0% found this document useful (0 votes)
38 views9 pages

Ilovepdf Merged Merged Organized

hui

Uploaded by

OpaDzu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views9 pages

Ilovepdf Merged Merged Organized

hui

Uploaded by

OpaDzu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

UH-Numbers P1 P2 P3 Sum

0 0 0 0 0
1 83.33 16.666 0 0 16.666 P= [0.2, 0.6, 1.4 ]
2 166.67 33.334 49.998 0 83.332 Tb = 14hr
3 250 50 100.002 116.662 266.664 Tp = 3 hr
4 227.27 45.454 150 233.338 428.792 Peak = 250 cfs
5 204.54 40.908 136.362 350 527.27
6 181.81 36.362 122.724 318.178 477.264
7 159.08 31.816 109.086 286.356 427.258
8 136.35 27.27 95.448 254.534 377.252
9 113.62 22.724 81.81 222.712 327.246
10 90.89 18.178 68.172 190.89 277.24
11 68.16 13.632 54.534 159.068 227.234
12 45.43 9.086 40.896 127.246 177.228
13 22.7 4.54 27.258 95.424 127.222
14 0 0 13.62 63.602 77.222
15 0 31.78 31.78
16 0 0
UH-Numbers P1 P2 P3 Sum
0 0 0 0 0 P= [0.4, 2.0, 2.8 ]
1 83.33 33.332 0 0 33.332 Tb = 14hr
2 166.67 66.668 166.66 0 233.328 Tp = 3 hr
3 250 100 333.34 233.324 666.664 Peak = 250 cfs
4 227.27 90.908 500 466.676 1057.584
5 204.54 81.816 454.54 700 1236.356
6 181.81 72.724 409.08 636.356 1118.16
7 159.08 63.632 363.62 572.712 999.964
8 136.35 54.54 318.16 509.068 881.768
9 113.62 45.448 272.7 445.424 763.572
10 90.89 36.356 227.24 381.78 645.376
11 68.16 27.264 181.78 318.136 527.18
12 45.43 18.172 136.32 254.492 408.984
13 22.7 9.08 90.86 190.848 290.788
14 0 0 45.4 127.204 172.604
15 0 63.56 63.56
16 0 0
Date/Time distance across the stream (ft) Incremental precipitation (in) Flow (cfs)
Date 01 16:00 0 0
Date 01 17:00 0.05 0.5
Date 01 18:00 0.04 0.5
Date 01 19:00 0 0.6
Date 01 20:00 0.08 14
Date 01 21:00 0.05 32
Date 01 22:00 0.42 54
Date 01 23:00 0.1 78
Date 01 00:00 0.3 105
Date 01 01:00 0.14 158
Date 01 02:00 0.19 201
Date 01 03:00 0.45 228
Date 01 04:00 0.01 258
Date 01 05:00 0 272
Date 01 06:00 225
Date 01 07:00 189
Date 01 08:00 142
Date 01 09:00 119
Date 01 10:00 98
Date 01 11:00 66
Date 01 12:00 42
Date 01 13:00 27
Date 01 14:00 0
1.83 2309.6

Area = 3.25mi^2 = 90604800ft^2


total runoff in ft^3 = 2309.6*3600 = 8314560ft^3
total runoff in ft = 8314560/90604800 = 0.092ft
total runoff in in = 0.092ft * 12in/ft = 1.1in
infiltration = precipitation - runoff = 1.83 - 1.1 = 0.73 in
visually inspecting the table, the maximum value was at 5:00 with 272 cfs. tp = 13hr
1st-hr UH Lagged 1hr Lagged 2hr Sum Total 3-hr UH
0 0 0 0 0 0
1 75 0 0 75 25
2 180 75 0 255 85
3 275 180 75 530 176.6666667
4 280 275 180 735 245
5 210 280 275 765 255
6 130 210 280 620 206.6666667
7 60 130 210 400 133.3333333
8 30 60 130 220 73.33333333
9 15 30 60 105 35
10 5 15 30 50 16.66666667
11 0 5 15 20 6.666666667
12 0 5 5 1.666666667
13 0 0 0
Time (hr) I (in/hr) F (in/hr) P
1 0.4 0.3 0.1
2 1.2 0.2 1
3 3.3 0.1 3.2
4 0.8 0.1 0.7

P = [0.1, 1.0, 3.2, 0.7]

Time UH-1 (meadows) UH-2 (wooded) P1 = 0.1 for 1 P1 = 1.0 for 2 P2 = 1.0 for 1 P2 = 1.0 for 2 P3 = 3.2 for 1 P3 = 3.2 for 2 P4 = 0.7 for 1 P4 = 0.7 for 2 Sum for 1 Sum for 2
0 0 0 0 0 0 0 0 0 0 0 0 0
1 200 150 20 15 0 0 0 0 0 0 20 15
2 450 300 45 30 200 150 0 0 0 0 245 180
3 650 500 65 50 450 300 640 480 0 0 1155 830
4 450 350 45 35 650 500 1440 960 140 105 2275 1600
5 300 250 30 25 450 350 2080 1600 315 210 2875 2185
6 150 125 15 12.5 300 250 1440 1120 455 350 2210 1732.5
7 0 100 0 10 150 125 960 800 315 245 1425 1180
8 50 0 5 0 100 480 400 210 175 690 680
9 0 0 0 0 50 0 320 105 87.5 105 457.5
10 0 0 0 160 0 70 0 230
11 0 0 0 35 0 35
12 0 0 0 0

Hydrograph for meadows area Hydrograph for wooded area


fo = 1.6in/hr fc = 0.7in/hr k = 0.24 /hr
ft = fc + (fo - fc) * e^(-kt)

Time Time in SI units (hr) Infiltration Capacity - ft Graphs Variables: Time


10 min 0.167 1.564641321 1.6 0
15 min 0.25 1.54758808 1.564641321 0.167
30 min 0.5 1.498228393 1.54758808 0.25
1-hr 1 1.407965075 1.498228393 0.5
2-hr 2 1.256905053 1.407965075 1
4-hr 4 1.044603597 1.256905053 2
6-hr 6 0.9132349828 1.044603597 4
0.9132349828 6
0.7 15
(15&30 to show the gparh clearly and show tha the final capacity approaching 0.7) 0.68 30
CamScanner
Time Rainfall fo = 0.9 in/hr fc = 0.2in/hr k = 1.1 /hr
0 0 Using Horton's equation: ft = fc + (fo - fc) * e^(-kt)
1 1.2
2 2.1 Time Infiltration Total infiltration = fc*t + (fo - fc)/k * (1 - e^(-kt))
3 0.9 0 0.9 Total infiltration = 0.2 * 5 + (0.9 - 0.2)/1.1 * (1 - e^(-1.1 * 5)) = 1.634in
4 0.4 1 0.4330097586
5 0.4 2 0.2775622109
3 0.2258182172
4 0.2085941379
5 0.20286074
20 0.2
Sandy load: ŋ = 0.453 θe = 0.412 ψ = 11.01 k = 1.09 Se = 0.3
Δθ = (1 - Se) * θe = (1 - 0.3)*0.412 = 0.2884
ψ*Δθ = 11.01 * 0.2884 = 3.175
Inital guess F = 0.1

Time F f
0.1 0.302953422 12.51337319
0.2 0.5073580425 7.911119821
0.3 0.7976800563 5.428518899
0.4 1.147623265 4.105580205
0.5 1.524661563 3.359848001
0.6 1.899180599 2.912233231
0.7 2.251622312 2.627002889
0.8 2.57382942 2.434591826
0.9 2.865961377 2.297535464
1 3.132336324 2.194846237
1.1 3.378338477 2.114394099
1.2 3.608817657 2.048970591
1.3 3.82756283 1.994165432
1.4 4.037325204 1.947188813
1.5 4.240035951 1.906207702
1.6 4.437041958 1.869967833
1.7 4.629295658 1.837575929
1.8 4.817489193 1.808372136
1.9 5.002142911 1.781853484
2 5.183661696 1.757626516
2.1 5.362370465 1.735376895
2.2 5.538536708 1.714849158
2.3 5.712385155 1.695832749
2.4 5.884107639 1.678152055
2.5 6.053869988 1.661659122
2.6 6.221817013 1.646228187
2.7 6.388076244 1.631751518
2.8 6.552760797 1.618136171
2.9 6.715971628 1.605301462
3 6.877799338 1.593176936