab Haida Hind Doukkali New
M0143145 Jaouhary, Karim WK29 Jaouhary, Karim
20/12/2023:Pending feedback
M0156377 06/10/2023 21/12/2023:Updated planing to be prepared by
Magna LV 1 W02-24 Finished Create inspection points (Shipping Audit) M0156378 Asmae Faquihi 100% 9/18/2023 27/10/2023 Zainab Haida Hind Doukkali New sanae for the enw project.Updated status to be
M0160338 03/11/2023
01/07/2024 shared on CW01.
Create incoming inpsection points for all M0146979 30-07-24 Hind Doukkali 15/01/24 : Due date updated according to the
Magna LV 1 W02-24 Overdue components On going according to the planning
M0143121 Sanae El otmani 60% 9/18/2023 Wk 36 Zainab Haida Jaouhary, Karim New created planning
Wk41 01-07-24: Due date postponed as we had a priority
Magna LV 1 W02-24 Finished Create SFGs inspection points 50043399 &50043400 Mouzoune Mohammed 100% 9/18/2023 29/09/2023 Zainab Haida Hind Doukkali New of other new projects to finish
Action posponed till 04/10 10/04/2023 23-07-24 : Due date updated due to the August
Holiday
Magna LV 1 W02-24 Finished Create SPC dummies 10030700 ( Ter FHLR91X0 Sec 0.35 ) Badr Ghississ 100% 9/18/2023 9/29/2023 Zainab Haida Hind Doukkali New
Magna LV 1 W02-24 Finished Definition of process which need IQS Cutting & crimping only Zainab Haida / Hind Doukkali 100% 4/2/2024 4/2/2024 Zainab Haida Hind Doukkali New
13-02-24 : Management meeting done to be
Magna LV 1 W02-24 Finished Creation of session / Installation of IQS Implemented for cutting only Atlas, Abderrahmane 100% 4/2/2024 4/2/2024 Zainab Haida Hind Doukkali New alligned about the FMEA /CP between Engineering
& qualoty - Under validation of the planning by
31/05/2024 Hind Doukkali definning the priorities
Magna HV 1 W18-24 Overdue Create unique processes in 1st level Zainab Haida 80% 1/1/2024 Wk32 Zainab Haida Jaouhary, Karim New 15-02-24 :: Management
13-02-24 No due date for this project
meeting done on the
to be
planningabout
alligned providedthe FMEA /CP between Engineering
31/05/2024 Hind Doukkali 17.05.24
& quality :- AUnder
review of SOP &ofpriority
validation & PFMEA
the planning by due
Magna HV 1 W18-24 Overdue Create Second level PFMEA Zainab Haida 80% 1/1/2024 Wk32 Zainab Haida Jaouhary, Karim New dates done
13-02-24
definning ( Alignement
:the
Management with Engineering's
priorities meeting done to be
managerabout
alligned
15-02-24 ): No due
the date
FMEAfor/CP
thisbetween Engineering
project on the
Magna HV 1 W18-24 Overdue Create Control Plan Wating the PFMEA to be completed Hind doukkali 80% 1/1/2024 31/05/2024 Zainab Haida Hind Doukkali New & quality provided
planning - Under validation of the planning by
Jaouhary, Karim Wk32 Jaouhary, Karim definning the priorities
15-02-24 : No due date for this project on the
Magna HV 1 W18-24 Finished Balloon drawings ZM0145464 / ZM0145604 Hayat El Azzouzi 100% 1/1/2024 2/23/2024 Zainab Haida Hind Doukkali New planning
Done provided
Magna HV 1 W18-24 Finished Create SFGs inspection points Mouzoune Mohammed 100% 1/1/2024 25/02/2024 Zainab Haida Hind Doukkali New
14.03.24
Magna HV 1 W18-24 Finished Create SPC dummies Badr Ghississ 100% 1/1/2024 25/02/2024 Zainab Haida Hind Doukkali New 28.03.24 : Due date postponed upon request
19/04/24
Magna HV 1 W18-24 Finished Definition of process which need IQS Cutting Zainab Haida / Hind Doukkali 100% 4/2/2024 4/2/2024 Zainab Haida Hind Doukkali New
Assembly : Crimping& welding
Magna HV 1 W18-24 Finished Creation of session / Installation of IQS Done Atlas, Abderrahmane 100% 4/2/2024 4/2/2024 Zainab Haida Hind Doukkali New
Enviolo 0 Cancelled Cancelled Create unique processes in 1st level Chaimae El Bouhssini 100% - 9/6/2023 Chaimae El BouhssiHind Doukkali New
Page 2 of 9
Status ASSIGNED
Project Priority SOP Date TASK Details PROGRESS START Due date PE Quality Project status Status comment
( SOP ) TO
Enviolo 0 Cancelled Cancelled Create Second level PFMEA Chaimae El Bouhssini 100% - 9/6/2023 Chaimae El BouhssiHind Doukkali New
Enviolo 0 Cancelled Cancelled Create Control Plan Hind Doukkali 100% - 9/6/2023 Chaimae El BouhssiHind Doukkali New
B35H-0092-00
Enviolo 0 Cancelled Cancelled Balloon drawings B35H-0092-01 Hayat El Azzouzi 100% - 9/6/2023 Chaimae El BouhssiHind Doukkali New
Enviolo 0 Cancelled Cancelled Visual aids Cration of visual aids is on going Asmae Faquihi 50% 9/29/2023 03/11/2023 Chaimae El BouhssiHind Doukkali New
20/01/2024
Project cancelled
Enviolo 0 Cancelled Cancelled Create inspection points (validation repports) B35H-0092-00 Hind Doukkali 100% 9/6/2023 9/29/2023 Chaimae El BouhssiHind Doukkali New
B35H-0092-01
Enviolo 0 Cancelled Cancelled Create inspection points (Shipping Audit) B35H-0092-00 Hind doukkali 100% 9/6/2023 9/29/2023 Chaimae El BouhssiHind Doukkali New
B35H-0092-01
Enviolo 0 Cancelled Cancelled Create incoming inpsection points for all 10003266 -10018774-10025700-10029136 Sanae El outmani/Imane Fahmi 100% Cancelled Cancelled Chaimae El BouhssiHind Doukkali New
components
Enviolo 0 Cancelled Cancelled Create SFGs inspection points Mouzoune Mohammed 100% 9/6/2023 9/25/2023 Chaimae El BouhssiHind Doukkali New
Enviolo 0 Cancelled Cancelled Create SPC dummies NA for cutting Badr Ghississ 0% 9/25/2023 10/27/2023 Chaimae El BouhssiHind Doukkali New
Project not handled as priority as non 31/12/2024
3 Wk24 / 24 Overdue Create unique processes in 1st level automotive project ( excel file) /Proposal to Abdelhakim 0% 6/1/2024 Wk51 Abdelhakim Salwa Lamrabet New
Heat Pump be out of Master PFMEA (Not in 3 levels)
Project not handled as priority as non 31/12/2024
3 Wk24 / 24 Overdue Create Second level PFMEA automotive project ( excel file) /Proposal to Abdelhakim 0% 6/1/2024 Wk51 Abdelhakim Salwa Lamrabet New
Heat Pump be out of Master PFMEA (Not in 3 levels)
3 Wk24 / 24 Overdue Create Control Plan Project not handled as priority as non Salwa Lamrabet 0% 6/1/2024 31/12/2024 Abdelhakim Salwa Lamrabet New
Heat Pump automotive project ( excel file) Wk51
3 Wk24 / 24 Overdue Balloon drawings Laouiqel, Zahraa 0% 6/1/2024 12/31/2024 Abdelhakim Salwa Lamrabet New
Heat Pump
3 Wk24 / 24 Overdue Create inspection points (validation repports) Salwa Lamrabet 0% 6/1/2024 31/12/2024 Abdelhakim Salwa Lamrabet New
Heat Pump Wk51
Asmae Faquihi / Zohra 31/12/2024 31.07.24 :Due date postponed due to the number
3 Wk24 / 24 Overdue Visual aids Laouiqel, Zahraa 0% 6/1/2024 Wk30 Abdelhakim Salwa Lamrabet New of of references in this project
Heat Pump WK40
Asmae Faquihi / Zohra 31/12/2024 31.07.24 :Due date postponed due to the number
3 Wk24 / 24 Overdue Create inspection points (Shipping Audit) Laouiqel, Zahraa 0% 6/1/2024 Wk30 Abdelhakim Salwa Lamrabet New of of references in this project
Heat Pump WK40
3 Wk24 / 24 Overdue Create incoming inpsection points for all Sanae El otmani 0% 6/1/2024 12/1/2024 Abdelhakim Salwa Lamrabet New
Heat Pump components
3 Wk24 / 24 Overdue Create SFGs inspection points Mouzoune Mohammed 0% 5/13/2024 12/31/2024 Abdelhakim Salwa Lamrabet New
Heat Pump
3 Wk24 / 24 Overdue Create SPC dummies Badr Ghississ 0% 15/05/2024 12/31/2024 Abdelhakim Salwa Lamrabet New
Heat Pump Wk50
3 Wk24 / 24 Overdue Definition of process which need IQS abdelhakim 0% 5/13/2024 12/31/2024 Abdelhakim Salwa Lamrabet New
Heat Pump
3 Wk24 / 24 Overdue Creation of session / Installation of IQS Atlas, Abderrahmane 0% 5/17/2024 12/31/2024 Abdelhakim Salwa Lamrabet New
Heat Pump 15-02-24 : Due dates updated based on the
03/06/2024 provided planning
1 W10/24 Overdue Create unique processes in 1st level On going ( 2/14 ) Chaimae El Bouhssini 14% 05/07/2024 Chaimae El BouhssiSalwa Lamrabet New 17.05.24 : A review of SOP & priority & PFMEA due
Pierburg AGR Wk30 dates done ( Alignement with Engineering's
03/06/2024 manager )
05/07/2024 15-02-24 : Due dates updated based on the
1 W10/24 Overdue Create Second level PFMEA On going ( 2/14 ) Chaimae El Bouhssini 14% Chaimae El BouhssiSalwa Lamrabet New provided planning
Pierburg AGR Wk30
03/06/2024 15-02-24 : Due dates updated based on the
1 W10/24 Overdue Create Control Plan Pending release of PFMEA/CP Salwa Lamrabet 14% 08/07/2024 Chaimae El BouhssiSalwa Lamrabet New provided planning
Pierburg AGR Wk30
1 W10/24 Finished Balloon drawings Hayat El Azzouzi 100% 3/15/2024 3/20/2024 Chaimae El BouhssiSalwa Lamrabet New
Pierburg AGR
07/06/2024 15-02-24 : Due dates updated based on the
1 W10/24 Overdue Create inspection points (validation repports) Pending release of PFMEA/CP Salwa Lamrabet 0% 08/07/2024 Chaimae El BouhssiSalwa Lamrabet New provided planning
Pierburg AGR Wk30
22/03/2024
1 W10/24 Finished Create inspection points (Shipping Audit) Asmae Faquihi 100% 30-04-24 Chaimae El BouhssiSalwa Lamrabet New
Pierburg AGR
1 W10/24 Finished Create incoming inpsection points for all Sanae El otmani 100% 2/26/2024 3/8/2024 Chaimae El BouhssiSalwa Lamrabet New
Pierburg AGR components
1 W10/24 Finished Create SFGs inspection points Mouzoune Mohammed 100% 3/7/2024 Chaimae El BouhssiSalwa Lamrabet New
Pierburg AGR
1 W10/24 Finished Create SPC dummies Badr Ghississ 100% 3/6/2024 Chaimae El BouhssiSalwa Lamrabet New
Pierburg AGR
Cutting
1 W10/24 Finished Definition of process which need IQS Assembly : Crimping / welding / Compacting Chaimae El Bouhssini / Salwa L 100% 4/2/2024 4/2/2024 Chaimae El BouhssiSalwa Lamrabet New
Pierburg AGR 08-02-24 : IQS PFMEA - Review Planning is
provided but to add the exact projects affected
1 W10/24 Finished Creation of session / Installation of IQS Atlas, Abderrahmane 100% 4/2/2024 29/04/2024 Chaimae El BouhssiSalwa Lamrabet New 13-02-24 : Management meeting done to be
Pierburg AGR 10-07-2024 alligned about the FMEA /CP between Engineering
& quality :- IQS
08-02-24 Under validation
PFMEA of the
- Review planning
Planning is by
BorgWarner NTC Audi 1 W13-24 Finished Create unique processes in 1st level Zainab Haida 100% 4/25/2024 Zainab Haida Hind Doukkali New definning
provided butthe to
priorities
add the exact projects affected
PPE 15-02-24 :: Management
13-02-24 Due dates updated based
meeting doneonto
thebe
providedabout
alligned planning
BorgWarner NTC Audi 1 W13-24 Finished Create Second level PFMEA Zainab Haida 100% 4/25/2024 Zainab Haida Hind Doukkali New 08.02.24 :: A
17.05.24 tothe
beFMEA
CPreview created/CP between
of SOP &after releaseEngineering
of FMEA
PPE & quality :- Management
13-02-24 Under validation ofpriority
thedone
meeting
& PFMEA
planning
to beby
due
dates donethe
definning ( Alignement
priorities with Engineering's
alligned
managerabout
): Duethe FMEA /CP between Engineering
BorgWarner NTC Audi 1 W13-24 Finished Create Control Plan Hind Doukkali 100% 4/25/2024 Zainab Haida Hind Doukkali New 15-02-24 dates updated based on
& quality - Under validation of the planning bythe
PPE provided planning
definning the priorities
15-02-24 : Due dates updated based on the
BorgWarner NTC Audi 1 W13-24 Finished Balloon drawings Hayat El Azzouzi 100% Done Zainab Haida Hind Doukkali New Done
provided planning
PPE
Page 3 of 9
Status ASSIGNED
Project Priority SOP Date TASK Details PROGRESS START Due date PE Quality Project status Status comment
( SOP ) TO
BorgWarner NTC Audi 1 W13-24 Finished Visual aids Asmae Faquihi 100% 13/02/2024 Zainab Haida Hind Doukkali New 08.02.24 CP to be created
14.02.24 : Planning after release of FMEA
to be prepared
PPE 30/04/2024 13-02-24 : Management meeting done to be
23/02/2024 alligned about the FMEA /CP between Engineering
BorgWarner NTC Audi 1 W13-24 Finished Create inspection points (validation repports) Hind Doukkali 100% Zainab Haida Hind Doukkali New & quality - Under validation of the planning by
PPE 25-04-24 definning the priorities
15-02-24 : Due dates updated based on the
BorgWarner NTC Audi 1 W13-24 Finished Create inspection points (Shipping Audit) Asmae Faquihi 100% 4/20/2024 Zainab Haida Hind Doukkali New provided planning
PPE
BorgWarner NTC Audi 1 W13-24 Finished Create incoming inpsection points for all Sanae El otmani 100% Done Zainab Haida Hind Doukkali New
PPE components
BorgWarner NTC Audi 1 W13-24 Finished Create SPC dummies Badr Ghississ 100% 16/02/2024 Zainab Haida Hind Doukkali New 28.03.24 : Due date postponed upon request
PPE 19/04/24
BorgWarner NTC Audi 1 W13-24 Finished Definition of process which need IQS Assembly : Crimping Zainab Haida / Hind Doukkali 100% 4/2/2024 4/2/2024 Zainab Haida Hind Doukkali New
PPE
BorgWarner NTC Audi 1 W13-24 Finished Creation of session / Installation of IQS Atlas, Abderrahmane 100% 4/2/2024 15/04/2024 Zainab Haida Hind Doukkali New
PPE 07/04/24
05/07/2024 Imane Fahmi /
1 Oc t-24 In progress Create unique processes in 1st level Chaimae El Bouhssini 0% 5/10/2024 Wk46 Chaimae El BouhssiHind Doukkali New
Brose Jaouhary, Karim
05/07/2024 Imane Fahmi /
1 Oc t-24 In progress Create Second level PFMEA Chaimae El Bouhssini 0% 5/10/2024 Wk46 Chaimae El BouhssiHind Doukkali New
Brose Jaouhary, Karim
Imane Fahmi / Hind Doukkali 05/07/2024 Imane Fahmi /
1 Oc t-24 In progress Create Control Plan Jaouhary, Karim 0% 5/10/2024 Wk46 Chaimae El BouhssiHind Doukkali New
Brose 05/07/2024 Jaouhary, Karim
01-08-24 Imane Fahmi /
1 Oc t-24 In progress Balloon drawings Stamped Drawing not available yet Hayat El Azzouzi 0% 5/15/2024 Wk35 Chaimae El BouhssiHind Doukkali New 23-07-24 : Drawing not yet stamped
Brose Jaouhary, Karim
Wk42 Imane Fahmi /
1 Oc t-24 In progress Create inspection points (validation repports) Imane Fahmi / Hind Doukkali 0% 5/10/2024 05/07/2024 Chaimae El BouhssiHind Doukkali New
Brose Jaouhary, Karim Wk46 Jaouhary, Karim
30/06/2024 Imane Fahmi /
Asmae Faquihi / Zohra 01/08/2024
1 Oc t-24 In progress Create inspection points (Shipping Audit) Drawing not yet stamped Laouiqel, Zahraa 0% 6/15/2024 Wk28 Chaimae El BouhssiHind Doukkali New 23-07-24 : Drawing not yet stamped
Brose Jaouhary, Karim
Wk35
1 Oc t-24 Finished Create incoming inpsection points for all Sanae El otmani 100% 8/1/2024 25/08/2024 Chaimae El BouhssiImane Fahmi New
Brose components 10-06-2024
1 Oc t-24 Cancelled Create SFGs inspection points Not applied for this project Mouzoune Mohammed 0% Pending Chaimae El BouhssiImane Fahmi New
Brose
1 Oc t-24 Cancelled Create SPC dummies NO crimping is applicable for this project Badr Ghississ 0% 5/10/2024 Cancelled Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
Brose
Pull our force of ring / Pin
1 Oc t-24 Finished Definition of process which need IQS Pin measurements after cutting Chaimae El Bouhssini 100% 5/10/2024 7/5/2024 Chaimae El BouhssiImane Fahmi New
Brose Z height
15/07/2024 Imane Fahmi / 15-07-24- Due date postponed waiting the
1 Oc t-24 In progress Creation of session / Installation of IQS Purchase request made for new computers Atlas, Abderrahmane 0% 6/15/2024 30-08-24 Chaimae El BouhssiHind Doukkali New purchase of new computers
Brose Jaouhary, Karim
16/09/2024 Imane Fahmi / 17.05.24 : A review of SOP & priority & PFMEA due
1 W40 - 2024 In progress Create unique processes in 1st level M.Bakkali 80% 5/6/2024 Wk37 M.Bakkali Hind Doukkali New dates done ( Alignement with Engineering's
Schäffler BMW Jaouhary, Karim manager )
1 W40 - 2024 In progress Create Second level PFMEA M.Bakkali 80% 5/6/2024 16/09/2024 M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler BMW Wk37
1 W40 - 2024 In progress Create Control Plan Imane Fahmi / Hind Doukkali 80% 5/6/2024 16/09/2024 M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler BMW Jaouhary, Karim Wk37
1 W40 - 2024 Finished Balloon drawings F-633632.04-2000 Hayat El Azzouzi 100% 5/13/2024 6/15/2024 M.Bakkali Imane Fahmi
Schäffler BMW New
1 W40 - 2024 In progress Create inspection points (validation repports) Imane Fahmi / Hind Doukkali 0% 5/6/2024 16/09/2024 M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler BMW Jaouhary, Karim Wk37
15/06/2024
1 W40 - 2024 In progress Visual aids Asmae Faquihi / Zohra 0% 5/20/2024 01/08/2024 M.Bakkali Imane Fahmi / HindNew
Doukkali
Laouiqel, Zahraa Wk29
Schäffler BMW Wk30
15/06/2024
1 W40 - 2024 In progress Create inspection points (Shipping Audit) Asmae Faquihi / Zohra 0% 5/20/2024 01/08/2024 M.Bakkali Imane Fahmi / HindNew
Doukkali
Laouiqel, Zahraa Wk29
Schäffler BMW Wk30
1 W40 - 2024 Finished Create incoming inpsection points for all Sanae El otmani 100% 6/25/2024 08/07/2024 M.Bakkali Imane Fahmi New
Schäffler BMW components 10-06-2024
1 W40 - 2024 Finished Create SFGs inspection points Mouzoune Mohammed 100% 5/25/2024 31/05/2024 M.Bakkali Imane Fahmi New
Schäffler BMW 27-06-2024
1 W40 - 2024 In progress Create SPC dummies Badr Ghississ 0% 5/13/2024 15/06/2024 M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler BMW Wk29
1 W40 - 2024 Finished Definition of process which need IQS Cutting : Cutting & crimping M.Bakkali 100% 5/13/2024 6/15/2024 M.Bakkali Imane Fahmi New
Schäffler BMW
1 W40 - 2024 Finished Creation of session / Installation of IQS Not applicable for assembly Atlas, Abderrahmane 100% 5/13/2024 6/15/2024 M.Bakkali Imane Fahmi New
Schäffler BMW
1 March/2025 In progress Create unique processes in 1st level Not yet started M.Bakkali 0% 26/02/2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F Wk06 / 2025
1 March/2025 In progress Create Second level PFMEA Not yet started M.Bakkali 0% 26/02/2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F Wk06 / 2025
1 March/2025 In progress Create Control Plan Not yet started Aicha Jlih 0% 26/02/2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F Wk06 / 2025
1 March/2025 In progress Balloon drawings Drawing not yet available Hayat El Azzouzi 0% Wk03 / 2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F
1 March/2025 In progress Create inspection points (validation repports) Not yet started Aicha Jlih 0% 26/02/2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F Wk06 / 2025
Asmae Faquihi / Zohra
1 March/2025 In progress Create inspection points (Shipping Audit) Laouiqel, Zahraa 0% Wk03 / 2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F
Page 4 of 9
Status ASSIGNED
Project Priority SOP Date TASK Details PROGRESS START Due date PE Quality Project status Status comment
( SOP ) TO
1 March/2025 In progress Create incoming inpsection points for all Not yet started Sanae El otmani 0% 1/15/2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F components
1 March/2025 In progress Create SFGs inspection points Not yet started Mouzoune Mohammed 0% Wk03 / 2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F
1 March/2025 In progress Create SPC dummies Not yet started Badr Ghississ 0% Wk03 / 2025 M.Bakkali Aicha Jlih New
NSK VWMEB21F
1 March/2025 In progress Definition of process which need IQS Not yet started M.Bakkali 0% Wk 50 M.Bakkali Aicha Jlih New
NSK VWMEB21F
1 March/2025 In progress Creation of session / Installation of IQS Atlas, Abderrahmane 0% Wk 51 M.Bakkali Aicha Jlih New
NSK VWMEB21F
10/07/2024 17.05.24 : A review of SOP & priority & PFMEA due
1 W35-24 Finished Create unique processes in 1st level Zainab Haida 100% 6/3/2024 Wk33 Zainab Haida Aicha Jlih New dates done ( Alignement with Engineering's
Emmerson manager )
1 W35-24 Finished Create Second level PFMEA Zainab Haida 100% 6/3/2024 12/07/2024 Zainab Haida Aicha Jlih New
Emmerson Wk33
1 W35-24 Finished Create Control Plan Aicha Jlih 100% 6/3/2024 12/07/2024 Zainab Haida Aicha Jlih New
Emmerson Wk33
1 W35-24 Finished Balloon drawings Hayat El Azzouzi 100% 6/3/2024 12/07/2024 Zainab Haida Aicha Jlih New
Emmerson Wk33
1 W35-24 In progress Create inspection points (validation repports) Aicha Jlih 0% 6/3/2024 12/07/2024 Zainab Haida Aicha Jlih New
Emmerson Wk33
1 W35-24 In progress Create inspection points (Shipping Audit) Asmae Faquihi / Zohra 0% 6/3/2024 12/07/2024 Zainab Haida Aicha Jlih New
Emmerson Laouiqel, Zahraa Wk33
Create incoming inpsection points for all 12/07/2024 23-07-24 : Due date updated due to the August
1 W35-24 In progress components Sanae El otmani 73% 6/3/2024 Wk33 Zainab Haida Aicha Jlih New Holiday
Emmerson W39
12/07/2024
1 W35-24 In progress Create SFGs inspection points Mouzoune Mohammed 0% 6/3/2024 Wk33 Zainab Haida Aicha Jlih New
Emmerson
1 W35-24 In progress Create SPC dummies Badr Ghississ 0% 6/3/2024 12/07/2024 Zainab Haida Aicha Jlih New
Emmerson Wk33
1 W35-24 Finished Definition of process which need IQS Cutting & crimping Zainab Haida 100% 6/3/2024 6/15/2024 Zainab Haida Aicha Jlih New
Emmerson Assemby : Crimping
12/07/2024
1 W35-24 In progress Creation of session / Installation of IQS Atlas, Abderrahmane 0% 6/15/2024 Wk33 Zainab Haida Aicha Jlih New
Emmerson
1 Dec-24 In progress Create unique processes in 1st level Zainab Haida 0% 6/17/2024 Wk 50 Zainab Haida Aicha Jlih New
Elup
1 Dec-24 In progress Create Second level PFMEA Zainab Haida 0% 6/17/2024 Wk 50 Zainab Haida Aicha Jlih New
Elup
1 Dec-24 In progress Create Control Plan Aicha Jlih 0% 6/17/2024 Wk 50 Zainab Haida Aicha Jlih New
Elup
1 Dec-24 Finished Balloon drawings Hayat El Azzouzi 100% 6/17/2024 Wk33 Zainab Haida Aicha Jlih New
Elup
1 Dec-24 In progress Create inspection points (validation repports) Aicha Jlih 0% 6/17/2024 Wk 50 Zainab Haida Aicha Jlih New
Elup
Asmae Faquihi / Zohra
1 Dec-24 In progress Create inspection points (Shipping Audit) Laouiqel, Zahraa 0% 6/17/2024 Wk 50 Zainab Haida Aicha Jlih New
Elup
Create incoming inpsection points for all Wk32 23-07-24 : Due date updated due to the August
1 Dec-24 In progress components Sanae El otmani 0% 6/17/2024 Wk40 Zainab Haida Aicha Jlih New Holiday
Elup Wk42
1 Dec-24 In progress Create SFGs inspection points Mouzoune Mohammed 0% 6/17/2024 Wk 45 Zainab Haida Aicha Jlih New
Elup
1 Dec-24 In progress Create SPC dummies Badr Ghississ 0% 6/17/2024 Wk 45 Zainab Haida Aicha Jlih New
Elup
1 Dec-24 Finished Definition of process which need IQS Cutting Zainab Haida 100% 6/17/2024 6/28/2024 Zainab Haida Aicha Jlih New
Elup Assembly : Crimping
1 Dec-24 In progress Creation of session / Installation of IQS Atlas, Abderrahmane 0% 6/17/2024 Wk 50 Zainab Haida Aicha Jlih New
Elup
1 W09/2025 Not started Create unique processes in 1st level M.Bakkali 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG
1 W09/2025 Not started Create Second level PFMEA M.Bakkali 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG
1 W09/2025 Not started Create Control Plan Imane Fahmi / Hind Doukkali 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG Jaouhary, Karim
1 W09/2025 Not started Balloon drawings Drawing not yet available Hayat El Azzouzi 0% Not yet started M.Bakkali Imane Fahmi / Hind Doukkali
Schäffler AMG New
1 W09/2025 Not started Create inspection points (validation repports) Imane Fahmi / Hind Doukkali 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG Jaouhary, Karim
1 W09/2025 Not started Visual aids Asmae Faquihi / Zohra 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG Laouiqel, Zahraa
Asmae Faquihi / Zohra Imane Fahmi / HindNew
Doukkali
1 W09/2025 Not started Create inspection points (Shipping Audit) Laouiqel, Zahraa 0% Not yet started M.Bakkali
Schäffler AMG
1 W09/2025 Not started Create incoming inpsection points for all Sanae El otmani 0% 12/15/2024 M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG components
1 W09/2025 Not started Create SFGs inspection points Mouzoune Mohammed 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG
1 W09/2025 Not started Create SPC dummies Badr Ghississ 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG
Page 5 of 9
Status ASSIGNED
Project Priority SOP Date TASK Details PROGRESS START Due date PE Quality Project status Status comment
( SOP ) TO
1 W09/2025 Not started Definition of process which need IQS M.Bakkali / Imane Fahmi Jaouhary,
0% Karim Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG
1 W09/2025 Not started Creation of session / Installation of IQS Atlas, Abderrahmane 0% Not yet started M.Bakkali Imane Fahmi / HindNew
Doukkali
Schäffler AMG
ECM 1904 1 November-24 In progress Create unique processes in 1st level Chaimae El Bouhssini 0% Wk43 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
ECM 1904 1 November-24 In progress Create Second level PFMEA Chaimae El Bouhssini 0% Wk43 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
ECM 1904 1 November-24 In progress Create Control Plan Imane Fahmi / Hind Doukkali 0% Wk43 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
Jaouhary, Karim
ECM 1904 1 November-24 In progress Balloon drawings Drawing not yet available Hayat El Azzouzi 0% 11/5/2024 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
ECM 1904 1 November-24 In progress Create inspection points (validation repports) Imane Fahmi / Hind Doukkali 0% Wk45 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
Jaouhary, Karim
ECM 1904 1 November-24 In progress Create inspection points (Shipping Audit) Asmae Faquihi / Zohra 0% Wk45 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
Laouiqel, Zahraa
ECM 1904 1 November-24 In progress Create incoming inpsection points for all Sanae El otmani 0% 11/1/2024 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
components
ECM 1904 1 November-24 In progress Create SFGs inspection points Mouzoune Mohammed 0% Wk45 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
ECM 1904 1 November-24 In progress Create SPC dummies Badr Ghississ 0% Wk45 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
ECM 1904 1 November-24 In progress Definition of process which need IQS Chaimae El Bouhssini / Imane F 0% Wk40 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
ECM 1904 1 November-24 In progress Creation of session / Installation of IQS Atlas, Abderrahmane 0% Wk43 Chaimae El BouhssiImane Fahmi / HindNew
Doukkali
Imane Fahmi /
ECM 2307 1 Dec-24 In progress Create unique processes in 1st level Chaimae El Bouhssini 0% Wk47 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi /
ECM 2307 1 Dec-24 In progress Create Second level PFMEA Chaimae El Bouhssini 0% Wk47 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi / Hind Doukkali Imane Fahmi /
ECM 2307 1 Dec-24 In progress Create Control Plan Jaouhary, Karim 0% Wk47 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi /
ECM 2307 1 Dec-24 In progress Balloon drawings Drawing not yet available Hayat El Azzouzi 0% 11/5/2024 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Asmae Faquihi / Zohra Imane Fahmi /
ECM 2307 1 Dec-24 In progress Visual aids Laouiqel, Zahraa 0% Wk48 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi / Hind Doukkali Imane Fahmi /
ECM 2307 1 Dec-24 In progress Create inspection points (validation repports) Jaouhary, Karim 0% Wk48 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Asmae Faquihi / Zohra Imane Fahmi /
ECM 2307 1 Dec-24 In progress Create inspection points (Shipping Audit) Laouiqel, Zahraa 0% Wk48 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Create incoming inpsection points for all Imane Fahmi /
ECM 2307 1 Dec-24 In progress components Sanae El otmani 0% 11/1/2024 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi /
ECM 2307 1 Dec-24 In progress Create SFGs inspection points Mouzoune Mohammed 0% Wk48 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi /
ECM 2307 1 Dec-24 In progress Create SPC dummies Badr Ghississ 0% Wk48 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi /
ECM 2307 1 Dec-24 In progress Definition of process which need IQS Chaimae El Bouhssini / Imane F 0% Wk45 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Imane Fahmi /
ECM 2307 1 Dec-24 In progress Creation of session / Installation of IQS Atlas, Abderrahmane 0% Wk48 Chaimae El BouhssiHind Doukkali New
Jaouhary, Karim
Page 6 of 9
Project Priority Status TASK Details ASSIGNED PROGRESS START END PE Quality Project status Status comment
( SOP ) TO
15-20-24 : no due date indicated for this project
Serial - low on the provided planning
3 Overdue Create Control Plan Wating the PFMEA creation Salwa Lamrabet 0% 28/01/2024 2/15/2025 Zainab Haida Salwa Lamrabet runner 16.04.24: Due date postponed by engineering for
LSFX 4
FMEA creation
15-20-24 : no due date indicated for this project
Serial - low
3 Overdue Create inspection points (validation repports) Wating the PFMEA creation Salwa Lamrabet 0% 28/01/2024 2/15/2025 Zainab Haida Salwa Lamrabet on the provided planning
LSFX 4 runner
16.04.24: Due date postponed by engineering
30/06/2024
Audi ( A6 & A7 & A8) 2 Overdue Create inspection points (validation repports) Salwa Lamrabet 50% - Wk31 Zainab Haida Salwa Lamrabet Serial
Page 7 of 9
Deutsch
English
OPL
In progress 6
Overdue 0
Finished 23
Cancelled 2
24-01-24 :Meeting arranged with Meriem & Anton
Not started 0 where requested to recheck the possibility of
implementation again or provide a presentation in
Start Date / case of cancel requestRemark ( A new meeting is arrandged
No. Task / Topic Action Responsible Deadline Status Close date
Begin Planning
in WK 05 cretaed
) / Due date 20-06-24 to finish the
16/01/2024 upload : Meriem presented verbally the
31-01-24
5 1/12/2024 Fixing Supplier PPAPs Create planning for uploading components PPAP in IQS sanae 20-06-24 In progress 12.06.24: Due
constraints anddate
the postponed
needed points duetotoimplement
the priority
10-12-24 provided
MM of new
for audits projects ( Integration of new
points.
components
17-01-24
To onaudits
present:Meeting
the IQSarranged
) segmentation
with Asmae & Anton
for next
Manage Audit Action plans Follow up with IQS for all customer & and another meeting
7 1/12/2024 process and system audits : action plans to be reflected in IQS in Weekly follow up meeting Meryem Follow up meeting In progress meeting to follow the istopic
scheduled
step byinstep
WK 4 to check
the arrangement
14.02.24 :'- Generalin IQS
overview of Audit module /
MM modules 24-01-24 : Meeting arranged
- Anton was proposing FVMA with Asmaeof &
as a pilote Anton
Audit
and
Moduleanother meeting
/ Audit module is scheduled
manual toinbeWK 5 ( Asmae
shared with
to prepare
Meryem forthe requested
check data for
& definition simulation
of OPL )
( due date
Develop a way to Integrate dummy parts follow up into IQS 31-01-24
Middle_April : Meeting postponed
/ Training on Auditto Module
next week for non
10 1/12/2024 PMV : instead of excel follow up by the LQCs Follow up meeting Asmae Follow up meeting In progress
availability
( Middle_May of Asmae
) ( involved in internal
meetings
13.03.24 :)Training scheduled for Audit module
14-02-24
( Meryem: invited
Asmae forshared the dummy's
training all details
) . Next steps to be per
project
defined after the training
12.03.24 : All data aprovided
FVMA propose by FVMAwith
weekly meeting , Anton
Antonto to
check the option to the
define be used
right for the integration of
instruction
Sanae / Driss / Badr / dummies into IQS
08/05/24 : 1St meeting done with the team
11 1/12/2024 Definition of instruction of how to do Asmae / Mouzoun Follow up meeting In progress ( Presentation needed to be prepared by the team
for more explanation of the process )
Another meeting is planned
Correction of ADM PFMEA & CP ( ex. causes are not part of 5M To correct the ADM PFMEA & CP
functions / 5M is not entered )
22 5/9/2024 Aicha / Chaimae 7/31/2024 In progress That will be updated with the new added processes
24 6/6/2024 Recovery plan to be updated To share criterias and actions of recovery plan for FMEA/CP/IP Mahmoud 7/31/2024 In progress
KK01_00012-07
Module Description Owner / End user Names of end users Release / Or back up Departement
Drawings Ballooning, and BP Quality manufacturing Elazzouzy, Hayat Lamrabet, Salwa Quality
ElBouhssini, Chaimae
PFMEA Project engineer Ajnah, Mahmoud Engneering
Haida, Zainab ;
Jlih, Aicha
Fahmi, Imane
Control Plan Quality assurance Lamrabet, Salwa Quality
Doukkali, Hind
Lamrabet, Salwa
Cutting SPC (Terminal) Crimping laboratory Ghssiss, Badr TBD Technical / Process
Jlih, Aicha
Fahmi, Imane
First and last part validation repports Assembly Quality assurrance Lamrabet, Salwa Quality
Doukkali, Hind
Lamrabet, Salwa
Inspections data Operators / Quality line controllers Operators / Quality line controllers - Production / Quality
Jlih, Aicha
Fahmi, Imane
PPAPs Quality assurrance Lamrabet, Salwa Quality
Doukkali, Hind
Lamrabet, Salwa
Elharrak, Zohra
Inspections Monitoring Quality manufacturing About, Mourad Faquihi, Asmae Quality
Badr
Inspections Monitoring ( RM ) Incoming inspection abdeladim.elbacha ( Back up to be defined ) Elotmani, Sanae Quality
Jlih, Aicha
Fahmi, Imane
Complaints Management ( Customers ) Quality assurrance Lamrabet, Salwa Quality
Doukkali, Hind
Lamrabet, Salwa
Complaints Management ( Suppliers ) Quality assurrance abdeladim.elbacha ( Back up to be defined ) Elotmani, Sanae Quality