Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: E P Z Date: 20.07.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 27 25 15 6 24 13 8 35 21 22 196 0 43 0 43
09-00 to 10-00 19 27 24 16 29 16 39 9 16 16 211 0 91 0 91
10-00 to 11-00 31 23 9 7 33 9 31 11 19 19 192 0 77 0 77
11-00 to 12-00 46 24 30 6 67 13 21 33 32 50 322 0 89 0 89
12-00 to 13-00 35 21 35 11 86 5 19 56 13 61 342 0 64 0 64
13-00 to 14-00 39 22 20 4 58 3 34 53 29 43 305 0 52 0 52
14-00 to 15-00 58 8 52 10 35 0 38 38 10 17 266 4 87 1 92
15-00 to 16-00 49 15 35 9 30 3 15 56 8 26 246 2 34 0 36
16-00 to 17-00 29 17 23 10 30 4 11 51 20 28 223 0 22 0 22
17-00 to 18-00 27 28 21 8 22 9 21 59 25 34 254 1 46 0 47
18-00 to 19-00 31 15 22 7 23 12 31 47 28 28 244 0 49 0 49
19-00 to 20-00 16 4 10 4 7 6 18 20 10 14 109 0 27 0 27
20-00 to 21-00 35 8 19 4 11 3 14 49 8 23 174 0 21 0 21
21-00 to 22-00 48 0 22 4 5 2 20 73 8 23 205 0 18 0 18
22-00 to 23-00 13 2 24 1 3 4 7 48 6 28 136 0 8 0 8
23-00 to 24-00 39 2 9 4 6 3 6 83 5 14 171 0 5 0 5
00-00 to 01-00 12 1 13 1 4 6 7 85 5 39 173 0 8 0 8
01-00 to 02-00 40 1 15 1 2 6 1 92 6 36 200 0 2 0 2
02-00 to 03-00 57 1 15 1 1 7 10 68 5 26 191 0 11 0 11
03-00 to 04-00 45 1 1 1 2 3 3 80 5 35 176 0 1 0 1
04-00 to 05-00 61 1 25 4 6 7 6 87 11 30 238 0 7 0 7
05-00 to 06-00 48 3 46 4 8 8 8 62 11 8 206 0 10 0 10
06-00 to 07-00 45 0 56 7 13 15 11 65 6 12 230 0 21 0 21
07-00 to 08-00 40 32 25 17 40 13 22 75 11 19 294 5 37 0 42
Total 890 281 566 147 545 170 401 1335 318 651 5304 12 830 1 843
Appendix B - Page 1
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-2 From: Abdullahpur To: Nabinagar Date: 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 24 14 25 46 6 15 9 9 4 22 174 0 41 0 41
09-00 to 10-00 15 20 37 8 17 17 6 5 3 8 136 0 43 0 43
10-00 to 11-00 5 9 29 7 11 6 14 0 5 12 98 0 32 0 32
11-00 to 12-00 7 15 21 13 20 6 19 2 9 13 125 0 45 0 45
12-00 to 13-00 6 11 31 9 23 21 20 2 10 5 138 0 37 0 37
13-00 to 14-00 11 6 29 12 11 10 29 14 4 5 131 0 57 0 57
14-00 to 15-00 5 9 30 7 6 9 17 7 7 9 106 0 24 0 24
15-00 to 16-00 1 9 25 9 19 20 17 6 11 15 132 0 24 0 24
16-00 to 17-00 3 0 38 10 13 14 25 3 16 11 133 0 35 0 35
17-00 to 18-00 0 14 37 17 10 10 12 2 11 4 117 0 23 0 23
18-00 to 19-00 3 12 29 13 8 17 18 0 9 15 124 1 18 0 19
19-00 to 20-00 2 15 19 11 12 19 15 0 7 7 107 4 14 0 18
20-00 to 21-00 8 13 24 16 9 25 13 7 10 11 136 8 23 0 31
21-00 to 22-00 38 22 40 16 15 15 10 9 17 11 193 1 18 0 19
22-00 to 23-00 11 21 22 10 5 27 12 13 15 7 143 0 26 0 26
23-00 to 24-00 11 17 7 3 1 12 10 15 14 10 100 0 20 0 20
00-00 to 01-00 16 8 10 1 2 14 8 21 11 9 100 0 28 0 28
01-00 to 02-00 12 6 6 1 3 13 1 21 38 23 124 0 19 0 19
02-00 to 03-00 10 6 4 2 3 5 0 21 41 26 118 0 8 0 8
03-00 to 04-00 11 5 6 2 5 4 1 21 27 22 104 0 4 0 4
04-00 to 05-00 13 7 16 11 10 7 0 13 26 19 122 0 25 0 25
05-00 to 06-00 10 12 24 5 0 14 4 10 22 18 119 0 26 0 26
06-00 to 07-00 13 12 31 13 5 14 4 5 8 13 118 0 25 0 25
07-00 to 08-00 11 2 26 1 7 26 14 3 2 4 96 0 23 0 23
Total 246 265 566 243 221 340 278 209 327 299 2994 14 638 0 652
Appendix B - Page 2
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-3 From: E P Z To: Nabinagar Date 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 64 55 10 40 41 0 9 8 24 15 266 16 36 0 52
09-00 to 10-00 20 45 18 37 57 2 11 7 39 27 263 5 39 0 44
10-00 to 11-00 19 32 22 32 62 1 13 13 48 20 262 0 34 0 34
11-00 to 12-00 15 66 16 51 53 1 23 2 104 28 359 2 45 0 47
12-00 to 13-00 8 59 26 46 60 0 25 1 65 24 314 2 41 0 43
13-00 to 14-00 8 32 21 47 57 1 16 0 69 29 280 0 50 0 50
14-00 to 15-00 30 61 20 69 64 3 39 2 54 21 363 2 59 1 62
15-00 to 16-00 72 59 37 92 75 0 39 4 57 46 481 1 54 2 57
16-00 to 17-00 43 43 46 91 100 0 26 1 38 29 417 5 58 0 63
17-00 to 18-00 73 49 83 112 143 0 31 5 64 47 607 10 53 0 63
18-00 to 19-00 77 90 78 83 121 0 54 3 79 55 640 22 55 0 77
19-00 to 20-00 56 73 74 80 154 6 35 2 76 51 607 25 52 0 77
20-00 to 21-00 36 76 14 30 73 4 43 17 109 62 464 40 61 0 101
21-00 to 22-00 8 51 8 39 63 4 38 1 116 47 375 12 57 0 69
22-00 to 23-00 11 63 32 16 29 1 12 5 123 39 331 16 23 0 39
23-00 to 24-00 21 22 11 20 25 1 9 19 111 41 280 2 18 0 20
00-00 to 01-00 14 13 4 9 15 0 3 12 85 39 194 1 7 0 8
01-00 to 02-00 16 12 0 4 9 1 3 2 74 43 164 0 11 0 11
02-00 to 03-00 18 10 0 8 12 0 3 8 93 50 202 0 6 0 6
03-00 to 04-00 17 1 1 11 11 0 3 0 80 26 150 2 10 0 12
04-00 to 05-00 24 1 5 8 4 9 3 1 54 28 137 1 22 0 23
05-00 to 06-00 50 26 17 7 7 20 8 0 20 13 168 1 67 0 68
06-00 to 07-00 38 123 23 24 26 18 15 2 19 22 310 7 98 0 105
07-00 to 08-00 29 149 13 38 31 12 25 11 25 20 353 4 58 0 62
Total 767 1211 579 994 1292 84 486 126 1626 822 7987 176 1014 3 1193
Appendix B - Page 3
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-4 From: E P Z To: Abdullahpur Date 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 48 24 14 17 17 0 13 9 26 29 197 15 55 0 70
09-00 to 10-00 28 25 15 10 25 0 15 14 23 20 175 11 80 0 91
10-00 to 11-00 20 27 9 18 24 2 24 7 33 27 191 7 117 0 124
11-00 to 12-00 29 29 14 22 30 0 40 15 38 39 256 10 125 0 135
12-00 to 13-00 31 26 23 21 31 0 36 10 31 54 263 11 97 0 108
13-00 to 14-00 30 34 28 29 39 2 40 12 31 41 286 21 95 0 116
14-00 to 15-00 27 19 10 19 51 0 45 17 26 40 254 17 72 0 89
15-00 to 16-00 68 27 25 36 82 3 36 12 35 65 389 9 77 0 86
16-00 to 17-00 47 27 20 31 56 1 39 12 50 49 332 12 84 0 96
17-00 to 18-00 31 29 23 28 55 2 40 13 36 39 296 29 81 0 110
18-00 to 19-00 30 31 26 30 51 1 46 24 47 48 334 55 68 0 123
19-00 to 20-00 32 23 19 17 39 1 39 28 62 51 311 51 59 0 110
20-00 to 21-00 37 23 30 17 38 0 27 28 103 45 348 73 73 0 146
21-00 to 22-00 15 22 10 15 27 3 25 21 144 62 344 23 50 0 73
22-00 to 23-00 22 15 14 16 6 1 19 12 132 72 309 13 55 0 68
23-00 to 24-00 19 4 11 5 17 5 18 17 89 28 213 3 40 0 43
00-00 to 01-00 14 2 4 5 8 0 4 10 71 56 174 2 29 0 31
01-00 to 02-00 8 2 6 4 2 0 0 33 65 35 155 1 24 0 25
02-00 to 03-00 20 2 7 2 2 0 0 21 45 24 123 1 18 0 19
03-00 to 04-00 22 1 5 5 4 0 0 16 48 24 125 2 109 0 111
04-00 to 05-00 32 6 3 3 11 3 2 15 21 22 118 3 31 0 34
05-00 to 06-00 102 14 10 20 15 3 3 16 14 19 216 4 52 0 56
06-00 to 07-00 38 25 10 25 7 5 3 11 20 15 159 12 44 0 56
07-00 to 08-00 44 60 17 26 26 3 17 15 20 25 253 0 42 0 42
Total 794 497 353 421 663 35 531 388 1210 929 5821 385 1577 0 1962
Appendix B - Page 4
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Abdullahpur Dated 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 1 9 23 6 10 1 19 8 16 13 106 0 60 9 69
09-00 to 10-00 0 2 33 17 6 1 15 6 11 19 110 2 96 1 99
10-00 to 11-00 0 1 21 11 1 0 25 7 5 16 87 5 97 0 102
11-00 to 12-00 0 0 28 15 4 0 15 10 14 15 101 0 38 1 39
12-00 to 13-00 0 9 35 26 7 0 22 11 13 14 137 1 37 1 39
13-00 to 14-00 5 10 34 2 9 12 24 12 17 21 146 0 29 1 30
14-00 to 15-00 4 4 21 7 10 10 17 10 8 16 107 0 17 0 17
15-00 to 16-00 6 6 29 20 12 3 19 16 16 22 149 0 20 1 21
16-00 to 17-00 6 3 53 32 19 3 27 37 8 24 212 0 49 0 49
17-00 to 18-00 5 5 31 51 26 2 34 25 9 8 196 2 56 1 59
18-00 to 19-00 5 5 42 36 28 4 27 33 13 16 209 4 23 0 27
19-00 to 20-00 5 3 32 40 21 4 12 22 5 20 164 5 37 0 42
20-00 to 21-00 5 1 42 48 36 4 28 20 0 12 196 2 38 0 40
21-00 to 22-00 3 1 45 48 20 2 12 25 4 11 171 0 30 0 30
22-00 to 23-00 6 1 48 28 11 1 11 32 2 9 149 0 26 1 27
23-00 to 24-00 0 0 20 56 26 2 6 35 2 8 155 0 16 0 16
00-00 to 01-00 3 0 20 29 23 2 4 36 7 11 135 0 19 0 19
01-00 to 02-00 5 1 12 23 5 1 7 49 5 6 114 0 14 0 14
02-00 to 03-00 0 1 12 20 4 2 3 41 9 11 103 0 10 0 10
03-00 to 04-00 3 1 17 31 2 1 6 29 6 14 110 0 8 0 8
04-00 to 05-00 0 2 13 52 2 5 3 30 5 16 128 0 9 0 9
05-00 to 06-00 1 1 10 45 5 2 1 31 4 13 113 0 17 0 17
06-00 to 07-00 0 4 11 33 16 11 8 23 2 4 112 4 42 0 46
07-00 to 08-00 3 11 27 17 9 7 17 22 4 5 122 2 98 0 100
Total 66 81 659 693 312 80 362 570 185 324 3332 27 886 16 929
Appendix B - Page 5
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-6 From: Nabinagar To: E P Z Dated 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 80 121 40 28 41 0 35 67 9 29 450 23 40 0 63
09-00 to 10-00 53 76 13 31 45 0 37 23 64 57 399 5 47 0 52
10-00 to 11-00 38 62 11 29 38 0 45 47 15 43 328 1 58 0 59
11-00 to 12-00 39 118 29 32 50 0 46 33 30 57 434 10 61 0 71
12-00 to 13-00 36 90 22 34 41 0 48 16 58 51 396 2 62 1 65
13-00 to 14-00 36 78 25 22 68 5 34 23 34 32 357 0 59 0 59
14-00 to 15-00 39 85 20 19 56 10 75 0 59 38 401 2 88 0 90
15-00 to 16-00 31 113 19 22 44 0 84 16 68 39 436 5 87 1 93
16-00 to 17-00 82 122 30 23 37 0 76 52 58 57 537 3 67 0 70
17-00 to 18-00 69 111 30 26 42 0 56 33 46 69 482 15 73 2 90
18-00 to 19-00 68 107 25 29 53 0 66 32 41 62 483 27 80 1 108
19-00 to 20-00 39 108 16 39 53 0 62 8 34 61 420 49 56 0 105
20-00 to 21-00 53 64 13 23 63 35 57 2 33 52 395 5 34 0 39
21-00 to 22-00 24 87 3 33 38 2 8 0 42 50 287 0 56 0 56
22-00 to 23-00 48 27 31 29 15 3 55 86 56 37 387 1 47 0 48
23-00 to 24-00 30 20 29 16 35 2 45 49 55 31 312 0 31 0 31
00-00 to 01-00 32 32 16 2 8 1 28 45 45 51 260 0 33 0 33
01-00 to 02-00 35 36 17 0 0 10 11 53 56 29 247 0 22 0 22
02-00 to 03-00 30 17 16 3 5 0 6 42 45 23 187 0 8 0 8
03-00 to 04-00 87 16 5 3 16 0 9 43 51 32 262 0 3 0 3
04-00 to 05-00 14 18 7 7 19 0 16 48 47 29 205 0 3 0 3
05-00 to 06-00 51 20 26 17 12 0 26 40 42 29 263 0 8 0 8
06-00 to 07-00 20 79 10 33 11 57 39 23 50 22 344 12 46 0 58
07-00 to 08-00 10 102 23 31 32 53 54 12 56 29 402 52 54 0 106
Total 1044 1709 476 531 822 178 1018 793 1094 1009 8674 212 1123 5 1340
Appendix B - Page 6
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: Abdullahpur Date: 20.07.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 3 19 34 13 41 12 0 3 16 141 8 67 0 75
09-00 to 10-00 0 1 95 21 10 34 14 0 0 13 188 20 78 0 98
10-00 to 11-00 0 2 8 20 9 27 11 0 0 15 92 14 57 0 71
11-00 to 12-00 0 0 6 16 7 18 8 0 0 6 61 6 57 0 63
12-00 to 13-00 0 0 12 20 7 21 7 0 0 5 72 2 52 0 54
13-00 to 14-00 0 0 11 39 5 22 10 0 0 2 89 3 80 0 83
14-00 to 15-00 0 0 5 26 3 17 3 0 0 4 58 4 75 0 79
15-00 to 16-00 0 0 3 21 1 10 3 0 0 3 41 1 69 0 70
16-00 to 17-00 0 0 0 31 3 20 3 0 0 5 62 2 79 0 81
17-00 to 18-00 0 0 4 38 3 27 7 0 0 2 81 3 76 0 79
18-00 to 19-00 0 0 0 30 3 15 3 0 0 3 54 3 59 0 62
19-00 to 20-00 0 0 4 34 1 16 3 0 0 5 63 1 73 0 74
20-00 to 21-00 0 0 8 34 5 12 0 0 0 3 62 0 68 0 68
21-00 to 22-00 0 0 6 38 9 6 0 0 0 3 62 0 47 0 47
22-00 to 23-00 0 1 7 17 2 3 0 0 5 5 40 0 31 0 31
23-00 to 24-00 0 0 2 12 2 4 0 0 2 7 29 0 21 0 21
00-00 to 01-00 0 0 0 4 1 3 0 0 0 5 13 0 10 0 10
01-00 to 02-00 0 0 0 4 1 3 0 0 5 2 15 0 9 0 9
02-00 to 03-00 0 0 0 4 1 1 0 0 7 1 14 0 7 0 7
03-00 to 04-00 0 0 1 1 0 3 0 0 5 4 14 0 5 0 5
04-00 to 05-00 0 0 0 2 0 4 0 0 0 2 8 0 8 0 8
05-00 to 06-00 0 0 0 14 0 2 0 0 0 3 19 0 13 0 13
06-00 to 07-00 0 0 0 77 0 5 0 0 0 2 84 0 96 0 96
07-00 to 08-00 0 0 0 139 0 5 0 0 0 0 144 0 158 0 158
Total 0 7 191 676 86 319 84 0 27 116 1506 67 1295 0 1362
PCU Value 3 3 3 1 1 0.75 0.75 3 3 3
0 21 573 676 86 239.25 63 0 81 348 2,087
Appendix B - Page 7
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Nabinagar Dated 20.07.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 1 0 2 2 0 3 0 0 5 13 0 10 0 10
09-00 to 10-00 0 3 0 8 4 0 2 0 9 5 31 1 17 0 18
10-00 to 11-00 0 0 0 11 6 0 8 0 13 14 52 0 19 0 19
11-00 to 12-00 0 0 4 8 3 0 4 0 3 5 27 2 13 0 15
12-00 to 13-00 0 0 1 2 1 0 1 0 2 5 12 6 6 2 14
13-00 to 14-00 0 0 5 3 8 0 2 0 8 4 30 2 10 1 13
14-00 to 15-00 0 0 4 8 11 0 6 0 0 5 34 8 20 0 28
15-00 to 16-00 0 0 3 8 8 0 7 0 0 6 32 4 17 0 21
16-00 to 17-00 0 0 6 5 5 0 5 0 0 4 25 0 9 0 9
17-00 to 18-00 0 2 5 1 1 0 6 0 0 0 15 4 7 2 13
18-00 to 19-00 0 0 0 4 2 0 4 0 0 7 17 1 9 0 10
19-00 to 20-00 0 0 0 11 0 0 9 0 0 14 34 8 2 0 10
20-00 to 21-00 0 0 5 0 3 0 1 0 0 3 12 6 6 0 12
21-00 to 22-00 0 0 4 0 3 0 4 0 0 3 14 1 4 0 5
22-00 to 23-00 0 0 3 0 0 0 2 0 0 0 5 1 2 0 3
23-00 to 24-00 0 0 3 0 0 0 2 0 0 0 5 11 2 0 13
00-00 to 01-00 0 0 3 0 0 0 3 0 0 0 6 2 1 0 3
01-00 to 02-00 0 0 3 0 0 0 0 0 3 0 6 0 2 0 2
02-00 to 03-00 2 0 0 0 0 0 3 0 0 0 5 0 3 0 3
03-00 to 04-00 0 0 1 0 0 2 0 0 0 0 3 0 1 0 1
04-00 to 05-00 0 0 0 0 1 0 1 0 0 0 2 1 0 0 1
05-00 to 06-00 0 0 1 0 2 0 2 0 0 3 8 0 3 0 3
06-00 to 07-00 0 2 3 0 0 2 1 0 1 1 10 0 1 0 1
07-00 to 08-00 0 2 2 0 0 0 1 0 0 1 6 3 3 0 6
Total 2 10 56 71 60 4 77 0 39 85 404 61 167 5 233
PCU Value 3 3 3 1 1 0.75 0.75 3 3 3
6 30 168 71 60 3 57.75 0 117 255 768
Appendix B - Page 8
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: E P Z Date: 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 52 78 67 79 60 60 35 15 42 55 543 27 49 0 76
09-00 to 10-00 31 74 55 35 47 39 33 16 15 47 392 21 38 0 59
10-00 to 11-00 21 19 14 45 40 37 31 19 19 14 259 25 35 0 60
11-00 to 12-00 30 34 24 41 47 39 40 18 23 14 310 27 30 1 58
12-00 to 13-00 14 31 12 60 67 45 44 15 11 20 319 34 43 0 77
13-00 to 14-00 56 60 24 54 50 39 30 24 32 32 401 21 41 1 63
14-00 to 15-00 40 34 28 51 42 54 46 17 14 23 349 14 50 0 64
15-00 to 16-00 38 15 4 42 31 36 35 29 17 11 258 28 44 0 72
16-00 to 17-00 19 28 11 47 29 35 12 16 17 25 239 25 40 0 65
17-00 to 18-00 47 64 25 49 54 41 40 64 26 64 474 23 38 0 61
18-00 to 19-00 25 34 21 63 50 36 37 28 31 30 355 25 41 0 66
19-00 to 20-00 33 27 17 47 39 32 31 26 31 39 322 19 29 0 48
20-00 to 21-00 22 31 6 15 22 25 17 29 28 37 232 1 17 0 18
21-00 to 22-00 30 30 16 32 33 27 12 52 26 20 278 8 9 0 17
22-00 to 23-00 30 35 20 22 33 25 27 48 46 49 335 8 13 0 21
23-00 to 24-00 51 27 19 29 20 24 20 49 46 21 306 4 12 0 16
00-00 to 01-00 34 13 15 18 15 21 17 54 42 21 250 4 20 0 24
01-00 to 02-00 18 5 12 18 17 11 10 49 26 24 190 1 16 0 17
02-00 to 03-00 26 11 13 11 17 10 8 49 35 43 223 3 6 0 9
03-00 to 04-00 34 3 15 13 12 4 5 46 48 26 206 0 6 0 6
04-00 to 05-00 23 1 15 12 14 3 9 40 44 43 204 0 1 0 1
05-00 to 06-00 19 20 22 12 20 15 7 43 27 24 209 6 7 0 13
06-00 to 07-00 22 30 25 27 32 24 22 29 29 24 264 15 35 0 50
07-00 to 08-00 19 31 31 48 37 26 25 30 23 24 294 23 34 0 57
Total 734 735 511 870 828 708 593 805 698 730 7212 362 654 2 1018
Appendix B - Page 9
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-2 From: Abdullahpur To: Nabinagar Date: 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 37 56 43 32 13 13 8 40 41 45 328 13 15 0 28
09-00 to 10-00 21 39 32 33 10 14 10 20 19 44 242 10 27 0 37
10-00 to 11-00 9 23 26 21 4 6 1 5 15 20 130 4 86 0 90
11-00 to 12-00 5 34 33 34 0 8 0 11 11 19 155 15 150 0 165
12-00 to 13-00 9 38 44 19 0 6 12 9 8 19 164 9 135 0 144
13-00 to 14-00 10 45 52 37 4 10 10 7 13 18 206 0 150 0 150
14-00 to 15-00 10 43 47 14 2 3 12 10 8 17 166 7 145 0 152
15-00 to 16-00 27 51 29 34 17 19 17 19 23 23 259 27 19 1 47
16-00 to 17-00 16 47 45 15 4 2 8 13 17 20 187 1 160 0 161
17-00 to 18-00 15 38 52 23 3 3 6 8 20 18 186 2 146 0 148
18-00 to 19-00 11 39 51 14 2 3 7 13 12 24 176 0 112 1 113
19-00 to 20-00 15 42 50 11 1 1 6 9 11 31 177 0 78 0 78
20-00 to 21-00 22 46 49 22 23 8 10 12 20 25 237 4 27 0 31
21-00 to 22-00 32 42 46 9 5 7 6 21 14 29 211 2 20 0 22
22-00 to 23-00 28 39 46 13 6 6 6 20 18 26 208 3 32 0 35
23-00 to 24-00 25 35 35 22 17 8 4 20 26 34 226 3 21 0 24
00-00 to 01-00 18 3 18 10 5 6 5 36 34 34 169 7 8 0 15
01-00 to 02-00 21 1 31 13 11 5 5 33 42 34 196 0 8 0 8
02-00 to 03-00 27 6 27 7 4 5 4 35 40 36 191 0 7 0 7
03-00 to 04-00 28 3 30 6 3 3 3 30 37 35 178 0 8 0 8
04-00 to 05-00 26 2 31 7 4 11 3 26 32 35 177 0 12 0 12
05-00 to 06-00 20 11 34 7 6 8 4 23 28 20 161 1 16 0 17
06-00 to 07-00 4 32 47 10 6 10 10 5 6 15 145 13 26 0 39
07-00 to 08-00 7 48 44 12 8 12 7 7 7 10 162 14 51 0 65
Total 443 763 942 425 158 177 164 432 502 631 4637 135 1459 2 1596
Appendix B - Page 10
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-3 From: E P Z To: Nabinagar Date 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 20 64 12 5 27 4 8 8 30 25 203 5 19 1 25
09-00 to 10-00 37 83 10 25 44 4 13 10 55 32 313 5 29 0 34
10-00 to 11-00 37 77 12 13 60 5 18 13 76 40 351 2 26 0 28
11-00 to 12-00 28 78 23 13 99 1 23 6 58 37 366 0 23 0 23
12-00 to 13-00 30 71 29 12 71 6 29 5 43 28 324 2 31 0 33
13-00 to 14-00 46 59 21 14 64 9 30 8 52 46 349 3 24 0 27
14-00 to 15-00 32 100 13 6 41 8 22 9 48 31 310 2 31 0 33
15-00 to 16-00 60 96 18 9 86 4 18 12 70 38 411 3 19 0 22
16-00 to 17-00 60 95 17 11 44 6 20 19 48 38 358 1 19 0 20
17-00 to 18-00 115 85 31 12 86 5 15 12 26 32 419 2 14 0 16
18-00 to 19-00 69 146 34 17 97 9 22 12 56 60 522 2 17 0 19
19-00 to 20-00 46 91 22 15 41 2 5 20 40 33 315 0 4 0 4
20-00 to 21-00 21 52 14 9 25 8 16 19 51 26 241 0 10 0 10
21-00 to 22-00 33 74 18 20 48 5 5 29 47 34 313 3 6 0 9
22-00 to 23-00 22 110 12 19 32 4 6 18 57 35 315 0 8 0 8
23-00 to 24-00 23 53 13 21 21 9 5 2 57 38 242 2 9 0 11
00-00 to 01-00 20 20 6 17 23 3 6 23 53 27 198 1 3 0 4
01-00 to 02-00 19 9 3 6 20 2 8 20 52 23 162 0 0 0 0
02-00 to 03-00 14 4 1 5 10 0 4 21 48 27 134 0 4 0 4
03-00 to 04-00 19 18 3 8 13 1 6 15 31 18 132 0 1 0 1
04-00 to 05-00 29 15 9 12 20 3 1 25 45 28 187 1 9 0 10
05-00 to 06-00 24 15 9 8 7 6 1 15 13 12 110 2 5 0 7
06-00 to 07-00 34 43 17 18 46 10 10 14 22 20 234 7 22 0 29
07-00 to 08-00 86 208 35 37 83 30 7 8 30 31 555 16 17 1 34
Total 924 1666 382 332 1108 144 298 343 1108 759 7064 59 350 2 411
Appendix B - Page 11
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-4 From: E P Z To: Abdullahpur Date 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 33 26 51 29 36 30 17 26 35 22 305 3 17 0 20
09-00 to 10-00 27 39 56 25 37 14 12 27 27 19 283 6 38 0 44
10-00 to 11-00 54 53 60 26 55 6 13 55 24 27 373 8 52 0 60
11-00 to 12-00 37 46 54 26 42 14 28 34 19 17 317 7 41 0 48
12-00 to 13-00 22 62 17 40 50 10 15 15 18 17 266 15 43 0 58
13-00 to 14-00 34 62 5 25 55 6 15 11 26 23 262 7 25 0 32
14-00 to 15-00 26 59 7 17 37 1 6 10 14 21 198 7 22 0 29
15-00 to 16-00 23 55 28 21 22 5 7 8 13 19 201 4 20 0 24
16-00 to 17-00 48 50 24 28 21 9 18 22 25 24 269 8 20 0 28
17-00 to 18-00 91 70 22 41 67 25 29 53 40 56 494 12 57 0 69
18-00 to 19-00 64 59 17 34 52 16 34 41 42 38 397 10 37 0 47
19-00 to 20-00 58 49 20 28 47 18 22 28 31 29 330 2 17 0 19
20-00 to 21-00 26 21 13 14 26 7 7 23 14 7 158 3 6 0 9
21-00 to 22-00 21 30 11 18 19 8 6 30 16 12 171 1 3 0 4
22-00 to 23-00 22 15 11 16 21 11 10 35 12 8 161 2 9 0 11
23-00 to 24-00 52 19 16 14 13 16 5 15 12 12 174 2 4 0 6
00-00 to 01-00 45 22 6 13 20 4 2 56 45 25 238 0 1 0 1
01-00 to 02-00 38 14 3 12 16 3 6 60 43 22 217 0 1 0 1
02-00 to 03-00 23 10 1 12 10 7 7 56 31 21 178 1 0 0 1
03-00 to 04-00 27 1 3 7 10 6 6 27 21 12 120 0 0 0 0
04-00 to 05-00 23 0 4 10 11 5 3 18 14 8 96 0 1 0 1
05-00 to 06-00 30 20 10 18 30 9 12 18 22 16 185 1 15 0 16
06-00 to 07-00 26 46 13 16 27 16 18 14 4 8 188 7 42 0 49
07-00 to 08-00 82 77 25 33 34 23 30 17 12 18 351 1 60 0 61
Total 932 905 477 523 758 269 328 699 560 481 5932 107 531 0 638
Appendix B - Page 12
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Abdullahpur Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 2 32 11 13 2 18 3 1 18 100 17 49 0 66
09-00 to 10-00 0 2 39 9 11 4 27 1 5 38 136 10 81 0 91
10-00 to 11-00 0 4 32 9 18 7 16 3 1 23 113 15 67 0 82
11-00 to 12-00 0 1 40 11 9 6 21 2 7 18 115 8 44 1 53
12-00 to 13-00 0 3 32 10 5 6 13 0 8 28 105 5 24 0 29
13-00 to 14-00 0 6 47 13 16 6 18 2 13 16 137 14 47 1 62
14-00 to 15-00 0 26 54 11 24 2 22 21 25 38 223 12 32 0 44
15-00 to 16-00 1 23 54 25 28 12 11 8 26 42 230 10 32 2 44
16-00 to 17-00 0 9 52 16 26 5 19 5 12 24 168 8 37 0 45
17-00 to 18-00 0 11 42 12 30 3 16 7 9 14 144 8 11 0 19
18-00 to 19-00 0 8 38 8 27 6 33 8 5 12 145 7 42 0 49
19-00 to 20-00 0 6 29 5 15 5 9 4 4 13 90 4 19 0 23
20-00 to 21-00 0 6 20 2 8 3 8 3 16 23 89 2 15 0 17
21-00 to 22-00 0 3 17 8 13 4 7 4 38 30 124 4 18 0 22
22-00 to 23-00 0 1 27 3 5 2 3 9 43 36 129 1 9 1 11
23-00 to 24-00 0 5 23 2 4 1 1 32 31 36 135 2 9 0 11
00-00 to 01-00 0 0 4 3 3 0 0 14 21 17 62 0 10 0 10
01-00 to 02-00 0 0 2 2 5 3 1 11 30 15 69 1 8 0 9
02-00 to 03-00 0 0 2 4 7 1 2 20 23 14 73 0 9 0 9
03-00 to 04-00 0 0 5 3 2 2 1 12 22 19 66 1 9 0 10
04-00 to 05-00 0 0 6 2 3 2 2 13 24 12 64 1 8 0 9
05-00 to 06-00 0 9 15 6 3 5 2 8 12 19 79 2 10 0 12
06-00 to 07-00 3 14 40 3 9 9 6 1 4 4 93 4 21 0 25
07-00 to 08-00 0 19 66 5 11 4 18 3 6 4 136 75 74 0 149
Total 4 158 718 183 295 100 274 194 386 513 2825 211 685 5 901
Appendix B - Page 13
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-6 From: Nabinagar To: E P Z Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 69 49 5 35 38 14 52 32 54 39 387 8 81 0 89
09-00 to 10-00 130 83 34 34 49 9 35 59 66 53 552 10 61 1 72
10-00 to 11-00 91 89 23 14 46 3 55 39 97 47 504 1 121 0 122
11-00 to 12-00 64 95 13 22 34 0 46 23 89 33 419 5 105 0 110
12-00 to 13-00 28 80 1 14 19 0 44 12 88 50 336 0 84 0 84
13-00 to 14-00 40 66 9 20 37 2 53 13 51 28 319 3 135 0 138
14-00 to 15-00 37 44 11 17 35 3 36 17 41 21 262 0 107 0 107
15-00 to 16-00 36 68 0 15 32 0 76 26 50 29 332 2 117 0 119
16-00 to 17-00 57 91 0 18 29 4 54 22 38 38 351 3 101 0 104
17-00 to 18-00 65 107 0 24 74 7 50 23 40 60 450 0 98 0 98
18-00 to 19-00 43 108 0 9 38 30 83 7 41 63 422 2 134 0 136
19-00 to 20-00 36 76 0 6 27 18 75 4 45 58 345 2 106 0 108
20-00 to 21-00 61 84 12 17 47 11 61 10 45 64 412 10 80 0 90
21-00 to 22-00 48 70 15 34 52 9 55 17 47 69 416 3 77 0 80
22-00 to 23-00 48 68 17 13 29 6 48 16 49 32 326 0 70 0 70
23-00 to 24-00 40 46 17 6 19 0 49 11 44 30 262 0 64 0 64
00-00 to 01-00 30 33 5 10 13 2 6 25 45 23 192 0 10 0 10
01-00 to 02-00 44 20 3 9 11 2 4 16 52 21 182 0 10 1 11
02-00 to 03-00 24 16 24 6 4 0 2 14 69 16 175 0 7 0 7
03-00 to 04-00 33 12 33 12 12 0 3 16 65 14 200 2 10 0 12
04-00 to 05-00 34 13 3 14 5 0 1 13 68 12 163 0 5 0 5
05-00 to 06-00 55 18 19 13 5 0 0 16 72 18 216 0 6 0 6
06-00 to 07-00 57 63 8 21 53 0 0 30 65 30 327 15 29 0 44
07-00 to 08-00 56 71 5 37 49 0 0 31 63 25 337 91 49 0 140
Total 1226 1470 257 420 757 120 888 492 1384 873 7887 157 1667 2 1826
Appendix B - Page 14
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: Abdullahpur Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 2 2 11 6 0 0 0 3 1 25 0 35 1 36
09-00 to 10-00 0 11 9 6 6 1 6 0 1 4 44 0 16 0 16
10-00 to 11-00 0 7 1 4 1 0 0 0 2 1 16 1 19 0 20
11-00 to 12-00 0 7 1 0 0 2 1 0 0 5 16 3 19 0 22
12-00 to 13-00 0 5 0 0 9 0 1 0 0 3 18 3 23 0 26
13-00 to 14-00 0 3 0 0 6 0 1 0 0 4 14 0 12 0 12
14-00 to 15-00 0 2 1 0 0 0 0 0 6 2 11 0 11 0 11
15-00 to 16-00 0 3 2 0 3 2 0 0 0 1 11 1 14 0 15
16-00 to 17-00 0 1 0 0 2 0 0 0 2 4 9 0 6 0 6
17-00 to 18-00 1 1 0 11 3 0 1 0 0 6 23 0 7 0 7
18-00 to 19-00 0 1 3 4 0 0 1 0 1 3 13 0 6 0 6
19-00 to 20-00 0 2 3 4 2 0 0 0 0 2 13 0 8 0 8
20-00 to 21-00 0 0 0 0 2 0 1 0 0 4 7 0 19 0 19
21-00 to 22-00 0 1 0 6 3 0 1 0 0 3 14 0 10 0 10
22-00 to 23-00 1 1 2 5 3 1 0 0 2 4 19 1 17 0 18
23-00 to 24-00 0 0 0 3 6 0 0 1 8 3 21 0 9 0 9
00-00 to 01-00 0 0 0 1 5 0 1 2 5 7 21 0 12 0 12
01-00 to 02-00 0 0 0 13 0 0 0 1 7 10 31 0 4 0 4
02-00 to 03-00 0 0 0 4 0 0 0 0 2 7 13 0 3 0 3
03-00 to 04-00 0 0 0 0 0 0 0 0 2 3 5 0 2 0 2
04-00 to 05-00 0 0 0 0 0 0 0 0 1 1 2 0 0 0 0
05-00 to 06-00 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0
06-00 to 07-00 0 0 0 2 0 0 0 0 2 0 4 0 0 0 0
07-00 to 08-00 0 0 0 11 0 0 1 0 3 5 20 0 21 0 21
Total 2 47 24 85 57 6 15 4 50 83 373 9 273 1 283
Appendix B - Page 15
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Nabinagar Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 0 7 0 16 2 0 0 0 0 25 0 10 0 10
09-00 to 10-00 0 0 0 11 15 0 5 0 0 0 31 0 19 0 19
10-00 to 11-00 0 0 7 0 16 2 1 0 0 0 26 0 21 0 21
11-00 to 12-00 0 0 4 0 8 1 0 0 0 0 13 0 11 0 11
12-00 to 13-00 0 0 1 0 3 1 3 0 0 0 8 0 8 0 8
13-00 to 14-00 0 0 4 0 8 0 2 0 0 0 14 0 10 0 10
14-00 to 15-00 0 0 4 0 7 0 12 0 0 0 23 0 12 0 12
15-00 to 16-00 0 0 4 0 5 0 15 0 0 0 24 0 6 0 6
16-00 to 17-00 0 0 6 0 7 0 8 0 0 0 21 1 11 0 12
17-00 to 18-00 0 0 6 0 8 0 9 0 0 0 23 0 15 0 15
18-00 to 19-00 0 0 4 0 12 0 9 0 1 2 28 3 17 0 20
19-00 to 20-00 0 0 9 0 8 0 11 0 0 9 37 2 15 0 17
20-00 to 21-00 0 6 2 0 10 0 9 0 0 3 30 0 17 0 17
21-00 to 22-00 0 0 7 0 1 0 8 0 9 0 25 0 13 0 13
22-00 to 23-00 0 0 0 0 6 0 3 0 8 6 23 0 1 0 1
23-00 to 24-00 0 0 6 0 8 0 0 5 7 2 28 0 0 0 0
00-00 to 01-00 0 0 3 0 8 0 1 5 5 3 25 0 0 0 0
01-00 to 02-00 0 0 1 0 8 0 0 0 2 0 11 0 0 0 0
02-00 to 03-00 0 0 2 0 4 0 0 0 2 0 8 0 0 0 0
03-00 to 04-00 0 0 4 0 6 0 0 0 1 1 12 1 0 0 1
04-00 to 05-00 0 0 6 0 6 0 7 0 0 2 21 9 0 0 9
05-00 to 06-00 0 0 5 0 12 0 14 0 0 0 31 6 0 0 6
06-00 to 07-00 0 0 4 0 11 0 11 0 0 0 26 5 0 0 5
07-00 to 08-00 0 0 2 0 8 0 8 0 0 0 18 6 0 0 6
Total 0 6 98 11 201 6 136 10 35 28 531 33 186 0 219
Appendix B - Page 16
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-1 From: Savar To: Baipayl Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 25 44 73 78 81 37 39 18 58 50 503 0 36 0 36
09-00 to 10-00 72 39 58 94 174 2 25 37 62 60 623 0 32 0 32
10-00 to 11-00 70 47 55 43 52 37 39 64 64 60 531 0 42 0 42
11-00 to 12-00 58 51 52 73 116 34 43 29 61 66 583 0 35 0 35
12-00 to 13-00 68 40 56 69 81 11 25 46 49 40 485 0 22 0 22
13-00 to 14-00 56 40 48 61 54 13 29 34 47 54 436 0 21 0 21
14-00 to 15-00 32 37 38 32 44 10 22 18 57 37 327 1 15 0 16
15-00 to 16-00 21 42 38 34 30 6 19 8 55 65 318 0 26 0 26
16-00 to 17-00 38 45 34 29 18 12 18 10 53 58 315 0 19 0 19
17-00 to 18-00 47 9 52 42 29 1 13 18 58 58 327 0 19 0 19
18-00 to 19-00 47 40 50 29 29 5 29 11 55 50 345 0 15 0 15
19-00 to 20-00 67 44 43 79 71 21 32 28 57 54 496 0 26 0 26
20-00 to 21-00 49 37 32 28 35 5 15 31 53 52 337 0 9 0 9
21-00 to 22-00 62 48 34 32 38 0 22 40 31 32 339 0 10 0 10
22-00 to 23-00 72 48 33 28 24 3 7 46 56 48 365 0 2 0 2
23-00 to 24-00 61 38 19 25 20 5 4 48 38 55 313 0 5 0 5
00-00 to 01-00 66 28 10 16 19 6 2 53 41 41 282 0 2 0 2
01-00 to 02-00 66 21 18 13 13 5 2 43 24 30 235 0 2 0 2
02-00 to 03-00 57 19 17 15 14 3 2 34 25 29 215 0 3 0 3
03-00 to 04-00 40 25 10 10 8 4 1 50 38 25 211 0 1 0 1
04-00 to 05-00 10 33 7 11 11 3 2 37 49 38 201 0 1 0 1
05-00 to 06-00 11 23 15 16 16 0 1 30 34 31 177 0 1 0 1
06-00 to 07-00 30 22 22 30 16 6 1 17 17 31 192 0 2 0 2
07-00 to 08-00 51 32 90 19 18 8 3 19 49 38 327 0 2 0 2
Total 1176 852 904 906 1011 237 395 769 1131 1102 8483 1 348 0 349
Appendix B - Page 17
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-2 From: Savar To: Nayarhat Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 52 49 14 9 22 1 5 4 15 24 195 1 7 0 8
09-00 to 10-00 68 48 19 11 54 0 4 3 22 7 236 1 32 0 33
10-00 to 11-00 38 68 14 8 39 0 13 6 20 27 233 0 29 0 29
11-00 to 12-00 58 65 11 13 39 1 13 4 18 21 243 1 19 0 20
12-00 to 13-00 38 58 10 10 35 6 6 5 28 18 214 2 15 0 17
13-00 to 14-00 28 61 21 13 35 0 8 4 15 26 211 4 30 0 34
14-00 to 15-00 30 46 20 9 27 0 10 4 20 19 185 1 36 0 37
15-00 to 16-00 37 68 33 18 32 8 11 6 19 23 255 1 36 0 37
16-00 to 17-00 52 79 11 11 25 7 22 4 14 34 259 2 44 0 46
17-00 to 18-00 53 75 14 17 35 0 23 6 23 34 280 1 40 0 41
18-00 to 19-00 48 85 8 12 31 0 8 6 20 36 254 5 28 0 33
19-00 to 20-00 25 51 5 8 25 0 9 4 33 20 180 2 80 0 82
20-00 to 21-00 65 55 10 8 23 0 3 4 55 31 254 1 11 0 12
21-00 to 22-00 84 61 17 5 20 0 4 5 60 35 291 1 26 0 27
22-00 to 23-00 74 55 11 1 5 0 7 4 59 13 229 0 2 0 2
23-00 to 24-00 74 7 9 0 3 0 6 4 27 8 138 0 0 0 0
00-00 to 01-00 44 1 2 1 3 0 1 4 70 12 138 0 0 0 0
01-00 to 02-00 5 0 3 1 5 0 1 4 66 5 90 0 0 0 0
02-00 to 03-00 0 0 6 3 3 0 0 5 71 7 95 0 0 0 0
03-00 to 04-00 0 0 4 1 3 0 0 5 85 6 104 0 0 0 0
04-00 to 05-00 0 1 1 3 12 0 0 4 71 4 96 1 0 0 1
05-00 to 06-00 15 34 20 10 16 0 0 1 63 30 189 1 1 0 2
06-00 to 07-00 13 48 6 5 14 0 4 4 49 29 172 1 11 0 12
07-00 to 08-00 17 67 6 10 24 0 3 4 59 43 233 2 13 0 15
Total 918 1082 275 187 530 23 161 104 982 512 4774 28 460 0 488
Appendix B - Page 18
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-3 From: Baipayl To: Nayarhat Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 2 42 52 40 34 0 20 11 55 21 277 2 42 0 44
09-00 to 10-00 1 25 44 24 40 0 16 9 3 15 177 0 27 0 27
10-00 to 11-00 0 26 36 7 11 0 14 11 14 29 148 2 36 0 38
11-00 to 12-00 3 16 35 18 15 0 8 8 25 19 147 0 44 0 44
12-00 to 13-00 0 20 60 22 30 0 15 9 34 13 203 2 30 0 32
13-00 to 14-00 0 31 48 34 52 1 15 24 40 13 258 0 23 0 23
14-00 to 15-00 2 24 55 13 24 0 13 16 33 7 187 0 22 0 22
15-00 to 16-00 1 28 45 18 33 0 21 20 22 18 206 0 14 0 14
16-00 to 17-00 2 33 50 22 36 0 25 23 38 13 242 0 39 0 39
17-00 to 18-00 3 48 49 30 25 0 25 16 23 17 236 0 29 0 29
18-00 to 19-00 7 65 35 27 28 0 25 17 24 16 244 0 28 0 28
19-00 to 20-00 0 42 16 30 36 0 26 3 21 9 183 2 22 0 24
20-00 to 21-00 19 40 43 39 33 0 10 66 30 12 292 0 0 0 0
21-00 to 22-00 23 32 46 25 32 0 2 46 32 21 259 0 0 0 0
22-00 to 23-00 19 16 35 29 36 2 3 32 7 3 182 0 0 0 0
23-00 to 24-00 13 14 5 28 19 0 4 31 22 8 144 0 0 0 0
00-00 to 01-00 12 5 3 16 11 0 0 35 21 3 106 0 0 0 0
01-00 to 02-00 31 4 2 9 9 0 0 53 8 3 119 0 0 0 0
02-00 to 03-00 43 4 53 1 5 1 2 63 13 2 187 0 0 0 0
03-00 to 04-00 40 4 40 1 5 3 0 64 4 2 163 0 0 0 0
04-00 to 05-00 43 2 42 4 3 0 0 51 5 2 152 0 1 0 1
05-00 to 06-00 47 10 44 21 3 3 0 49 13 6 196 0 0 0 0
06-00 to 07-00 52 4 44 3 14 0 0 51 17 14 199 1 0 0 1
07-00 to 08-00 45 37 45 17 15 0 13 34 35 26 267 0 15 0 15
Total 408 572 927 478 549 10 257 742 539 292 4774 9 372 0 381
Appendix B - Page 19
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-4 From: Baipayl To: Savar Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 5 99 12 5 38 0 2 2 22 43 228 2 17 0 19
09-00 to 10-00 19 54 37 9 26 0 4 17 34 40 240 2 17 0 19
10-00 to 11-00 16 79 21 9 24 0 24 20 41 59 293 1 28 0 29
11-00 to 12-00 18 66 16 10 34 0 16 22 39 52 273 1 31 0 32
12-00 to 13-00 24 43 29 14 49 0 29 16 30 33 267 3 38 0 41
13-00 to 14-00 43 38 39 11 57 0 12 16 35 21 272 1 21 0 22
14-00 to 15-00 39 50 28 7 47 0 14 12 27 13 237 4 20 0 24
15-00 to 16-00 56 48 53 18 66 1 19 11 31 35 338 2 9 1 12
16-00 to 17-00 35 47 67 25 83 0 14 10 18 16 315 4 25 0 29
17-00 to 18-00 35 63 52 13 36 0 21 17 29 15 281 0 17 0 17
18-00 to 19-00 19 50 62 6 23 0 11 11 27 12 221 0 25 0 25
19-00 to 20-00 4 32 16 4 22 0 2 3 7 4 94 1 5 0 6
20-00 to 21-00 19 15 43 4 76 1 17 10 24 3 212 3 12 0 15
21-00 to 22-00 37 18 52 3 23 0 6 22 23 3 187 0 5 0 5
22-00 to 23-00 3 4 10 2 10 0 6 13 21 2 71 0 4 3 7
23-00 to 24-00 3 0 5 2 19 0 6 15 44 0 94 0 0 6 6
00-00 to 01-00 7 2 1 6 25 0 5 16 41 0 103 0 0 1 1
01-00 to 02-00 8 0 1 4 8 0 7 17 24 0 69 0 0 0 0
02-00 to 03-00 8 0 1 3 11 0 5 20 17 0 65 0 0 0 0
03-00 to 04-00 8 0 3 4 6 0 3 16 11 0 51 0 0 0 0
04-00 to 05-00 10 0 3 5 15 0 1 27 11 0 72 0 0 3 3
05-00 to 06-00 13 6 17 10 14 0 1 38 13 2 114 2 1 3 6
06-00 to 07-00 16 29 41 3 8 0 3 17 13 10 140 3 13 2 18
07-00 to 08-00 12 60 36 2 13 0 8 23 9 12 175 8 13 0 21
Total 457 803 645 179 733 2 236 391 591 375 4412 37 301 19 357
Appendix B - Page 20
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-5 From: Nayarhat To: Savar Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 34 45 26 35 60 0 17 9 48 30 304 3 0 0 3
09-00 to 10-00 24 42 12 19 41 0 17 0 34 25 214 2 28 0 30
10-00 to 11-00 16 55 8 29 61 0 18 2 60 30 279 5 38 0 43
11-00 to 12-00 26 52 16 27 62 0 22 2 51 28 286 5 37 0 42
12-00 to 13-00 18 48 11 26 62 0 26 1 63 25 280 6 36 0 42
13-00 to 14-00 48 55 8 34 67 0 26 1 52 16 307 7 41 0 48
14-00 to 15-00 46 61 17 27 56 0 35 5 63 33 343 2 30 0 32
15-00 to 16-00 47 61 25 32 69 1 27 0 61 31 354 3 29 0 32
16-00 to 17-00 50 52 27 40 69 0 34 3 53 55 383 2 52 0 54
17-00 to 18-00 70 37 39 45 94 0 30 2 54 56 427 3 27 0 30
18-00 to 19-00 61 35 23 55 97 1 22 1 58 71 424 4 21 0 25
19-00 to 20-00 82 44 41 38 75 1 29 4 57 47 418 2 20 0 22
20-00 to 21-00 72 60 28 85 91 3 11 10 65 32 457 0 4 0 4
21-00 to 22-00 66 75 34 46 52 4 9 9 60 55 410 5 5 0 10
22-00 to 23-00 71 55 41 13 21 7 9 8 70 50 345 0 12 0 12
23-00 to 24-00 42 45 24 8 24 2 3 9 60 40 257 0 7 0 7
00-00 to 01-00 54 30 20 5 12 5 6 29 40 35 236 0 9 0 9
01-00 to 02-00 19 2 10 3 7 8 6 38 16 14 123 0 8 0 8
02-00 to 03-00 6 5 2 13 7 5 5 42 27 26 138 0 7 0 7
03-00 to 04-00 16 6 13 18 16 6 7 15 40 40 177 0 4 0 4
04-00 to 05-00 41 39 13 12 8 8 8 23 43 42 237 0 5 0 5
05-00 to 06-00 16 44 15 11 8 4 8 26 15 20 167 0 10 0 10
06-00 to 07-00 13 43 13 7 10 2 9 16 11 32 156 0 19 0 19
07-00 to 08-00 72 65 28 7 15 2 8 18 18 35 268 1 8 0 9
Total 1010 1056 494 635 1084 59 392 273 1119 868 6990 50 457 0 507
Appendix B - Page 21
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-6 From: Nayarhat To: Baipayl Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 1 10 7 22 30 13 24 0 21 10 138 3 56 0 59
09-00 to 10-00 0 15 14 22 19 1 14 1 24 11 121 5 51 0 56
10-00 to 11-00 1 12 43 6 23 2 24 6 61 4 182 1 63 0 64
11-00 to 12-00 0 17 25 15 33 2 28 4 43 15 182 3 68 1 72
12-00 to 13-00 1 0 12 18 26 2 21 7 35 13 135 3 56 0 59
13-00 to 14-00 2 33 17 14 24 1 42 3 15 11 162 3 64 0 67
14-00 to 15-00 6 16 36 27 14 1 26 4 22 6 158 5 40 0 45
15-00 to 16-00 8 32 29 11 21 1 21 6 37 19 185 6 52 0 58
16-00 to 17-00 5 35 14 22 25 2 44 0 18 11 176 3 68 0 71
17-00 to 18-00 4 30 17 22 23 3 29 0 21 5 154 6 73 0 79
18-00 to 19-00 1 17 8 22 17 3 50 2 19 9 148 9 78 0 87
19-00 to 20-00 13 17 12 15 30 2 20 0 21 7 137 4 32 0 36
20-00 to 21-00 13 18 12 20 19 5 11 27 8 12 145 2 26 0 28
21-00 to 22-00 11 17 9 7 18 13 8 31 13 7 134 0 15 0 15
22-00 to 23-00 5 13 9 14 5 2 7 26 32 26 139 2 5 0 7
23-00 to 24-00 14 14 9 11 9 2 5 18 38 29 149 1 10 0 11
00-00 to 01-00 11 6 9 10 11 2 2 11 36 28 126 0 7 0 7
01-00 to 02-00 9 3 12 27 9 2 4 15 23 18 122 2 5 0 7
02-00 to 03-00 11 3 9 17 11 0 1 12 21 17 102 0 2 0 2
03-00 to 04-00 14 1 9 40 10 1 2 12 17 12 118 0 1 0 1
04-00 to 05-00 10 2 10 35 15 1 1 16 11 5 106 2 1 0 3
05-00 to 06-00 18 1 13 26 20 7 1 24 6 6 122 2 6 0 8
06-00 to 07-00 22 5 22 50 30 8 1 26 6 16 186 2 13 0 15
07-00 to 08-00 23 4 21 34 22 6 1 24 13 10 158 1 6 0 7
Total 203 321 378 507 464 82 387 275 561 307 3485 65 798 1 864
Appendix B - Page 22
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-1 From: Savar To: Baipayl Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 57 70 40 33 61 0 18 0 27 32 338 2 27 0 29
09-00 to 10-00 89 100 40 46 59 1 20 0 40 47 442 0 42 0 42
10-00 to 11-00 79 92 27 47 83 0 28 2 54 44 456 0 37 0 37
11-00 to 12-00 68 102 33 30 69 0 35 0 32 44 413 3 40 0 43
12-00 to 13-00 49 104 30 42 58 0 23 0 35 37 378 0 33 0 33
13-00 to 14-00 59 106 36 33 68 0 43 0 38 44 427 4 24 0 28
14-00 to 15-00 48 89 41 35 69 0 16 2 23 39 362 3 24 0 27
15-00 to 16-00 57 84 19 36 43 0 28 2 21 26 316 2 36 0 38
16-00 to 17-00 56 101 32 42 53 0 33 2 24 29 372 1 19 0 20
17-00 to 18-00 49 111 25 33 48 0 36 3 62 39 406 11 23 0 34
18-00 to 19-00 45 90 18 39 45 0 31 8 64 35 375 4 36 0 40
19-00 to 20-00 35 79 32 20 28 0 7 3 40 28 272 1 11 0 12
20-00 to 21-00 38 80 33 18 32 1 16 2 30 33 283 3 26 0 29
21-00 to 22-00 91 60 27 33 72 0 27 1 31 33 375 1 9 0 10
22-00 to 23-00 57 43 15 18 28 0 7 1 34 22 225 2 5 0 7
23-00 to 24-00 74 24 13 14 29 0 5 1 56 13 229 0 3 0 3
00-00 to 01-00 74 9 10 11 14 0 2 7 121 32 280 0 4 0 4
01-00 to 02-00 12 4 8 4 9 0 0 3 92 20 152 0 0 0 0
02-00 to 03-00 14 2 4 4 8 0 0 3 60 19 114 0 2 0 2
03-00 to 04-00 9 26 6 17 6 0 0 3 79 29 175 0 6 0 6
04-00 to 05-00 9 8 2 14 8 0 6 2 55 34 138 0 13 0 13
05-00 to 06-00 13 78 18 19 6 9 7 2 63 24 239 0 21 0 21
06-00 to 07-00 21 114 39 21 21 0 12 0 30 15 273 2 22 0 24
07-00 to 08-00 40 142 79 25 42 0 34 0 29 16 407 7 30 0 37
Total 1143 1718 627 634 959 11 434 47 1140 734 7447 46 493 0 539
Appendix B - Page 23
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-2 From: Savar To: Nayarhat Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 35 68 27 11 28 2 10 2 29 28 240 2 22 0 24
09-00 to 10-00 41 84 24 11 65 0 15 0 59 45 344 1 72 0 73
10-00 to 11-00 51 67 27 11 73 0 13 0 72 61 375 2 73 0 75
11-00 to 12-00 47 93 33 11 49 1 13 1 64 36 348 6 82 0 88
12-00 to 13-00 49 82 33 6 34 3 13 0 67 50 337 3 56 0 59
13-00 to 14-00 52 89 37 7 44 1 14 3 74 56 377 6 47 0 53
14-00 to 15-00 26 60 21 7 55 2 24 0 41 30 266 8 46 0 54
15-00 to 16-00 43 65 32 11 55 3 28 0 71 39 347 9 103 0 112
16-00 to 17-00 43 31 39 17 81 4 35 1 50 14 315 5 85 0 90
17-00 to 18-00 22 92 39 7 77 1 40 2 54 32 366 4 70 0 74
18-00 to 19-00 15 84 39 7 51 0 26 4 50 22 298 3 59 0 62
19-00 to 20-00 5 29 33 6 49 0 29 0 23 18 192 1 41 0 42
20-00 to 21-00 50 46 24 4 12 1 5 3 80 37 262 0 15 0 15
21-00 to 22-00 32 30 37 4 18 0 2 4 62 10 199 0 24 0 24
22-00 to 23-00 39 18 26 3 17 0 4 4 53 7 171 0 3 0 3
23-00 to 24-00 32 16 23 1 2 0 1 6 50 7 138 0 5 0 5
00-00 to 01-00 31 9 15 0 0 1 1 10 62 13 142 0 4 0 4
01-00 to 02-00 11 7 12 1 3 0 1 10 62 17 124 0 3 0 3
02-00 to 03-00 13 8 15 1 2 0 0 17 67 11 134 0 3 0 3
03-00 to 04-00 10 1 13 2 3 0 1 13 58 29 130 0 2 0 2
04-00 to 05-00 6 4 7 2 9 0 1 16 69 32 146 0 3 0 3
05-00 to 06-00 12 7 5 2 3 4 1 14 72 36 156 0 3 0 3
06-00 to 07-00 15 29 29 4 22 0 9 3 40 20 171 0 18 0 18
07-00 to 08-00 11 76 28 5 26 2 7 0 55 25 235 0 25 0 25
Total 691 1095 618 141 778 25 293 113 1384 675 5813 50 864 0 914
Appendix B - Page 24
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-3 From: Baipayl To: Nayarhat Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 15 34 31 5 27 0 9 6 35 18 180 4 39 0 43
09-00 to 10-00 27 70 14 27 33 2 10 4 18 31 236 8 52 0 60
10-00 to 11-00 17 52 13 17 35 0 10 6 31 36 217 10 43 0 53
11-00 to 12-00 11 62 20 10 54 0 8 3 26 26 220 2 45 0 47
12-00 to 13-00 17 55 15 17 56 0 12 2 23 36 233 3 38 0 41
13-00 to 14-00 27 63 11 11 32 3 9 2 16 9 183 7 27 0 34
14-00 to 15-00 18 55 23 6 48 0 10 2 19 13 194 8 35 0 43
15-00 to 16-00 29 62 10 9 48 0 13 2 25 18 216 6 42 1 49
16-00 to 17-00 45 61 11 10 61 0 13 3 28 28 260 3 49 0 52
17-00 to 18-00 44 72 20 30 66 0 12 2 25 48 319 5 45 0 50
18-00 to 19-00 51 75 60 28 69 0 14 4 42 72 415 4 44 0 48
19-00 to 20-00 25 79 18 25 59 0 9 8 6 43 272 2 28 0 30
20-00 to 21-00 23 51 18 9 53 0 12 10 29 25 230 5 20 0 25
21-00 to 22-00 18 29 12 13 40 1 12 3 35 15 178 1 19 0 20
22-00 to 23-00 15 28 7 6 22 1 5 3 45 21 153 3 12 0 15
23-00 to 24-00 17 23 22 7 29 1 1 6 69 33 208 1 6 0 7
00-00 to 01-00 10 11 8 4 14 1 0 4 38 22 112 1 6 0 7
01-00 to 02-00 17 0 10 1 16 2 0 4 60 24 134 0 2 0 2
02-00 to 03-00 15 4 2 1 4 2 0 5 44 19 96 0 0 0 0
03-00 to 04-00 9 3 1 1 4 3 0 2 25 28 76 0 2 0 2
04-00 to 05-00 13 1 8 9 4 4 0 9 53 15 116 1 3 0 4
05-00 to 06-00 19 18 11 11 18 2 1 5 23 14 122 4 12 0 16
06-00 to 07-00 19 56 37 6 33 4 7 2 21 10 195 3 12 0 15
07-00 to 08-00 18 71 25 7 18 2 6 3 24 16 190 0 18 0 18
Total 519 1035 407 270 843 28 173 100 760 620 4755 81 599 1 681
Appendix B - Page 25
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-4 From: Baipayl To: Savar Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 37 23 17 38 0 3 1 35 14 168 1 15 0 16
09-00 to 10-00 17 22 44 27 11 1 4 7 39 10 182 0 17 0 17
10-00 to 11-00 10 40 46 24 19 0 9 11 49 17 225 0 10 0 10
11-00 to 12-00 0 43 38 22 42 0 10 1 48 20 224 0 15 0 15
12-00 to 13-00 0 34 30 26 37 0 6 3 40 16 192 0 16 0 16
13-00 to 14-00 1 38 46 24 34 1 2 0 46 8 200 0 16 0 16
14-00 to 15-00 1 46 43 43 29 0 1 2 45 11 221 0 12 0 12
15-00 to 16-00 2 48 37 37 14 1 4 3 44 14 204 0 25 0 25
16-00 to 17-00 2 38 51 37 31 0 6 6 35 3 209 0 21 0 21
17-00 to 18-00 11 63 64 43 27 0 8 2 44 19 281 0 15 0 15
18-00 to 19-00 8 48 56 30 23 1 8 4 29 12 219 0 9 0 9
19-00 to 20-00 27 38 59 21 9 0 12 4 21 5 196 0 10 0 10
20-00 to 21-00 7 36 35 28 20 0 3 1 22 22 174 0 7 0 7
21-00 to 22-00 6 41 36 25 24 3 3 2 27 11 178 0 13 0 13
22-00 to 23-00 6 18 34 22 4 0 1 5 30 13 133 0 14 0 14
23-00 to 24-00 18 15 50 13 5 1 1 11 24 7 145 0 6 0 6
00-00 to 01-00 4 14 19 9 7 0 0 5 20 8 86 0 3 0 3
01-00 to 02-00 11 0 13 7 6 0 1 7 49 11 105 0 3 0 3
02-00 to 03-00 0 0 10 7 4 0 1 5 24 9 60 0 1 0 1
03-00 to 04-00 5 0 21 8 8 1 0 10 33 11 97 0 2 0 2
04-00 to 05-00 3 4 3 6 3 4 3 5 20 4 55 0 11 0 11
05-00 to 06-00 1 20 14 5 4 0 1 1 19 8 73 0 0 0 0
06-00 to 07-00 4 32 59 4 7 3 13 8 22 6 158 1 17 0 18
07-00 to 08-00 3 52 42 31 7 0 5 5 41 0 186 2 2 0 4
Total 147 727 873 516 413 16 105 109 806 259 3971 4 260 0 264
Appendix B - Page 26
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-5 From: Nayarhat To: Savar Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 47 49 15 23 19 0 11 13 41 41 259 0 24 0 24
09-00 to 10-00 46 31 28 24 28 1 11 3 27 19 218 6 26 0 32
10-00 to 11-00 31 36 16 21 50 0 17 0 44 20 235 5 35 0 40
11-00 to 12-00 44 46 17 28 43 0 24 6 45 31 284 4 31 0 35
12-00 to 13-00 38 43 18 29 30 0 9 6 32 21 226 1 22 0 23
13-00 to 14-00 54 86 20 36 61 0 27 9 43 21 357 3 30 0 33
14-00 to 15-00 50 40 19 26 38 1 20 4 30 16 244 2 21 0 23
15-00 to 16-00 51 53 15 30 58 0 23 11 26 20 287 0 38 0 38
16-00 to 17-00 49 40 16 37 113 0 34 4 29 18 340 0 46 0 46
17-00 to 18-00 39 69 17 34 113 0 37 9 47 24 389 6 40 0 46
18-00 to 19-00 59 58 21 43 129 0 40 9 53 35 447 0 31 0 31
19-00 to 20-00 61 64 28 41 66 1 16 6 50 27 360 0 13 0 13
20-00 to 21-00 43 51 29 14 34 0 7 15 41 20 254 0 18 0 18
21-00 to 22-00 56 38 18 15 21 0 16 6 49 18 237 0 9 0 9
22-00 to 23-00 48 23 6 8 27 1 2 9 59 13 196 0 5 0 5
23-00 to 24-00 39 11 6 11 33 6 0 9 38 5 158 0 5 0 5
00-00 to 01-00 22 2 1 5 16 0 3 4 30 6 89 0 12 0 12
01-00 to 02-00 22 0 3 3 19 0 0 5 21 6 79 0 6 0 6
02-00 to 03-00 19 2 0 4 22 2 0 1 22 3 75 0 4 0 4
03-00 to 04-00 29 7 3 5 12 0 0 0 23 7 86 0 4 0 4
04-00 to 05-00 35 25 8 10 14 0 0 1 33 4 130 0 10 0 10
05-00 to 06-00 51 65 14 10 12 3 5 5 14 12 191 1 10 0 11
06-00 to 07-00 89 117 20 11 24 0 9 2 12 9 293 1 8 0 9
07-00 to 08-00 77 109 21 22 35 0 29 5 20 16 334 1 10 0 11
Total 1099 1065 359 490 1017 15 340 142 829 412 5768 30 458 0 488
Appendix B - Page 27
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-6 From: Nayarhat To: Baipayl Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 3 24 26 17 10 12 21 4 38 13 168 3 55 0 58
09-00 to 10-00 0 27 37 25 20 0 21 6 66 15 217 3 63 0 66
10-00 to 11-00 0 16 31 15 18 0 8 5 52 16 161 2 61 0 63
11-00 to 12-00 1 23 32 20 16 0 20 7 104 12 235 2 92 0 94
12-00 to 13-00 0 25 28 12 12 1 13 4 58 41 194 4 51 0 55
13-00 to 14-00 0 22 37 19 26 1 12 6 36 11 170 5 32 1 38
14-00 to 15-00 1 34 35 19 17 1 17 3 66 17 210 4 79 0 83
15-00 to 16-00 3 32 38 26 20 2 27 5 32 26 211 3 53 0 56
16-00 to 17-00 1 36 37 27 22 6 16 3 62 19 229 1 77 0 78
17-00 to 18-00 1 49 29 22 25 0 56 13 33 25 253 9 87 0 96
18-00 to 19-00 0 37 26 22 35 0 36 5 57 30 248 2 53 0 55
19-00 to 20-00 1 28 24 19 13 4 10 5 27 15 146 5 51 0 56
20-00 to 21-00 1 19 19 12 18 3 15 9 49 20 165 2 71 0 73
21-00 to 22-00 0 17 13 11 23 1 19 3 70 25 182 1 48 0 49
22-00 to 23-00 0 10 15 8 11 0 1 1 16 13 75 0 15 0 15
23-00 to 24-00 0 8 9 7 4 1 6 5 16 13 69 0 22 0 22
00-00 to 01-00 0 1 6 6 7 0 7 5 31 17 80 0 16 0 16
01-00 to 02-00 0 1 3 7 4 0 1 4 9 11 40 0 9 0 9
02-00 to 03-00 0 0 2 5 4 0 2 4 13 9 39 0 4 0 4
03-00 to 04-00 0 6 4 4 11 0 0 4 20 11 60 0 11 0 11
04-00 to 05-00 0 4 3 2 4 2 1 3 5 6 30 0 11 0 11
05-00 to 06-00 0 10 12 4 2 9 4 1 0 9 51 0 18 0 18
06-00 to 07-00 1 93 29 4 2 5 17 1 13 17 182 7 50 0 57
07-00 to 08-00 1 86 24 28 19 15 25 4 39 28 269 24 92 0 116
Total 14 608 519 341 343 63 355 110 912 419 3684 77 1121 1 1199
Appendix B - Page 28
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Bailpayl To: Kashimpur Date : 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 6 16 58 20 55 3 24 19 24 30 255 7 8 2 17
09-00 to 10-00 16 28 15 42 60 5 34 54 47 56 357 1 8 0 9
10-00 to 11-00 12 22 26 44 65 3 10 78 33 39 332 3 8 0 11
11-00 to 12-00 2 36 21 50 75 0 43 83 40 51 401 3 17 0 20
12-00 to 13-00 3 29 13 30 62 0 34 55 51 51 328 1 1 0 2
13-00 to 14-00 8 31 17 28 56 0 21 46 42 51 300 2 0 2 4
14-00 to 15-00 1 38 4 46 66 0 17 34 38 38 282 0 12 0 12
15-00 to 16-00 0 29 19 45 75 0 32 48 60 58 366 1 0 0 1
16-00 to 17-00 1 17 11 42 85 8 32 11 48 45 300 0 21 0 21
17-00 to 18-00 1 15 28 36 65 0 25 154 48 44 416 0 22 0 22
18-00 to 19-00 4 11 30 32 35 4 34 57 33 27 267 0 16 0 16
19-00 to 20-00 4 14 14 30 55 4 31 87 56 48 343 0 31 0 31
20-00 to 21-00 3 11 18 15 38 3 37 60 53 40 278 0 13 0 13
21-00 to 22-00 8 7 17 18 15 3 11 45 32 41 197 0 15 0 15
22-00 to 23-00 3 4 3 21 8 3 11 35 30 29 147 0 8 0 8
23-00 to 24-00 3 6 6 23 6 6 20 35 45 37 187 0 21 0 21
00-00 to 01-00 10 5 0 13 27 0 0 26 50 23 154 0 0 0 0
01-00 to 02-00 10 6 2 3 2 0 0 18 33 26 100 0 0 0 0
02-00 to 03-00 4 3 4 0 2 5 7 14 31 20 90 0 9 0 9
03-00 to 04-00 2 4 6 0 0 3 13 4 53 47 132 0 21 0 21
04-00 to 05-00 0 4 5 0 5 4 35 2 37 26 118 0 46 0 46
05-00 to 06-00 0 6 12 0 28 1 41 1 34 31 154 0 41 0 41
06-00 to 07-00 0 14 14 24 32 4 22 0 48 31 189 0 32 0 32
07-00 to 08-00 0 21 20 30 35 4 15 0 47 45 217 0 13 0 13
Total 101 377 363 592 952 63 549 966 1013 934 5910 18 363 4 385
Appendix B - Page 29
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-2 From: Baipayl To:Kaliakair Date : 18.07.2016Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 59 93 30 42 11 1 15 18 59 36 364 1 29 0 30
09-00 to 10-00 55 68 15 24 13 1 26 11 33 21 267 2 16 3 21
10-00 to 11-00 97 51 15 43 15 0 8 9 17 12 267 0 13 0 13
11-00 to 12-00 79 72 20 45 22 0 10 11 27 22 308 0 14 0 14
12-00 to 13-00 115 61 14 43 29 0 16 14 33 33 358 0 10 0 10
13-00 to 14-00 142 53 43 31 29 0 8 52 32 31 421 3 14 0 17
14-00 to 15-00 107 70 15 54 36 0 6 22 53 54 417 0 10 0 10
15-00 to 16-00 93 46 17 45 32 0 6 21 31 24 315 1 8 0 9
16-00 to 17-00 84 46 14 39 22 1 7 21 27 38 299 2 9 0 11
17-00 to 18-00 106 31 8 40 19 2 7 10 18 11 252 0 8 0 8
18-00 to 19-00 83 46 12 59 29 0 9 48 34 18 338 1 7 0 8
19-00 to 20-00 90 22 11 61 17 0 3 68 28 10 310 0 7 3 10
20-00 to 21-00 82 42 4 9 4 0 4 63 35 13 256 0 3 0 3
21-00 to 22-00 22 58 4 5 3 0 2 30 45 73 242 0 3 0 3
22-00 to 23-00 19 48 2 3 2 0 4 34 44 230 386 0 2 0 2
23-00 to 24-00 19 7 1 1 2 0 2 33 36 25 126 0 2 0 2
00-00 to 01-00 7 3 1 3 2 0 0 34 14 19 83 0 2 0 2
01-00 to 02-00 7 0 1 2 1 0 1 16 14 5 47 0 0 0 0
02-00 to 03-00 7 3 0 0 3 0 0 16 15 13 57 0 0 0 0
03-00 to 04-00 11 7 1 2 1 3 0 31 24 30 110 0 0 0 0
04-00 to 05-00 12 32 1 31 10 3 2 26 20 16 153 0 2 0 2
05-00 to 06-00 27 26 2 17 12 2 2 34 25 15 162 0 3 0 3
06-00 to 07-00 35 23 6 18 38 3 1 36 26 25 211 1 1 0 2
07-00 to 08-00 71 43 7 19 40 2 2 40 53 52 329 3 1 0 4
Total 1429 951 244 636 392 18 141 698 743 826 6078 14 164 6 184
Appendix B - Page 30
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-3 From: Kashimpur To: Kaliakair Date : 18.07.2016Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 27 33 12 55 26 50 25 20 50 41 339 5 57 2 64
09-00 to 10-00 28 32 19 30 21 12 33 13 30 41 259 0 28 0 28
10-00 to 11-00 20 26 12 56 24 9 27 26 57 39 296 0 32 0 32
11-00 to 12-00 19 35 20 29 20 6 14 26 50 34 253 0 24 0 24
12-00 to 13-00 11 23 9 35 20 13 19 24 90 23 267 0 24 0 24
13-00 to 14-00 16 26 10 32 24 10 22 18 60 24 242 0 22 0 22
14-00 to 15-00 19 26 8 33 24 7 17 22 51 31 238 0 20 0 20
15-00 to 16-00 30 15 7 28 17 9 28 42 26 22 224 0 15 0 15
16-00 to 17-00 7 26 11 33 25 8 15 29 69 18 241 0 17 0 17
17-00 to 18-00 7 12 10 47 36 4 11 23 61 16 227 0 11 0 11
18-00 to 19-00 5 6 7 19 18 5 13 30 52 12 167 0 11 0 11
19-00 to 20-00 11 12 12 19 15 3 9 40 111 43 275 0 5 0 5
20-00 to 21-00 12 22 16 24 13 3 5 33 119 86 333 0 2 0 2
21-00 to 22-00 18 15 13 15 15 4 4 38 84 48 254 0 5 0 5
22-00 to 23-00 9 5 8 8 11 1 4 33 96 52 227 0 0 0 0
23-00 to 24-00 7 10 6 9 12 3 5 29 92 42 215 0 2 0 2
00-00 to 01-00 11 4 10 8 9 2 2 32 76 29 183 0 1 0 1
01-00 to 02-00 7 2 1 8 8 3 3 23 69 38 162 0 3 0 3
02-00 to 03-00 2 3 0 9 8 2 4 11 48 32 119 0 2 0 2
03-00 to 04-00 12 12 11 13 9 6 3 23 46 14 149 0 5 0 5
04-00 to 05-00 9 7 9 13 12 3 1 19 36 6 115 0 2 0 2
05-00 to 06-00 19 15 17 10 4 5 3 27 57 16 173 0 14 0 14
06-00 to 07-00 34 17 29 7 31 11 9 33 34 19 224 0 23 0 23
07-00 to 08-00 38 17 29 14 46 6 8 21 37 18 234 2 22 0 24
Total 378 401 286 554 448 185 284 635 1501 744 5416 7 347 2 356
Appendix B - Page 31
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Bailpayl Date : Date : 18.07.2016Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 13 23 10 13 28 1 19 9 15 37 168 8 19 0 27
09-00 to 10-00 16 22 11 16 35 0 12 20 18 22 172 1 13 2 16
10-00 to 11-00 24 32 16 10 20 0 8 21 30 32 193 0 11 1 12
11-00 to 12-00 17 28 7 10 22 0 12 26 27 28 177 0 4 1 5
12-00 to 13-00 22 22 11 6 19 0 4 24 28 22 158 1 10 1 12
13-00 to 14-00 29 34 14 11 35 0 8 32 24 34 221 0 10 1 11
14-00 to 15-00 8 36 15 6 32 10 9 10 27 36 189 0 8 1 9
15-00 to 16-00 7 33 3 7 29 1 11 6 24 33 154 0 9 0 9
16-00 to 17-00 3 38 27 6 37 1 14 6 39 38 209 0 9 0 9
17-00 to 18-00 4 39 10 6 23 2 10 5 45 21 165 4 8 2 14
18-00 to 19-00 0 28 11 2 20 1 9 3 43 23 140 0 14 0 14
19-00 to 20-00 0 29 8 3 11 0 10 7 49 17 134 1 9 0 10
20-00 to 21-00 3 25 2 2 8 0 3 9 64 33 149 0 5 0 5
21-00 to 22-00 4 20 1 1 7 0 3 8 74 19 137 0 0 0 0
22-00 to 23-00 4 20 3 3 6 0 1 12 74 16 139 0 0 0 0
23-00 to 24-00 0 0 9 3 5 1 2 4 29 13 66 0 0 0 0
00-00 to 01-00 4 0 7 1 3 0 1 8 16 27 67 0 0 0 0
01-00 to 02-00 0 15 3 2 8 0 2 5 31 21 87 0 0 0 0
02-00 to 03-00 2 16 2 2 13 0 3 11 24 19 92 1 1 0 2
03-00 to 04-00 0 21 13 8 7 2 4 12 24 14 105 0 7 0 7
04-00 to 05-00 1 35 25 4 8 1 1 9 27 15 126 0 5 0 5
05-00 to 06-00 0 21 26 8 9 0 0 12 10 8 94 1 2 0 3
06-00 to 07-00 0 20 23 12 18 3 5 11 10 15 117 0 15 0 15
07-00 to 08-00 0 33 26 15 23 4 7 13 17 17 155 0 26 0 26
Total 161 590 283 157 426 27 158 283 769 560 3414 17 185 9 211
Appendix B - Page 32
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-5 From: Kaliakair To: Bailpayl Date : 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 52 27 30 27 78 0 15 13 42 32 316 1 12 1 14
09-00 to 10-00 47 24 20 30 39 0 14 9 35 21 239 0 13 0 13
10-00 to 11-00 43 21 28 17 38 1 19 7 33 16 223 2 10 0 12
11-00 to 12-00 71 20 14 24 33 0 11 6 22 23 224 2 9 0 11
12-00 to 13-00 104 21 18 18 47 0 11 6 36 23 284 0 6 0 6
13-00 to 14-00 115 22 22 31 73 0 15 3 38 39 358 0 10 0 10
14-00 to 15-00 96 33 24 28 94 0 17 12 35 42 381 0 9 0 9
15-00 to 16-00 110 39 18 30 65 2 13 15 49 24 365 0 8 0 8
16-00 to 17-00 77 32 25 31 70 1 12 5 59 31 343 1 6 0 7
17-00 to 18-00 59 39 23 29 69 0 9 10 117 28 383 0 13 1 14
18-00 to 19-00 33 23 30 19 26 0 7 78 32 29 277 4 3 0 7
19-00 to 20-00 62 14 43 35 23 0 6 91 20 30 324 5 4 0 9
20-00 to 21-00 34 22 23 34 25 0 5 61 26 27 257 10 4 0 14
21-00 to 22-00 20 22 3 27 16 0 4 28 36 30 186 4 1 0 5
22-00 to 23-00 3 20 7 12 9 0 4 21 22 22 120 4 1 0 5
23-00 to 24-00 4 17 9 12 3 0 1 22 25 12 105 2 1 0 3
00-00 to 01-00 3 14 3 6 6 0 1 37 15 11 96 0 0 1 1
01-00 to 02-00 15 5 1 7 5 0 2 33 11 5 84 0 1 0 1
02-00 to 03-00 9 19 11 7 5 0 0 11 29 12 103 0 0 0 0
03-00 to 04-00 16 5 19 15 7 0 4 16 10 6 98 4 2 0 6
04-00 to 05-00 22 27 14 14 7 0 10 17 22 14 147 0 3 0 3
05-00 to 06-00 29 55 13 10 8 0 12 20 33 48 228 1 5 0 6
06-00 to 07-00 27 36 15 12 6 0 10 18 24 30 178 0 6 0 6
07-00 to 08-00 61 35 31 13 12 0 10 30 33 26 251 3 7 0 10
Total 1112 592 444 488 764 4 212 569 804 581 5570 43 134 3 180
Appendix B - Page 33
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-6 From: Kaliakair To: Kashimpur Date : 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 8 20 5 55 38 5 23 36 79 33 302 3 29 0 32
09-00 to 10-00 15 10 8 52 24 1 51 29 48 25 263 2 37 0 39
10-00 to 11-00 6 8 5 52 15 3 36 29 68 20 242 11 28 0 39
11-00 to 12-00 10 11 9 44 21 1 34 18 55 17 220 9 24 0 33
12-00 to 13-00 6 13 7 39 23 0 28 11 38 27 192 2 39 0 41
13-00 to 14-00 8 11 3 49 21 6 33 19 43 33 226 3 31 0 34
14-00 to 15-00 11 16 6 70 23 6 35 22 50 23 262 2 39 0 41
15-00 to 16-00 7 20 4 46 27 2 48 17 68 34 273 5 31 0 36
16-00 to 17-00 9 19 7 41 29 4 28 17 86 31 271 8 32 0 40
17-00 to 18-00 7 8 7 41 19 8 19 18 123 13 263 17 31 0 48
18-00 to 19-00 83 20 42 27 17 117 79 131 89 32 637 6 77 0 83
19-00 to 20-00 75 16 28 13 10 47 31 124 102 49 495 3 30 0 33
20-00 to 21-00 94 12 27 13 5 45 19 142 111 53 521 0 14 0 14
21-00 to 22-00 67 2 9 10 1 31 5 87 85 41 338 0 3 0 3
22-00 to 23-00 80 3 8 9 1 8 4 82 23 13 231 0 4 0 4
23-00 to 24-00 33 3 4 5 0 6 3 40 27 30 151 0 5 0 5
00-00 to 01-00 34 1 5 4 1 0 0 45 22 14 126 0 0 0 0
01-00 to 02-00 10 7 2 4 0 0 0 18 41 26 108 0 0 0 0
02-00 to 03-00 6 5 7 6 6 9 4 41 54 29 167 0 5 0 5
03-00 to 04-00 8 12 14 7 7 18 15 98 21 21 221 5 10 0 15
04-00 to 05-00 16 16 13 9 8 36 9 53 26 18 204 0 31 0 31
05-00 to 06-00 5 20 16 5 5 20 11 67 31 28 208 0 48 0 48
06-00 to 07-00 18 10 20 11 11 13 17 13 20 21 154 0 41 0 41
07-00 to 08-00 18 8 16 11 13 9 28 19 10 20 152 3 50 0 53
Total 634 271 272 623 325 395 560 1176 1320 651 6227 79 639 0 718
Appendix B - Page 34
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Bailpayl To: Bailpayl Date: 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 0 5 8 2 6 2 0 2 5 30 0 53 0 53
09-00 to 10-00 0 0 13 0 16 0 19 0 0 2 50 8 75 0 83
10-00 to 11-00 0 0 8 0 12 3 18 0 1 2 44 5 73 0 78
11-00 to 12-00 0 0 6 9 17 3 14 0 0 19 68 8 79 0 87
12-00 to 13-00 0 1 5 2 20 1 9 0 1 2 41 2 63 0 65
13-00 to 14-00 0 0 1 3 12 0 9 0 0 3 28 5 41 0 46
14-00 to 15-00 0 0 4 3 4 4 8 0 1 7 31 4 41 0 45
15-00 to 16-00 0 0 1 3 2 1 7 0 0 1 15 0 38 0 38
16-00 to 17-00 0 1 6 1 10 0 10 0 0 2 30 1 52 0 53
17-00 to 18-00 0 0 2 1 4 0 5 0 0 2 14 3 50 0 53
18-00 to 19-00 0 0 4 0 3 0 6 0 0 4 17 1 50 0 51
19-00 to 20-00 0 2 3 2 7 0 4 0 0 11 29 0 48 0 48
20-00 to 21-00 0 5 11 3 5 0 3 0 2 6 35 2 33 0 35
21-00 to 22-00 0 4 4 4 2 0 4 0 0 4 22 0 33 0 33
22-00 to 23-00 0 3 3 0 3 0 3 0 0 5 17 0 29 0 29
23-00 to 24-00 0 2 1 2 2 0 2 0 1 3 13 0 19 0 19
00-00 to 01-00 0 1 1 2 1 0 1 0 0 0 6 0 14 0 14
01-00 to 02-00 0 1 1 0 0 0 0 0 1 1 4 0 1 0 1
02-00 to 03-00 0 0 0 2 0 0 0 0 1 1 4 0 0 0 0
03-00 to 04-00 0 1 1 0 1 0 0 0 0 2 5 0 8 0 8
04-00 to 05-00 0 0 1 2 1 0 0 0 1 1 6 0 27 0 27
05-00 to 06-00 0 0 1 0 1 1 0 1 0 1 5 0 26 0 26
06-00 to 07-00 0 0 1 0 2 0 10 0 0 2 15 0 43 0 43
07-00 to 08-00 0 0 2 0 2 0 3 0 0 2 9 0 44 0 44
Total 0 21 85 47 129 19 137 1 11 88 538 39 940 0 979
PCU Value 3.00 3.00 3.00 1.00 1.00 0.75 0.75 3.00 3.00 3.00
Total PCU - 63 255 47 129 14 103 3 33 264 911
Appendix B - Page 35
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Kashimpur Date: 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 0 0 1 1 0 0 0 0 0 2 0 1 0 1
09-00 to 10-00 0 0 0 7 2 0 0 0 0 1 10 0 3 0 3
10-00 to 11-00 0 1 0 2 1 0 1 0 0 0 5 0 3 0 3
11-00 to 12-00 0 0 0 0 4 0 1 0 0 0 5 0 1 0 1
12-00 to 13-00 0 0 0 1 0 0 1 0 0 0 2 0 3 0 3
13-00 to 14-00 0 0 0 2 1 0 0 0 0 0 3 0 2 0 2
14-00 to 15-00 0 0 0 11 0 1 1 0 0 0 13 0 2 0 2
15-00 to 16-00 0 1 0 8 1 0 0 0 0 0 10 0 1 0 1
16-00 to 17-00 0 1 1 7 0 1 0 0 0 0 10 0 4 0 4
17-00 to 18-00 0 0 0 4 0 0 1 0 0 0 5 1 6 0 7
18-00 to 19-00 0 0 0 0 0 0 1 0 0 0 1 0 1 1 2
19-00 to 20-00 0 0 0 4 0 1 0 0 0 1 6 0 2 0 2
20-00 to 21-00 0 0 1 4 0 0 0 0 0 0 5 1 0 1 2
21-00 to 22-00 0 0 0 1 2 0 0 0 0 0 3 1 1 0 2
22-00 to 23-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
23-00 to 24-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00-00 to 01-00 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0
01-00 to 02-00 0 0 0 0 0 0 0 0 0 1 1 0 1 0 1
02-00 to 03-00 0 0 0 3 0 0 0 0 0 0 3 1 0 0 1
03-00 to 04-00 0 0 0 2 0 0 0 0 0 1 3 0 1 0 1
04-00 to 05-00 0 0 1 5 0 1 0 0 0 1 8 1 2 0 3
05-00 to 06-00 0 0 0 3 1 0 0 0 0 0 4 0 1 0 1
06-00 to 07-00 0 0 0 7 2 0 1 1 1 1 13 1 2 0 3
07-00 to 08-00 0 0 0 3 1 0 0 0 0 1 5 1 0 0 1
Total 0 3 3 76 16 4 7 1 1 7 118 7 37 2 46
PCU Value 3.00 3.00 3.00 1.00 1.00 0.75 0.75 3.00 3.00 3.00
Total PCU - 9 9 76 16 3 5 3 3 21 145
Appendix B - Page 36
Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Baipayl To: Kashimpur Date 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 23 11 28 26 7 37 6 7 7 152 12 25 0 37
09-00 to 10-00 0 34 16 27 30 0 32 18 21 22 200 0 0 0 0
10-00 to 11-00 0 41 20 26 24 0 18 21 30 27 207 0 8 0 8
11-00 to 12-00 0 44 12 23 25 0 21 23 32 17 197 5 12 0 17
12-00 to 13-00 0 38 21 15 14 0 9 19 35 15 166 5 9 0 14
13-00 to 14-00 0 32 23 20 12 0 20 17 25 20 169 7 19 0 26
14-00 to 15-00 0 34 27 21 29 0 22 12 23 27 195 0 26 0 26
15-00 to 16-00 0 34 19 26 29 0 18 14 24 29 193 0 23 0 23
16-00 to 17-00 0 30 17 13 20 2 24 14 17 15 152 1 13 0 14
17-00 to 18-00 1 40 16 12 24 0 17 19 26 21 176 0 21 0 21
18-00 to 19-00 0 40 15 18 31 0 16 12 20 22 174 15 26 0 41
19-00 to 20-00 0 37 18 38 60 0 15 12 18 22 220 0 13 0 13
20-00 to 21-00 0 23 14 8 25 0 33 14 18 13 148 0 0 0 0
21-00 to 22-00 0 20 10 14 29 0 28 21 26 16 164 0 0 0 0
22-00 to 23-00 0 22 7 14 13 0 18 7 26 10 117 0 0 0 0
23-00 to 24-00 0 14 4 3 12 0 6 15 24 19 97 0 0 0 0
00-00 to 01-00 0 21 3 9 11 0 5 18 27 12 106 0 0 0 0
01-00 to 02-00 0 8 2 1 4 0 0 15 18 3 51 0 0 0 0
02-00 to 03-00 0 3 0 0 6 0 4 18 12 0 43 0 0 0 0
03-00 to 04-00 0 1 0 0 7 0 5 16 23 3 55 0 0 0 0
04-00 to 05-00 0 2 0 7 6 0 7 13 22 2 59 0 0 0 0
05-00 to 06-00 0 2 0 4 7 0 20 19 22 4 78 0 0 0 0
06-00 to 07-00 0 10 6 21 32 18 18 22 19 12 158 0 15 0 15
07-00 to 08-00 0 29 11 20 15 2 23 12 22 11 145 0 30 0 30
Total 1 582 272 368 491 29 416 377 537 349 3422 45 240 0 285
Appendix B - Page 37
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-2 From: Baipayl To:Kaliakair Date 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 42 39 18 31 55 16 35 16 12 20 284 3 7 0 10
09-00 to 10-00 130 64 29 12 56 0 11 55 63 80 500 0 5 0 5
10-00 to 11-00 60 47 14 37 56 0 14 53 41 50 372 0 15 0 15
11-00 to 12-00 99 36 26 17 34 7 25 30 28 28 330 0 5 0 5
12-00 to 13-00 107 52 22 13 51 0 22 28 15 11 321 1 2 0 3
13-00 to 14-00 78 41 21 20 50 10 27 17 22 17 303 0 1 0 1
14-00 to 15-00 44 25 9 7 49 1 22 4 21 22 204 0 0 0 0
15-00 to 16-00 72 38 26 9 35 6 28 20 23 24 281 0 0 0 0
16-00 to 17-00 77 19 15 4 38 0 20 25 18 16 232 1 2 0 3
17-00 to 18-00 80 41 16 4 30 1 23 36 31 24 286 0 2 0 2
18-00 to 19-00 82 36 29 1 19 1 10 41 21 28 268 1 0 0 1
19-00 to 20-00 99 25 31 1 31 1 13 43 35 23 302 0 0 0 0
20-00 to 21-00 107 56 15 0 22 2 2 68 39 25 336 0 3 0 3
21-00 to 22-00 92 55 21 0 9 0 2 65 33 6 283 0 0 0 0
22-00 to 23-00 102 60 11 0 4 0 4 61 24 16 282 0 0 0 0
23-00 to 24-00 66 9 11 1 3 0 1 50 17 6 164 0 0 0 0
00-00 to 01-00 67 2 17 0 3 0 2 41 16 11 159 0 0 0 0
01-00 to 02-00 41 0 8 0 1 0 2 39 24 14 129 0 0 0 0
02-00 to 03-00 38 0 7 0 5 0 0 35 27 24 136 0 0 0 0
03-00 to 04-00 31 0 0 1 3 0 1 29 33 23 121 0 0 0 0
04-00 to 05-00 21 0 0 0 4 0 0 30 24 20 99 0 1 0 1
05-00 to 06-00 20 9 0 0 3 1 0 27 35 27 122 0 0 0 0
06-00 to 07-00 22 8 8 9 11 3 4 15 7 10 97 0 1 0 1
07-00 to 08-00 22 16 5 26 38 0 5 11 15 14 152 1 4 0 5
Total 1599 678 359 193 610 49 273 839 624 539 5763 7 48 0 55
Appendix B - Page 38
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-3 From: Kashimpur To: Kaliakair Date 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 6 19 12 19 12 5 6 20 24 17 140 2 5 0 7
09-00 to 10-00 23 30 23 21 23 19 27 37 37 26 266 1 23 0 24
10-00 to 11-00 34 23 22 17 20 18 23 40 38 21 256 0 16 0 16
11-00 to 12-00 26 25 19 23 19 16 21 39 54 31 273 0 13 0 13
12-00 to 13-00 20 13 8 21 22 25 18 42 30 19 218 0 16 0 16
13-00 to 14-00 15 17 24 22 20 17 17 41 55 27 255 0 12 0 12
14-00 to 15-00 13 17 18 18 12 18 22 37 57 44 256 0 14 0 14
15-00 to 16-00 9 18 18 18 17 12 22 39 57 37 247 0 20 0 20
16-00 to 17-00 6 26 14 20 20 17 27 31 39 22 222 0 27 0 27
17-00 to 18-00 12 26 6 31 12 11 16 36 67 15 232 0 16 0 16
18-00 to 19-00 6 34 2 32 13 14 24 19 82 9 235 0 22 0 22
19-00 to 20-00 15 19 5 23 24 16 20 25 65 16 228 0 15 0 15
20-00 to 21-00 14 21 15 22 12 27 16 33 55 12 227 0 16 0 16
21-00 to 22-00 10 31 11 16 17 15 16 27 67 23 233 0 10 0 10
22-00 to 23-00 14 28 9 18 9 20 14 35 65 24 236 0 17 0 17
23-00 to 24-00 4 23 9 14 11 19 16 37 60 22 215 0 12 0 12
00-00 to 01-00 3 29 7 19 13 25 16 35 56 11 214 0 12 0 12
01-00 to 02-00 6 16 0 0 7 5 5 34 68 17 158 0 11 0 11
02-00 to 03-00 3 0 0 0 6 0 0 32 55 13 109 0 20 0 20
03-00 to 04-00 6 0 0 0 8 0 2 41 58 10 125 0 11 0 11
04-00 to 05-00 6 0 0 0 5 0 0 48 47 7 113 0 12 0 12
05-00 to 06-00 1 2 5 5 2 0 3 31 34 11 94 1 12 0 13
06-00 to 07-00 1 22 3 25 6 12 19 14 39 7 148 12 11 0 23
07-00 to 08-00 1 11 5 29 7 17 16 22 53 14 175 6 12 0 18
Total 254 450 235 413 317 328 366 795 1262 455 4875 22 355 0 377
Appendix B - Page 39
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Baipayl Date : 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 1 3 13 16 5 10 8 7 0 8 71 1 11 0 12
09-00 to 10-00 2 15 15 32 11 12 10 13 3 9 122 4 10 0 14
10-00 to 11-00 1 5 16 21 13 11 13 9 3 14 106 7 19 0 26
11-00 to 12-00 0 15 16 12 16 13 8 17 2 17 116 1 13 0 14
12-00 to 13-00 0 4 19 13 10 9 4 15 0 15 89 2 15 0 17
13-00 to 14-00 0 7 16 8 11 11 5 15 8 15 96 3 13 0 16
14-00 to 15-00 0 14 15 14 10 14 3 8 5 15 98 3 10 0 13
15-00 to 16-00 0 17 15 25 15 13 10 13 3 13 124 8 21 0 29
16-00 to 17-00 0 7 15 16 19 11 10 7 3 20 108 2 11 0 13
17-00 to 18-00 0 6 18 23 22 15 11 10 0 20 125 11 16 0 27
18-00 to 19-00 0 7 12 22 29 19 15 9 3 15 131 2 21 0 23
19-00 to 20-00 0 5 7 23 23 13 7 4 0 10 92 5 25 0 30
20-00 to 21-00 0 14 11 17 17 15 9 5 4 9 101 2 14 0 16
21-00 to 22-00 0 13 16 16 23 17 6 9 9 13 122 2 13 0 15
22-00 to 23-00 0 9 8 22 13 12 8 16 6 18 112 0 3 0 3
23-00 to 24-00 0 5 9 16 17 10 3 11 12 8 91 0 12 0 12
00-00 to 01-00 0 4 10 18 18 19 5 12 12 5 103 1 14 0 15
01-00 to 02-00 0 5 3 15 13 10 1 10 7 4 68 0 17 0 17
02-00 to 03-00 0 3 4 0 17 11 2 4 8 3 52 0 14 0 14
03-00 to 04-00 0 2 3 2 15 12 2 8 7 4 55 0 15 0 15
04-00 to 05-00 0 2 2 0 0 12 1 13 6 4 40 3 8 0 11
05-00 to 06-00 0 2 2 18 11 16 4 9 3 4 69 11 15 0 26
06-00 to 07-00 0 7 6 16 9 12 7 4 1 4 66 8 17 0 25
07-00 to 08-00 0 9 16 19 19 19 13 6 2 8 111 5 20 0 25
Total 4 180 267 384 356 316 165 234 107 255 2268 81 347 0 428
Appendix B - Page 40
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-5 From: Kaliakair To: Baipayl Date : 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 48 23 23 8 21 7 18 22 22 26 218 0 5 0 5
09-00 to 10-00 61 33 18 14 42 0 7 29 18 35 257 0 2 0 2
10-00 to 11-00 41 35 31 15 37 4 10 42 16 28 259 0 2 0 2
11-00 to 12-00 44 23 33 10 39 4 11 21 14 25 224 1 3 0 4
12-00 to 13-00 64 29 16 7 22 3 6 25 12 15 199 0 3 0 3
13-00 to 14-00 70 16 19 5 24 2 7 27 16 15 201 0 3 0 3
14-00 to 15-00 53 32 22 5 26 1 4 24 19 34 220 0 1 0 1
15-00 to 16-00 159 26 23 13 34 1 14 23 23 24 340 0 2 0 2
16-00 to 17-00 175 28 24 17 33 2 12 34 25 20 370 0 0 0 0
17-00 to 18-00 86 47 24 27 40 4 11 35 16 24 314 0 1 0 1
18-00 to 19-00 69 50 25 36 60 2 8 34 44 20 348 0 0 0 0
19-00 to 20-00 39 36 15 31 46 1 12 57 43 19 299 0 2 0 2
20-00 to 21-00 20 14 16 20 47 1 8 35 38 16 215 0 1 0 1
21-00 to 22-00 29 20 17 23 45 3 5 60 64 39 305 0 0 0 0
22-00 to 23-00 57 14 19 35 46 0 6 55 50 31 313 0 1 0 1
23-00 to 24-00 27 22 20 16 36 2 2 60 60 47 292 0 0 0 0
00-00 to 01-00 39 21 28 7 11 2 1 50 55 35 249 0 0 0 0
01-00 to 02-00 64 24 21 4 12 2 2 40 42 28 239 0 0 0 0
02-00 to 03-00 63 13 19 0 2 1 2 67 84 23 274 0 0 0 0
03-00 to 04-00 53 16 21 0 3 0 0 73 74 23 263 0 0 0 0
04-00 to 05-00 58 25 22 0 1 0 2 57 69 23 257 0 1 0 1
05-00 to 06-00 53 30 19 0 6 3 7 63 56 26 263 0 6 0 6
06-00 to 07-00 112 23 24 9 18 8 10 56 45 53 358 0 3 0 3
07-00 to 08-00 110 49 43 32 54 2 16 39 54 50 449 0 6 0 6
Total 1594 649 542 334 705 55 181 1028 959 679 6726 1 42 0 43
Appendix B - Page 41
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-6 From: Kaliakair To: Kashimpur Date : 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 30 31 16 15 20 16 16 36 45 20 245 8 16 0 24
09-00 to 10-00 23 36 26 26 15 41 26 61 50 40 344 9 22 0 31
10-00 to 11-00 20 29 27 20 14 18 16 49 29 28 250 5 10 0 15
11-00 to 12-00 57 27 23 23 22 36 26 43 36 27 320 9 8 0 17
12-00 to 13-00 63 27 25 27 26 21 31 42 31 24 317 9 20 1 30
13-00 to 14-00 40 18 20 14 13 17 16 33 39 23 233 6 9 0 15
14-00 to 15-00 11 28 26 11 18 27 23 38 46 24 252 7 13 0 20
15-00 to 16-00 21 22 29 15 15 21 18 54 33 19 247 6 20 0 26
16-00 to 17-00 42 39 36 17 22 25 21 49 52 56 359 7 10 0 17
17-00 to 18-00 27 26 30 25 26 25 34 48 59 34 334 17 19 0 36
18-00 to 19-00 17 37 27 14 29 17 21 48 56 39 305 7 16 0 23
19-00 to 20-00 32 25 32 15 31 22 25 59 49 34 324 4 8 0 12
20-00 to 21-00 25 25 14 13 18 15 12 57 36 35 250 3 18 0 21
21-00 to 22-00 30 19 18 18 20 23 20 61 37 24 270 4 7 0 11
22-00 to 23-00 15 17 18 20 19 24 21 67 33 26 260 0 11 0 11
23-00 to 24-00 19 32 9 0 0 10 4 50 30 19 173 0 9 0 9
00-00 to 01-00 46 25 28 29 9 27 4 73 55 29 325 3 9 0 12
01-00 to 02-00 24 7 19 17 10 2 2 45 42 23 191 0 2 0 2
02-00 to 03-00 9 3 8 7 5 3 4 25 24 12 100 0 1 0 1
03-00 to 04-00 6 3 7 5 5 3 6 45 41 17 138 0 0 0 0
04-00 to 05-00 25 16 14 16 14 7 10 43 38 17 200 5 4 0 9
05-00 to 06-00 19 24 18 21 15 13 11 46 39 25 231 5 8 0 13
06-00 to 07-00 65 28 45 22 18 24 21 56 45 27 351 6 18 0 24
07-00 to 08-00 35 25 35 18 18 19 15 41 38 28 272 4 14 0 18
Total 701 569 550 408 402 456 403 1169 983 650 6291 124 272 1 397
Appendix B - Page 42
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Baipayl To: Baipayl Dated 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 0 3 0 4 16 4 0 0 0 27 1 12 0 13
09-00 to 10-00 0 0 0 0 7 7 2 0 0 0 16 0 8 0 8
10-00 to 11-00 0 0 2 0 1 0 0 0 0 0 3 0 0 0 0
11-00 to 12-00 0 0 0 0 3 2 8 0 0 0 13 0 12 0 12
12-00 to 13-00 0 0 0 0 6 0 3 0 0 0 9 0 17 0 17
13-00 to 14-00 0 0 0 0 4 0 3 0 0 0 7 0 14 0 14
14-00 to 15-00 0 0 0 0 5 0 0 0 0 0 5 0 15 0 15
15-00 to 16-00 0 0 1 1 3 0 0 0 0 0 5 0 10 0 10
16-00 to 17-00 0 0 4 1 5 1 1 0 0 2 14 0 36 0 36
17-00 to 18-00 0 0 2 0 6 0 5 0 0 0 13 0 17 0 17
18-00 to 19-00 0 0 9 0 10 0 4 0 0 0 23 1 11 0 12
19-00 to 20-00 0 0 0 0 4 0 10 0 0 0 14 1 26 0 27
20-00 to 21-00 0 0 3 0 7 0 13 0 0 0 23 7 31 0 38
21-00 to 22-00 0 0 3 0 7 0 8 0 0 0 18 3 15 0 18
22-00 to 23-00 0 0 6 0 8 0 5 0 0 0 19 1 11 0 12
23-00 to 24-00 0 0 3 0 4 0 4 0 0 0 11 4 4 0 8
00-00 to 01-00 0 0 4 0 6 0 7 0 0 1 18 4 2 0 6
01-00 to 02-00 0 0 3 0 5 0 7 0 0 0 15 5 7 0 12
02-00 to 03-00 0 0 5 0 8 0 6 0 0 0 19 8 9 0 17
03-00 to 04-00 0 0 0 0 1 0 1 0 0 0 2 5 12 0 17
04-00 to 05-00 0 0 1 0 3 0 5 0 0 0 9 2 10 0 12
05-00 to 06-00 0 0 1 0 6 0 6 0 0 0 13 4 9 0 13
06-00 to 07-00 0 0 0 5 0 5 0 10 0 0 20 9 20 0 29
07-00 to 08-00 0 0 0 8 0 0 0 8 0 0 16 7 15 0 22
Total 0 0 50 15 113 31 102 18 0 3 332 62 323 0 385
Appendix B - Page 43
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Kashimpur Dated 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 0 0 9 1 2 0 0 1 3 16 1 4 0 5
09-00 to 10-00 0 1 1 5 0 4 1 0 1 0 13 2 6 0 8
10-00 to 11-00 0 0 0 4 0 0 2 0 0 0 6 4 4 0 8
11-00 to 12-00 0 1 0 6 0 0 2 1 0 0 10 1 4 0 5
12-00 to 13-00 0 0 2 1 0 0 3 0 0 1 7 1 5 0 6
13-00 to 14-00 0 1 0 5 0 3 0 0 0 2 11 2 2 0 4
14-00 to 15-00 0 0 3 1 0 3 3 3 0 0 13 2 3 0 5
15-00 to 16-00 0 0 2 1 3 2 1 1 0 0 10 4 3 0 7
16-00 to 17-00 0 0 0 3 1 1 5 0 0 0 10 0 6 0 6
17-00 to 18-00 0 1 0 4 1 4 2 0 0 0 12 2 9 0 11
18-00 to 19-00 0 2 0 4 0 2 4 0 0 0 12 0 7 0 7
19-00 to 20-00 0 0 1 5 0 2 6 0 0 0 14 1 4 0 5
20-00 to 21-00 0 0 1 6 1 0 1 0 0 3 12 1 3 0 4
21-00 to 22-00 0 1 1 2 1 4 5 0 0 3 17 5 3 0 8
22-00 to 23-00 0 3 3 0 2 3 6 0 0 0 17 3 5 0 8
23-00 to 24-00 0 3 2 2 1 3 4 2 0 5 22 1 3 0 4
00-00 to 01-00 0 1 4 1 4 1 3 0 0 6 20 0 4 0 4
01-00 to 02-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
02-00 to 03-00 0 3 2 1 1 4 2 0 0 3 16 1 0 0 1
03-00 to 04-00 1 1 2 1 2 5 1 0 2 3 18 2 0 0 2
04-00 to 05-00 2 0 3 4 0 1 2 0 0 4 16 1 0 0 1
05-00 to 06-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
06-00 to 07-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
07-00 to 08-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 3 18 27 65 18 44 53 7 4 33 272 34 75 0 109
Appendix B - Page 44