How To Prevent Future Dated Expense Reports Submission in R12.1.3 - Oracle-Mosc
How To Prevent Future Dated Expense Reports Submission in R12.1.3 - Oracle-Mosc
3 — oracle-mosc
HOME › ORACLE E-BUSINESS SUITE (MOSC) › FINANCIAL MANAGEMENT - EBS (MOSC) › PAYABLES AND CASH MANAGEMENT - EBS (MOSC)
Discussions
Activity Aug 8, 2012 2:43AM edited Aug 10, 2012 5:36AM 5 comments Answered
Best Of...
Hi Folks,
Unanswered 100+
I have done following setups,
Groups
Help
Categories
All Categories
Warning tolerance: 0
General / Getting Started
Error Tolerance: 1
Getting Started in MOSC 3.5K
Assign these tolerance to OU
Rewards and Recognition
73
(MOSC) Create Policy schedule and assign at template level.
My Oracle Support (MOS)
4
Registration FAQs
Reputation Levels Setup the profile option: OIE:Enable Policy: Prevent Submission ,
Oracle
Enterprise Communities
Manager (MOSC) 7.4K Flag Quote Off Topic Like
JDEdwards EnterpriseOne
50.2K Users 4.2 Discussion 553.9 Comment 1.7
(MOSC) Discussions
Home Categories ⏷ Groups Events Resources Recognition ⏷ Help
: M s: K s: M
JDEdwards World (MOSC) 2.7K Answers
Linux OS (MOSC) 2K
Sharon Sherley Posts: 514 Bronze Badge
Middleware (MOSC) 24.9K
Aug 8, 2012 6:19AM
My Oracle Support Portal and
5.4K
Support Tools (MOSC)
Oracle Construction and There is a setting that controls this in the Internet Expenses Setup and Admin resp.
6.5K
Engineering (MOSC) >General Tab>Options>Future Dated Expenses
Oracle Database (MOSC) 56.8K
Make the settings and log out for a few minutes then re-test.
Oracle E-Business Suite
194.7K
(MOSC) Hope this helps.
Ex:- My current system date: 09-Aug-2012, i am able to enter until 11-Aug-2012, System
Siebel (MOSC) 12.6K
is showing future date error message for 12 Aug is future date , i.e next week for the
Ideas Lab system .
JD Edwards EnterpriseOne
5
Orchestrator Ideas Lab I used our Vision instance and made the settings. Saved and re-tested and it works fine.
Kondala,
Think you have encountered Bug 12827741 as documented in this reference shown
below. Check to see if the patch is missing from your instance and hopefully this will
help. The system is programmed to add one day to the future dated entry calculation to
account for time zone differences. Let us know what happens.
Leave a Comment
Type…
New to My Oracle Support Community? Visit our Welcome Center MOSC Help Center
© 2024 Oracle | Site Map Privacy / Do Not Sell My Info Community Integrity Policy Cookie Preferences
Ad Choices Careers