0% found this document useful (0 votes)
40 views

All Turning Movement Counts - Weekday and Weekend

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

All Turning Movement Counts - Weekday and Weekend

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 44

Form TMC-3 Page No.

1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: E P Z Date: 20.07.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 27 25 15 6 24 13 8 35 21 22 196 0 43 0 43
09-00 to 10-00 19 27 24 16 29 16 39 9 16 16 211 0 91 0 91
10-00 to 11-00 31 23 9 7 33 9 31 11 19 19 192 0 77 0 77
11-00 to 12-00 46 24 30 6 67 13 21 33 32 50 322 0 89 0 89
12-00 to 13-00 35 21 35 11 86 5 19 56 13 61 342 0 64 0 64
13-00 to 14-00 39 22 20 4 58 3 34 53 29 43 305 0 52 0 52
14-00 to 15-00 58 8 52 10 35 0 38 38 10 17 266 4 87 1 92
15-00 to 16-00 49 15 35 9 30 3 15 56 8 26 246 2 34 0 36
16-00 to 17-00 29 17 23 10 30 4 11 51 20 28 223 0 22 0 22
17-00 to 18-00 27 28 21 8 22 9 21 59 25 34 254 1 46 0 47
18-00 to 19-00 31 15 22 7 23 12 31 47 28 28 244 0 49 0 49
19-00 to 20-00 16 4 10 4 7 6 18 20 10 14 109 0 27 0 27
20-00 to 21-00 35 8 19 4 11 3 14 49 8 23 174 0 21 0 21
21-00 to 22-00 48 0 22 4 5 2 20 73 8 23 205 0 18 0 18
22-00 to 23-00 13 2 24 1 3 4 7 48 6 28 136 0 8 0 8
23-00 to 24-00 39 2 9 4 6 3 6 83 5 14 171 0 5 0 5
00-00 to 01-00 12 1 13 1 4 6 7 85 5 39 173 0 8 0 8
01-00 to 02-00 40 1 15 1 2 6 1 92 6 36 200 0 2 0 2
02-00 to 03-00 57 1 15 1 1 7 10 68 5 26 191 0 11 0 11
03-00 to 04-00 45 1 1 1 2 3 3 80 5 35 176 0 1 0 1
04-00 to 05-00 61 1 25 4 6 7 6 87 11 30 238 0 7 0 7
05-00 to 06-00 48 3 46 4 8 8 8 62 11 8 206 0 10 0 10
06-00 to 07-00 45 0 56 7 13 15 11 65 6 12 230 0 21 0 21
07-00 to 08-00 40 32 25 17 40 13 22 75 11 19 294 5 37 0 42
Total 890 281 566 147 545 170 401 1335 318 651 5304 12 830 1 843

Appendix B - Page 1
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-2 From: Abdullahpur To: Nabinagar Date: 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 24 14 25 46 6 15 9 9 4 22 174 0 41 0 41
09-00 to 10-00 15 20 37 8 17 17 6 5 3 8 136 0 43 0 43
10-00 to 11-00 5 9 29 7 11 6 14 0 5 12 98 0 32 0 32
11-00 to 12-00 7 15 21 13 20 6 19 2 9 13 125 0 45 0 45
12-00 to 13-00 6 11 31 9 23 21 20 2 10 5 138 0 37 0 37
13-00 to 14-00 11 6 29 12 11 10 29 14 4 5 131 0 57 0 57
14-00 to 15-00 5 9 30 7 6 9 17 7 7 9 106 0 24 0 24
15-00 to 16-00 1 9 25 9 19 20 17 6 11 15 132 0 24 0 24
16-00 to 17-00 3 0 38 10 13 14 25 3 16 11 133 0 35 0 35
17-00 to 18-00 0 14 37 17 10 10 12 2 11 4 117 0 23 0 23
18-00 to 19-00 3 12 29 13 8 17 18 0 9 15 124 1 18 0 19
19-00 to 20-00 2 15 19 11 12 19 15 0 7 7 107 4 14 0 18
20-00 to 21-00 8 13 24 16 9 25 13 7 10 11 136 8 23 0 31
21-00 to 22-00 38 22 40 16 15 15 10 9 17 11 193 1 18 0 19
22-00 to 23-00 11 21 22 10 5 27 12 13 15 7 143 0 26 0 26
23-00 to 24-00 11 17 7 3 1 12 10 15 14 10 100 0 20 0 20
00-00 to 01-00 16 8 10 1 2 14 8 21 11 9 100 0 28 0 28
01-00 to 02-00 12 6 6 1 3 13 1 21 38 23 124 0 19 0 19
02-00 to 03-00 10 6 4 2 3 5 0 21 41 26 118 0 8 0 8
03-00 to 04-00 11 5 6 2 5 4 1 21 27 22 104 0 4 0 4
04-00 to 05-00 13 7 16 11 10 7 0 13 26 19 122 0 25 0 25
05-00 to 06-00 10 12 24 5 0 14 4 10 22 18 119 0 26 0 26
06-00 to 07-00 13 12 31 13 5 14 4 5 8 13 118 0 25 0 25
07-00 to 08-00 11 2 26 1 7 26 14 3 2 4 96 0 23 0 23
Total 246 265 566 243 221 340 278 209 327 299 2994 14 638 0 652

Appendix B - Page 2
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-3 From: E P Z To: Nabinagar Date 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 64 55 10 40 41 0 9 8 24 15 266 16 36 0 52
09-00 to 10-00 20 45 18 37 57 2 11 7 39 27 263 5 39 0 44
10-00 to 11-00 19 32 22 32 62 1 13 13 48 20 262 0 34 0 34
11-00 to 12-00 15 66 16 51 53 1 23 2 104 28 359 2 45 0 47
12-00 to 13-00 8 59 26 46 60 0 25 1 65 24 314 2 41 0 43
13-00 to 14-00 8 32 21 47 57 1 16 0 69 29 280 0 50 0 50
14-00 to 15-00 30 61 20 69 64 3 39 2 54 21 363 2 59 1 62
15-00 to 16-00 72 59 37 92 75 0 39 4 57 46 481 1 54 2 57
16-00 to 17-00 43 43 46 91 100 0 26 1 38 29 417 5 58 0 63
17-00 to 18-00 73 49 83 112 143 0 31 5 64 47 607 10 53 0 63
18-00 to 19-00 77 90 78 83 121 0 54 3 79 55 640 22 55 0 77
19-00 to 20-00 56 73 74 80 154 6 35 2 76 51 607 25 52 0 77
20-00 to 21-00 36 76 14 30 73 4 43 17 109 62 464 40 61 0 101
21-00 to 22-00 8 51 8 39 63 4 38 1 116 47 375 12 57 0 69
22-00 to 23-00 11 63 32 16 29 1 12 5 123 39 331 16 23 0 39
23-00 to 24-00 21 22 11 20 25 1 9 19 111 41 280 2 18 0 20
00-00 to 01-00 14 13 4 9 15 0 3 12 85 39 194 1 7 0 8
01-00 to 02-00 16 12 0 4 9 1 3 2 74 43 164 0 11 0 11
02-00 to 03-00 18 10 0 8 12 0 3 8 93 50 202 0 6 0 6
03-00 to 04-00 17 1 1 11 11 0 3 0 80 26 150 2 10 0 12
04-00 to 05-00 24 1 5 8 4 9 3 1 54 28 137 1 22 0 23
05-00 to 06-00 50 26 17 7 7 20 8 0 20 13 168 1 67 0 68
06-00 to 07-00 38 123 23 24 26 18 15 2 19 22 310 7 98 0 105
07-00 to 08-00 29 149 13 38 31 12 25 11 25 20 353 4 58 0 62
Total 767 1211 579 994 1292 84 486 126 1626 822 7987 176 1014 3 1193

Appendix B - Page 3
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-4 From: E P Z To: Abdullahpur Date 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 48 24 14 17 17 0 13 9 26 29 197 15 55 0 70
09-00 to 10-00 28 25 15 10 25 0 15 14 23 20 175 11 80 0 91
10-00 to 11-00 20 27 9 18 24 2 24 7 33 27 191 7 117 0 124
11-00 to 12-00 29 29 14 22 30 0 40 15 38 39 256 10 125 0 135
12-00 to 13-00 31 26 23 21 31 0 36 10 31 54 263 11 97 0 108
13-00 to 14-00 30 34 28 29 39 2 40 12 31 41 286 21 95 0 116
14-00 to 15-00 27 19 10 19 51 0 45 17 26 40 254 17 72 0 89
15-00 to 16-00 68 27 25 36 82 3 36 12 35 65 389 9 77 0 86
16-00 to 17-00 47 27 20 31 56 1 39 12 50 49 332 12 84 0 96
17-00 to 18-00 31 29 23 28 55 2 40 13 36 39 296 29 81 0 110
18-00 to 19-00 30 31 26 30 51 1 46 24 47 48 334 55 68 0 123
19-00 to 20-00 32 23 19 17 39 1 39 28 62 51 311 51 59 0 110
20-00 to 21-00 37 23 30 17 38 0 27 28 103 45 348 73 73 0 146
21-00 to 22-00 15 22 10 15 27 3 25 21 144 62 344 23 50 0 73
22-00 to 23-00 22 15 14 16 6 1 19 12 132 72 309 13 55 0 68
23-00 to 24-00 19 4 11 5 17 5 18 17 89 28 213 3 40 0 43
00-00 to 01-00 14 2 4 5 8 0 4 10 71 56 174 2 29 0 31
01-00 to 02-00 8 2 6 4 2 0 0 33 65 35 155 1 24 0 25
02-00 to 03-00 20 2 7 2 2 0 0 21 45 24 123 1 18 0 19
03-00 to 04-00 22 1 5 5 4 0 0 16 48 24 125 2 109 0 111
04-00 to 05-00 32 6 3 3 11 3 2 15 21 22 118 3 31 0 34
05-00 to 06-00 102 14 10 20 15 3 3 16 14 19 216 4 52 0 56
06-00 to 07-00 38 25 10 25 7 5 3 11 20 15 159 12 44 0 56
07-00 to 08-00 44 60 17 26 26 3 17 15 20 25 253 0 42 0 42
Total 794 497 353 421 663 35 531 388 1210 929 5821 385 1577 0 1962

Appendix B - Page 4
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Abdullahpur Dated 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 1 9 23 6 10 1 19 8 16 13 106 0 60 9 69
09-00 to 10-00 0 2 33 17 6 1 15 6 11 19 110 2 96 1 99
10-00 to 11-00 0 1 21 11 1 0 25 7 5 16 87 5 97 0 102
11-00 to 12-00 0 0 28 15 4 0 15 10 14 15 101 0 38 1 39
12-00 to 13-00 0 9 35 26 7 0 22 11 13 14 137 1 37 1 39
13-00 to 14-00 5 10 34 2 9 12 24 12 17 21 146 0 29 1 30
14-00 to 15-00 4 4 21 7 10 10 17 10 8 16 107 0 17 0 17
15-00 to 16-00 6 6 29 20 12 3 19 16 16 22 149 0 20 1 21
16-00 to 17-00 6 3 53 32 19 3 27 37 8 24 212 0 49 0 49
17-00 to 18-00 5 5 31 51 26 2 34 25 9 8 196 2 56 1 59
18-00 to 19-00 5 5 42 36 28 4 27 33 13 16 209 4 23 0 27
19-00 to 20-00 5 3 32 40 21 4 12 22 5 20 164 5 37 0 42
20-00 to 21-00 5 1 42 48 36 4 28 20 0 12 196 2 38 0 40
21-00 to 22-00 3 1 45 48 20 2 12 25 4 11 171 0 30 0 30
22-00 to 23-00 6 1 48 28 11 1 11 32 2 9 149 0 26 1 27
23-00 to 24-00 0 0 20 56 26 2 6 35 2 8 155 0 16 0 16
00-00 to 01-00 3 0 20 29 23 2 4 36 7 11 135 0 19 0 19
01-00 to 02-00 5 1 12 23 5 1 7 49 5 6 114 0 14 0 14
02-00 to 03-00 0 1 12 20 4 2 3 41 9 11 103 0 10 0 10
03-00 to 04-00 3 1 17 31 2 1 6 29 6 14 110 0 8 0 8
04-00 to 05-00 0 2 13 52 2 5 3 30 5 16 128 0 9 0 9
05-00 to 06-00 1 1 10 45 5 2 1 31 4 13 113 0 17 0 17
06-00 to 07-00 0 4 11 33 16 11 8 23 2 4 112 4 42 0 46
07-00 to 08-00 3 11 27 17 9 7 17 22 4 5 122 2 98 0 100
Total 66 81 659 693 312 80 362 570 185 324 3332 27 886 16 929

Appendix B - Page 5
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-6 From: Nabinagar To: E P Z Dated 20.7.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 80 121 40 28 41 0 35 67 9 29 450 23 40 0 63
09-00 to 10-00 53 76 13 31 45 0 37 23 64 57 399 5 47 0 52
10-00 to 11-00 38 62 11 29 38 0 45 47 15 43 328 1 58 0 59
11-00 to 12-00 39 118 29 32 50 0 46 33 30 57 434 10 61 0 71
12-00 to 13-00 36 90 22 34 41 0 48 16 58 51 396 2 62 1 65
13-00 to 14-00 36 78 25 22 68 5 34 23 34 32 357 0 59 0 59
14-00 to 15-00 39 85 20 19 56 10 75 0 59 38 401 2 88 0 90
15-00 to 16-00 31 113 19 22 44 0 84 16 68 39 436 5 87 1 93
16-00 to 17-00 82 122 30 23 37 0 76 52 58 57 537 3 67 0 70
17-00 to 18-00 69 111 30 26 42 0 56 33 46 69 482 15 73 2 90
18-00 to 19-00 68 107 25 29 53 0 66 32 41 62 483 27 80 1 108
19-00 to 20-00 39 108 16 39 53 0 62 8 34 61 420 49 56 0 105
20-00 to 21-00 53 64 13 23 63 35 57 2 33 52 395 5 34 0 39
21-00 to 22-00 24 87 3 33 38 2 8 0 42 50 287 0 56 0 56
22-00 to 23-00 48 27 31 29 15 3 55 86 56 37 387 1 47 0 48
23-00 to 24-00 30 20 29 16 35 2 45 49 55 31 312 0 31 0 31
00-00 to 01-00 32 32 16 2 8 1 28 45 45 51 260 0 33 0 33
01-00 to 02-00 35 36 17 0 0 10 11 53 56 29 247 0 22 0 22
02-00 to 03-00 30 17 16 3 5 0 6 42 45 23 187 0 8 0 8
03-00 to 04-00 87 16 5 3 16 0 9 43 51 32 262 0 3 0 3
04-00 to 05-00 14 18 7 7 19 0 16 48 47 29 205 0 3 0 3
05-00 to 06-00 51 20 26 17 12 0 26 40 42 29 263 0 8 0 8
06-00 to 07-00 20 79 10 33 11 57 39 23 50 22 344 12 46 0 58
07-00 to 08-00 10 102 23 31 32 53 54 12 56 29 402 52 54 0 106
Total 1044 1709 476 531 822 178 1018 793 1094 1009 8674 212 1123 5 1340

Appendix B - Page 6
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: Abdullahpur Date: 20.07.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 3 19 34 13 41 12 0 3 16 141 8 67 0 75
09-00 to 10-00 0 1 95 21 10 34 14 0 0 13 188 20 78 0 98
10-00 to 11-00 0 2 8 20 9 27 11 0 0 15 92 14 57 0 71
11-00 to 12-00 0 0 6 16 7 18 8 0 0 6 61 6 57 0 63
12-00 to 13-00 0 0 12 20 7 21 7 0 0 5 72 2 52 0 54
13-00 to 14-00 0 0 11 39 5 22 10 0 0 2 89 3 80 0 83
14-00 to 15-00 0 0 5 26 3 17 3 0 0 4 58 4 75 0 79
15-00 to 16-00 0 0 3 21 1 10 3 0 0 3 41 1 69 0 70
16-00 to 17-00 0 0 0 31 3 20 3 0 0 5 62 2 79 0 81
17-00 to 18-00 0 0 4 38 3 27 7 0 0 2 81 3 76 0 79
18-00 to 19-00 0 0 0 30 3 15 3 0 0 3 54 3 59 0 62
19-00 to 20-00 0 0 4 34 1 16 3 0 0 5 63 1 73 0 74
20-00 to 21-00 0 0 8 34 5 12 0 0 0 3 62 0 68 0 68
21-00 to 22-00 0 0 6 38 9 6 0 0 0 3 62 0 47 0 47
22-00 to 23-00 0 1 7 17 2 3 0 0 5 5 40 0 31 0 31
23-00 to 24-00 0 0 2 12 2 4 0 0 2 7 29 0 21 0 21
00-00 to 01-00 0 0 0 4 1 3 0 0 0 5 13 0 10 0 10
01-00 to 02-00 0 0 0 4 1 3 0 0 5 2 15 0 9 0 9
02-00 to 03-00 0 0 0 4 1 1 0 0 7 1 14 0 7 0 7
03-00 to 04-00 0 0 1 1 0 3 0 0 5 4 14 0 5 0 5
04-00 to 05-00 0 0 0 2 0 4 0 0 0 2 8 0 8 0 8
05-00 to 06-00 0 0 0 14 0 2 0 0 0 3 19 0 13 0 13
06-00 to 07-00 0 0 0 77 0 5 0 0 0 2 84 0 96 0 96
07-00 to 08-00 0 0 0 139 0 5 0 0 0 0 144 0 158 0 158
Total 0 7 191 676 86 319 84 0 27 116 1506 67 1295 0 1362
PCU Value 3 3 3 1 1 0.75 0.75 3 3 3
0 21 573 676 86 239.25 63 0 81 348 2,087

Appendix B - Page 7
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Nabinagar Dated 20.07.2016 Day: Wednesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 1 0 2 2 0 3 0 0 5 13 0 10 0 10
09-00 to 10-00 0 3 0 8 4 0 2 0 9 5 31 1 17 0 18
10-00 to 11-00 0 0 0 11 6 0 8 0 13 14 52 0 19 0 19
11-00 to 12-00 0 0 4 8 3 0 4 0 3 5 27 2 13 0 15
12-00 to 13-00 0 0 1 2 1 0 1 0 2 5 12 6 6 2 14
13-00 to 14-00 0 0 5 3 8 0 2 0 8 4 30 2 10 1 13
14-00 to 15-00 0 0 4 8 11 0 6 0 0 5 34 8 20 0 28
15-00 to 16-00 0 0 3 8 8 0 7 0 0 6 32 4 17 0 21
16-00 to 17-00 0 0 6 5 5 0 5 0 0 4 25 0 9 0 9
17-00 to 18-00 0 2 5 1 1 0 6 0 0 0 15 4 7 2 13
18-00 to 19-00 0 0 0 4 2 0 4 0 0 7 17 1 9 0 10
19-00 to 20-00 0 0 0 11 0 0 9 0 0 14 34 8 2 0 10
20-00 to 21-00 0 0 5 0 3 0 1 0 0 3 12 6 6 0 12
21-00 to 22-00 0 0 4 0 3 0 4 0 0 3 14 1 4 0 5
22-00 to 23-00 0 0 3 0 0 0 2 0 0 0 5 1 2 0 3
23-00 to 24-00 0 0 3 0 0 0 2 0 0 0 5 11 2 0 13
00-00 to 01-00 0 0 3 0 0 0 3 0 0 0 6 2 1 0 3
01-00 to 02-00 0 0 3 0 0 0 0 0 3 0 6 0 2 0 2
02-00 to 03-00 2 0 0 0 0 0 3 0 0 0 5 0 3 0 3
03-00 to 04-00 0 0 1 0 0 2 0 0 0 0 3 0 1 0 1
04-00 to 05-00 0 0 0 0 1 0 1 0 0 0 2 1 0 0 1
05-00 to 06-00 0 0 1 0 2 0 2 0 0 3 8 0 3 0 3
06-00 to 07-00 0 2 3 0 0 2 1 0 1 1 10 0 1 0 1
07-00 to 08-00 0 2 2 0 0 0 1 0 0 1 6 3 3 0 6
Total 2 10 56 71 60 4 77 0 39 85 404 61 167 5 233
PCU Value 3 3 3 1 1 0.75 0.75 3 3 3
6 30 168 71 60 3 57.75 0 117 255 768

Appendix B - Page 8
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: E P Z Date: 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 52 78 67 79 60 60 35 15 42 55 543 27 49 0 76
09-00 to 10-00 31 74 55 35 47 39 33 16 15 47 392 21 38 0 59
10-00 to 11-00 21 19 14 45 40 37 31 19 19 14 259 25 35 0 60
11-00 to 12-00 30 34 24 41 47 39 40 18 23 14 310 27 30 1 58
12-00 to 13-00 14 31 12 60 67 45 44 15 11 20 319 34 43 0 77
13-00 to 14-00 56 60 24 54 50 39 30 24 32 32 401 21 41 1 63
14-00 to 15-00 40 34 28 51 42 54 46 17 14 23 349 14 50 0 64
15-00 to 16-00 38 15 4 42 31 36 35 29 17 11 258 28 44 0 72
16-00 to 17-00 19 28 11 47 29 35 12 16 17 25 239 25 40 0 65
17-00 to 18-00 47 64 25 49 54 41 40 64 26 64 474 23 38 0 61
18-00 to 19-00 25 34 21 63 50 36 37 28 31 30 355 25 41 0 66
19-00 to 20-00 33 27 17 47 39 32 31 26 31 39 322 19 29 0 48
20-00 to 21-00 22 31 6 15 22 25 17 29 28 37 232 1 17 0 18
21-00 to 22-00 30 30 16 32 33 27 12 52 26 20 278 8 9 0 17
22-00 to 23-00 30 35 20 22 33 25 27 48 46 49 335 8 13 0 21
23-00 to 24-00 51 27 19 29 20 24 20 49 46 21 306 4 12 0 16
00-00 to 01-00 34 13 15 18 15 21 17 54 42 21 250 4 20 0 24
01-00 to 02-00 18 5 12 18 17 11 10 49 26 24 190 1 16 0 17
02-00 to 03-00 26 11 13 11 17 10 8 49 35 43 223 3 6 0 9
03-00 to 04-00 34 3 15 13 12 4 5 46 48 26 206 0 6 0 6
04-00 to 05-00 23 1 15 12 14 3 9 40 44 43 204 0 1 0 1
05-00 to 06-00 19 20 22 12 20 15 7 43 27 24 209 6 7 0 13
06-00 to 07-00 22 30 25 27 32 24 22 29 29 24 264 15 35 0 50
07-00 to 08-00 19 31 31 48 37 26 25 30 23 24 294 23 34 0 57
Total 734 735 511 870 828 708 593 805 698 730 7212 362 654 2 1018

Appendix B - Page 9
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-2 From: Abdullahpur To: Nabinagar Date: 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 37 56 43 32 13 13 8 40 41 45 328 13 15 0 28
09-00 to 10-00 21 39 32 33 10 14 10 20 19 44 242 10 27 0 37
10-00 to 11-00 9 23 26 21 4 6 1 5 15 20 130 4 86 0 90
11-00 to 12-00 5 34 33 34 0 8 0 11 11 19 155 15 150 0 165
12-00 to 13-00 9 38 44 19 0 6 12 9 8 19 164 9 135 0 144
13-00 to 14-00 10 45 52 37 4 10 10 7 13 18 206 0 150 0 150
14-00 to 15-00 10 43 47 14 2 3 12 10 8 17 166 7 145 0 152
15-00 to 16-00 27 51 29 34 17 19 17 19 23 23 259 27 19 1 47
16-00 to 17-00 16 47 45 15 4 2 8 13 17 20 187 1 160 0 161
17-00 to 18-00 15 38 52 23 3 3 6 8 20 18 186 2 146 0 148
18-00 to 19-00 11 39 51 14 2 3 7 13 12 24 176 0 112 1 113
19-00 to 20-00 15 42 50 11 1 1 6 9 11 31 177 0 78 0 78
20-00 to 21-00 22 46 49 22 23 8 10 12 20 25 237 4 27 0 31
21-00 to 22-00 32 42 46 9 5 7 6 21 14 29 211 2 20 0 22
22-00 to 23-00 28 39 46 13 6 6 6 20 18 26 208 3 32 0 35
23-00 to 24-00 25 35 35 22 17 8 4 20 26 34 226 3 21 0 24
00-00 to 01-00 18 3 18 10 5 6 5 36 34 34 169 7 8 0 15
01-00 to 02-00 21 1 31 13 11 5 5 33 42 34 196 0 8 0 8
02-00 to 03-00 27 6 27 7 4 5 4 35 40 36 191 0 7 0 7
03-00 to 04-00 28 3 30 6 3 3 3 30 37 35 178 0 8 0 8
04-00 to 05-00 26 2 31 7 4 11 3 26 32 35 177 0 12 0 12
05-00 to 06-00 20 11 34 7 6 8 4 23 28 20 161 1 16 0 17
06-00 to 07-00 4 32 47 10 6 10 10 5 6 15 145 13 26 0 39
07-00 to 08-00 7 48 44 12 8 12 7 7 7 10 162 14 51 0 65
Total 443 763 942 425 158 177 164 432 502 631 4637 135 1459 2 1596

Appendix B - Page 10
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-3 From: E P Z To: Nabinagar Date 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 20 64 12 5 27 4 8 8 30 25 203 5 19 1 25
09-00 to 10-00 37 83 10 25 44 4 13 10 55 32 313 5 29 0 34
10-00 to 11-00 37 77 12 13 60 5 18 13 76 40 351 2 26 0 28
11-00 to 12-00 28 78 23 13 99 1 23 6 58 37 366 0 23 0 23
12-00 to 13-00 30 71 29 12 71 6 29 5 43 28 324 2 31 0 33
13-00 to 14-00 46 59 21 14 64 9 30 8 52 46 349 3 24 0 27
14-00 to 15-00 32 100 13 6 41 8 22 9 48 31 310 2 31 0 33
15-00 to 16-00 60 96 18 9 86 4 18 12 70 38 411 3 19 0 22
16-00 to 17-00 60 95 17 11 44 6 20 19 48 38 358 1 19 0 20
17-00 to 18-00 115 85 31 12 86 5 15 12 26 32 419 2 14 0 16
18-00 to 19-00 69 146 34 17 97 9 22 12 56 60 522 2 17 0 19
19-00 to 20-00 46 91 22 15 41 2 5 20 40 33 315 0 4 0 4
20-00 to 21-00 21 52 14 9 25 8 16 19 51 26 241 0 10 0 10
21-00 to 22-00 33 74 18 20 48 5 5 29 47 34 313 3 6 0 9
22-00 to 23-00 22 110 12 19 32 4 6 18 57 35 315 0 8 0 8
23-00 to 24-00 23 53 13 21 21 9 5 2 57 38 242 2 9 0 11
00-00 to 01-00 20 20 6 17 23 3 6 23 53 27 198 1 3 0 4
01-00 to 02-00 19 9 3 6 20 2 8 20 52 23 162 0 0 0 0
02-00 to 03-00 14 4 1 5 10 0 4 21 48 27 134 0 4 0 4
03-00 to 04-00 19 18 3 8 13 1 6 15 31 18 132 0 1 0 1
04-00 to 05-00 29 15 9 12 20 3 1 25 45 28 187 1 9 0 10
05-00 to 06-00 24 15 9 8 7 6 1 15 13 12 110 2 5 0 7
06-00 to 07-00 34 43 17 18 46 10 10 14 22 20 234 7 22 0 29
07-00 to 08-00 86 208 35 37 83 30 7 8 30 31 555 16 17 1 34
Total 924 1666 382 332 1108 144 298 343 1108 759 7064 59 350 2 411

Appendix B - Page 11
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-4 From: E P Z To: Abdullahpur Date 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 33 26 51 29 36 30 17 26 35 22 305 3 17 0 20
09-00 to 10-00 27 39 56 25 37 14 12 27 27 19 283 6 38 0 44
10-00 to 11-00 54 53 60 26 55 6 13 55 24 27 373 8 52 0 60
11-00 to 12-00 37 46 54 26 42 14 28 34 19 17 317 7 41 0 48
12-00 to 13-00 22 62 17 40 50 10 15 15 18 17 266 15 43 0 58
13-00 to 14-00 34 62 5 25 55 6 15 11 26 23 262 7 25 0 32
14-00 to 15-00 26 59 7 17 37 1 6 10 14 21 198 7 22 0 29
15-00 to 16-00 23 55 28 21 22 5 7 8 13 19 201 4 20 0 24
16-00 to 17-00 48 50 24 28 21 9 18 22 25 24 269 8 20 0 28
17-00 to 18-00 91 70 22 41 67 25 29 53 40 56 494 12 57 0 69
18-00 to 19-00 64 59 17 34 52 16 34 41 42 38 397 10 37 0 47
19-00 to 20-00 58 49 20 28 47 18 22 28 31 29 330 2 17 0 19
20-00 to 21-00 26 21 13 14 26 7 7 23 14 7 158 3 6 0 9
21-00 to 22-00 21 30 11 18 19 8 6 30 16 12 171 1 3 0 4
22-00 to 23-00 22 15 11 16 21 11 10 35 12 8 161 2 9 0 11
23-00 to 24-00 52 19 16 14 13 16 5 15 12 12 174 2 4 0 6
00-00 to 01-00 45 22 6 13 20 4 2 56 45 25 238 0 1 0 1
01-00 to 02-00 38 14 3 12 16 3 6 60 43 22 217 0 1 0 1
02-00 to 03-00 23 10 1 12 10 7 7 56 31 21 178 1 0 0 1
03-00 to 04-00 27 1 3 7 10 6 6 27 21 12 120 0 0 0 0
04-00 to 05-00 23 0 4 10 11 5 3 18 14 8 96 0 1 0 1
05-00 to 06-00 30 20 10 18 30 9 12 18 22 16 185 1 15 0 16
06-00 to 07-00 26 46 13 16 27 16 18 14 4 8 188 7 42 0 49
07-00 to 08-00 82 77 25 33 34 23 30 17 12 18 351 1 60 0 61
Total 932 905 477 523 758 269 328 699 560 481 5932 107 531 0 638

Appendix B - Page 12
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Abdullahpur Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 2 32 11 13 2 18 3 1 18 100 17 49 0 66
09-00 to 10-00 0 2 39 9 11 4 27 1 5 38 136 10 81 0 91
10-00 to 11-00 0 4 32 9 18 7 16 3 1 23 113 15 67 0 82
11-00 to 12-00 0 1 40 11 9 6 21 2 7 18 115 8 44 1 53
12-00 to 13-00 0 3 32 10 5 6 13 0 8 28 105 5 24 0 29
13-00 to 14-00 0 6 47 13 16 6 18 2 13 16 137 14 47 1 62
14-00 to 15-00 0 26 54 11 24 2 22 21 25 38 223 12 32 0 44
15-00 to 16-00 1 23 54 25 28 12 11 8 26 42 230 10 32 2 44
16-00 to 17-00 0 9 52 16 26 5 19 5 12 24 168 8 37 0 45
17-00 to 18-00 0 11 42 12 30 3 16 7 9 14 144 8 11 0 19
18-00 to 19-00 0 8 38 8 27 6 33 8 5 12 145 7 42 0 49
19-00 to 20-00 0 6 29 5 15 5 9 4 4 13 90 4 19 0 23
20-00 to 21-00 0 6 20 2 8 3 8 3 16 23 89 2 15 0 17
21-00 to 22-00 0 3 17 8 13 4 7 4 38 30 124 4 18 0 22
22-00 to 23-00 0 1 27 3 5 2 3 9 43 36 129 1 9 1 11
23-00 to 24-00 0 5 23 2 4 1 1 32 31 36 135 2 9 0 11
00-00 to 01-00 0 0 4 3 3 0 0 14 21 17 62 0 10 0 10
01-00 to 02-00 0 0 2 2 5 3 1 11 30 15 69 1 8 0 9
02-00 to 03-00 0 0 2 4 7 1 2 20 23 14 73 0 9 0 9
03-00 to 04-00 0 0 5 3 2 2 1 12 22 19 66 1 9 0 10
04-00 to 05-00 0 0 6 2 3 2 2 13 24 12 64 1 8 0 9
05-00 to 06-00 0 9 15 6 3 5 2 8 12 19 79 2 10 0 12
06-00 to 07-00 3 14 40 3 9 9 6 1 4 4 93 4 21 0 25
07-00 to 08-00 0 19 66 5 11 4 18 3 6 4 136 75 74 0 149
Total 4 158 718 183 295 100 274 194 386 513 2825 211 685 5 901

Appendix B - Page 13
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-6 From: Nabinagar To: E P Z Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 69 49 5 35 38 14 52 32 54 39 387 8 81 0 89
09-00 to 10-00 130 83 34 34 49 9 35 59 66 53 552 10 61 1 72
10-00 to 11-00 91 89 23 14 46 3 55 39 97 47 504 1 121 0 122
11-00 to 12-00 64 95 13 22 34 0 46 23 89 33 419 5 105 0 110
12-00 to 13-00 28 80 1 14 19 0 44 12 88 50 336 0 84 0 84
13-00 to 14-00 40 66 9 20 37 2 53 13 51 28 319 3 135 0 138
14-00 to 15-00 37 44 11 17 35 3 36 17 41 21 262 0 107 0 107
15-00 to 16-00 36 68 0 15 32 0 76 26 50 29 332 2 117 0 119
16-00 to 17-00 57 91 0 18 29 4 54 22 38 38 351 3 101 0 104
17-00 to 18-00 65 107 0 24 74 7 50 23 40 60 450 0 98 0 98
18-00 to 19-00 43 108 0 9 38 30 83 7 41 63 422 2 134 0 136
19-00 to 20-00 36 76 0 6 27 18 75 4 45 58 345 2 106 0 108
20-00 to 21-00 61 84 12 17 47 11 61 10 45 64 412 10 80 0 90
21-00 to 22-00 48 70 15 34 52 9 55 17 47 69 416 3 77 0 80
22-00 to 23-00 48 68 17 13 29 6 48 16 49 32 326 0 70 0 70
23-00 to 24-00 40 46 17 6 19 0 49 11 44 30 262 0 64 0 64
00-00 to 01-00 30 33 5 10 13 2 6 25 45 23 192 0 10 0 10
01-00 to 02-00 44 20 3 9 11 2 4 16 52 21 182 0 10 1 11
02-00 to 03-00 24 16 24 6 4 0 2 14 69 16 175 0 7 0 7
03-00 to 04-00 33 12 33 12 12 0 3 16 65 14 200 2 10 0 12
04-00 to 05-00 34 13 3 14 5 0 1 13 68 12 163 0 5 0 5
05-00 to 06-00 55 18 19 13 5 0 0 16 72 18 216 0 6 0 6
06-00 to 07-00 57 63 8 21 53 0 0 30 65 30 327 15 29 0 44
07-00 to 08-00 56 71 5 37 49 0 0 31 63 25 337 91 49 0 140
Total 1226 1470 257 420 757 120 888 492 1384 873 7887 157 1667 2 1826

Appendix B - Page 14
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-1 From: Abdullahpur To: Abdullahpur Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 2 2 11 6 0 0 0 3 1 25 0 35 1 36
09-00 to 10-00 0 11 9 6 6 1 6 0 1 4 44 0 16 0 16
10-00 to 11-00 0 7 1 4 1 0 0 0 2 1 16 1 19 0 20
11-00 to 12-00 0 7 1 0 0 2 1 0 0 5 16 3 19 0 22
12-00 to 13-00 0 5 0 0 9 0 1 0 0 3 18 3 23 0 26
13-00 to 14-00 0 3 0 0 6 0 1 0 0 4 14 0 12 0 12
14-00 to 15-00 0 2 1 0 0 0 0 0 6 2 11 0 11 0 11
15-00 to 16-00 0 3 2 0 3 2 0 0 0 1 11 1 14 0 15
16-00 to 17-00 0 1 0 0 2 0 0 0 2 4 9 0 6 0 6
17-00 to 18-00 1 1 0 11 3 0 1 0 0 6 23 0 7 0 7
18-00 to 19-00 0 1 3 4 0 0 1 0 1 3 13 0 6 0 6
19-00 to 20-00 0 2 3 4 2 0 0 0 0 2 13 0 8 0 8
20-00 to 21-00 0 0 0 0 2 0 1 0 0 4 7 0 19 0 19
21-00 to 22-00 0 1 0 6 3 0 1 0 0 3 14 0 10 0 10
22-00 to 23-00 1 1 2 5 3 1 0 0 2 4 19 1 17 0 18
23-00 to 24-00 0 0 0 3 6 0 0 1 8 3 21 0 9 0 9
00-00 to 01-00 0 0 0 1 5 0 1 2 5 7 21 0 12 0 12
01-00 to 02-00 0 0 0 13 0 0 0 1 7 10 31 0 4 0 4
02-00 to 03-00 0 0 0 4 0 0 0 0 2 7 13 0 3 0 3
03-00 to 04-00 0 0 0 0 0 0 0 0 2 3 5 0 2 0 2
04-00 to 05-00 0 0 0 0 0 0 0 0 1 1 2 0 0 0 0
05-00 to 06-00 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0
06-00 to 07-00 0 0 0 2 0 0 0 0 2 0 4 0 0 0 0
07-00 to 08-00 0 0 0 11 0 0 1 0 3 5 20 0 21 0 21
Total 2 47 24 85 57 6 15 4 50 83 373 9 273 1 283

Appendix B - Page 15
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Baipayl Turning Movement No:-5 From: Nabinagar To: Nabinagar Dated 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 0 7 0 16 2 0 0 0 0 25 0 10 0 10
09-00 to 10-00 0 0 0 11 15 0 5 0 0 0 31 0 19 0 19
10-00 to 11-00 0 0 7 0 16 2 1 0 0 0 26 0 21 0 21
11-00 to 12-00 0 0 4 0 8 1 0 0 0 0 13 0 11 0 11
12-00 to 13-00 0 0 1 0 3 1 3 0 0 0 8 0 8 0 8
13-00 to 14-00 0 0 4 0 8 0 2 0 0 0 14 0 10 0 10
14-00 to 15-00 0 0 4 0 7 0 12 0 0 0 23 0 12 0 12
15-00 to 16-00 0 0 4 0 5 0 15 0 0 0 24 0 6 0 6
16-00 to 17-00 0 0 6 0 7 0 8 0 0 0 21 1 11 0 12
17-00 to 18-00 0 0 6 0 8 0 9 0 0 0 23 0 15 0 15
18-00 to 19-00 0 0 4 0 12 0 9 0 1 2 28 3 17 0 20
19-00 to 20-00 0 0 9 0 8 0 11 0 0 9 37 2 15 0 17
20-00 to 21-00 0 6 2 0 10 0 9 0 0 3 30 0 17 0 17
21-00 to 22-00 0 0 7 0 1 0 8 0 9 0 25 0 13 0 13
22-00 to 23-00 0 0 0 0 6 0 3 0 8 6 23 0 1 0 1
23-00 to 24-00 0 0 6 0 8 0 0 5 7 2 28 0 0 0 0
00-00 to 01-00 0 0 3 0 8 0 1 5 5 3 25 0 0 0 0
01-00 to 02-00 0 0 1 0 8 0 0 0 2 0 11 0 0 0 0
02-00 to 03-00 0 0 2 0 4 0 0 0 2 0 8 0 0 0 0
03-00 to 04-00 0 0 4 0 6 0 0 0 1 1 12 1 0 0 1
04-00 to 05-00 0 0 6 0 6 0 7 0 0 2 21 9 0 0 9
05-00 to 06-00 0 0 5 0 12 0 14 0 0 0 31 6 0 0 6
06-00 to 07-00 0 0 4 0 11 0 11 0 0 0 26 5 0 0 5
07-00 to 08-00 0 0 2 0 8 0 8 0 0 0 18 6 0 0 6
Total 0 6 98 11 201 6 136 10 35 28 531 33 186 0 219

Appendix B - Page 16
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-1 From: Savar To: Baipayl Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 25 44 73 78 81 37 39 18 58 50 503 0 36 0 36
09-00 to 10-00 72 39 58 94 174 2 25 37 62 60 623 0 32 0 32
10-00 to 11-00 70 47 55 43 52 37 39 64 64 60 531 0 42 0 42
11-00 to 12-00 58 51 52 73 116 34 43 29 61 66 583 0 35 0 35
12-00 to 13-00 68 40 56 69 81 11 25 46 49 40 485 0 22 0 22
13-00 to 14-00 56 40 48 61 54 13 29 34 47 54 436 0 21 0 21
14-00 to 15-00 32 37 38 32 44 10 22 18 57 37 327 1 15 0 16
15-00 to 16-00 21 42 38 34 30 6 19 8 55 65 318 0 26 0 26
16-00 to 17-00 38 45 34 29 18 12 18 10 53 58 315 0 19 0 19
17-00 to 18-00 47 9 52 42 29 1 13 18 58 58 327 0 19 0 19
18-00 to 19-00 47 40 50 29 29 5 29 11 55 50 345 0 15 0 15
19-00 to 20-00 67 44 43 79 71 21 32 28 57 54 496 0 26 0 26
20-00 to 21-00 49 37 32 28 35 5 15 31 53 52 337 0 9 0 9
21-00 to 22-00 62 48 34 32 38 0 22 40 31 32 339 0 10 0 10
22-00 to 23-00 72 48 33 28 24 3 7 46 56 48 365 0 2 0 2
23-00 to 24-00 61 38 19 25 20 5 4 48 38 55 313 0 5 0 5
00-00 to 01-00 66 28 10 16 19 6 2 53 41 41 282 0 2 0 2
01-00 to 02-00 66 21 18 13 13 5 2 43 24 30 235 0 2 0 2
02-00 to 03-00 57 19 17 15 14 3 2 34 25 29 215 0 3 0 3
03-00 to 04-00 40 25 10 10 8 4 1 50 38 25 211 0 1 0 1
04-00 to 05-00 10 33 7 11 11 3 2 37 49 38 201 0 1 0 1
05-00 to 06-00 11 23 15 16 16 0 1 30 34 31 177 0 1 0 1
06-00 to 07-00 30 22 22 30 16 6 1 17 17 31 192 0 2 0 2
07-00 to 08-00 51 32 90 19 18 8 3 19 49 38 327 0 2 0 2
Total 1176 852 904 906 1011 237 395 769 1131 1102 8483 1 348 0 349

Appendix B - Page 17
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-2 From: Savar To: Nayarhat Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 52 49 14 9 22 1 5 4 15 24 195 1 7 0 8
09-00 to 10-00 68 48 19 11 54 0 4 3 22 7 236 1 32 0 33
10-00 to 11-00 38 68 14 8 39 0 13 6 20 27 233 0 29 0 29
11-00 to 12-00 58 65 11 13 39 1 13 4 18 21 243 1 19 0 20
12-00 to 13-00 38 58 10 10 35 6 6 5 28 18 214 2 15 0 17
13-00 to 14-00 28 61 21 13 35 0 8 4 15 26 211 4 30 0 34
14-00 to 15-00 30 46 20 9 27 0 10 4 20 19 185 1 36 0 37
15-00 to 16-00 37 68 33 18 32 8 11 6 19 23 255 1 36 0 37
16-00 to 17-00 52 79 11 11 25 7 22 4 14 34 259 2 44 0 46
17-00 to 18-00 53 75 14 17 35 0 23 6 23 34 280 1 40 0 41
18-00 to 19-00 48 85 8 12 31 0 8 6 20 36 254 5 28 0 33
19-00 to 20-00 25 51 5 8 25 0 9 4 33 20 180 2 80 0 82
20-00 to 21-00 65 55 10 8 23 0 3 4 55 31 254 1 11 0 12
21-00 to 22-00 84 61 17 5 20 0 4 5 60 35 291 1 26 0 27
22-00 to 23-00 74 55 11 1 5 0 7 4 59 13 229 0 2 0 2
23-00 to 24-00 74 7 9 0 3 0 6 4 27 8 138 0 0 0 0
00-00 to 01-00 44 1 2 1 3 0 1 4 70 12 138 0 0 0 0
01-00 to 02-00 5 0 3 1 5 0 1 4 66 5 90 0 0 0 0
02-00 to 03-00 0 0 6 3 3 0 0 5 71 7 95 0 0 0 0
03-00 to 04-00 0 0 4 1 3 0 0 5 85 6 104 0 0 0 0
04-00 to 05-00 0 1 1 3 12 0 0 4 71 4 96 1 0 0 1
05-00 to 06-00 15 34 20 10 16 0 0 1 63 30 189 1 1 0 2
06-00 to 07-00 13 48 6 5 14 0 4 4 49 29 172 1 11 0 12
07-00 to 08-00 17 67 6 10 24 0 3 4 59 43 233 2 13 0 15
Total 918 1082 275 187 530 23 161 104 982 512 4774 28 460 0 488

Appendix B - Page 18
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-3 From: Baipayl To: Nayarhat Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 2 42 52 40 34 0 20 11 55 21 277 2 42 0 44
09-00 to 10-00 1 25 44 24 40 0 16 9 3 15 177 0 27 0 27
10-00 to 11-00 0 26 36 7 11 0 14 11 14 29 148 2 36 0 38
11-00 to 12-00 3 16 35 18 15 0 8 8 25 19 147 0 44 0 44
12-00 to 13-00 0 20 60 22 30 0 15 9 34 13 203 2 30 0 32
13-00 to 14-00 0 31 48 34 52 1 15 24 40 13 258 0 23 0 23
14-00 to 15-00 2 24 55 13 24 0 13 16 33 7 187 0 22 0 22
15-00 to 16-00 1 28 45 18 33 0 21 20 22 18 206 0 14 0 14
16-00 to 17-00 2 33 50 22 36 0 25 23 38 13 242 0 39 0 39
17-00 to 18-00 3 48 49 30 25 0 25 16 23 17 236 0 29 0 29
18-00 to 19-00 7 65 35 27 28 0 25 17 24 16 244 0 28 0 28
19-00 to 20-00 0 42 16 30 36 0 26 3 21 9 183 2 22 0 24
20-00 to 21-00 19 40 43 39 33 0 10 66 30 12 292 0 0 0 0
21-00 to 22-00 23 32 46 25 32 0 2 46 32 21 259 0 0 0 0
22-00 to 23-00 19 16 35 29 36 2 3 32 7 3 182 0 0 0 0
23-00 to 24-00 13 14 5 28 19 0 4 31 22 8 144 0 0 0 0
00-00 to 01-00 12 5 3 16 11 0 0 35 21 3 106 0 0 0 0
01-00 to 02-00 31 4 2 9 9 0 0 53 8 3 119 0 0 0 0
02-00 to 03-00 43 4 53 1 5 1 2 63 13 2 187 0 0 0 0
03-00 to 04-00 40 4 40 1 5 3 0 64 4 2 163 0 0 0 0
04-00 to 05-00 43 2 42 4 3 0 0 51 5 2 152 0 1 0 1
05-00 to 06-00 47 10 44 21 3 3 0 49 13 6 196 0 0 0 0
06-00 to 07-00 52 4 44 3 14 0 0 51 17 14 199 1 0 0 1
07-00 to 08-00 45 37 45 17 15 0 13 34 35 26 267 0 15 0 15
Total 408 572 927 478 549 10 257 742 539 292 4774 9 372 0 381

Appendix B - Page 19
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-4 From: Baipayl To: Savar Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 5 99 12 5 38 0 2 2 22 43 228 2 17 0 19
09-00 to 10-00 19 54 37 9 26 0 4 17 34 40 240 2 17 0 19
10-00 to 11-00 16 79 21 9 24 0 24 20 41 59 293 1 28 0 29
11-00 to 12-00 18 66 16 10 34 0 16 22 39 52 273 1 31 0 32
12-00 to 13-00 24 43 29 14 49 0 29 16 30 33 267 3 38 0 41
13-00 to 14-00 43 38 39 11 57 0 12 16 35 21 272 1 21 0 22
14-00 to 15-00 39 50 28 7 47 0 14 12 27 13 237 4 20 0 24
15-00 to 16-00 56 48 53 18 66 1 19 11 31 35 338 2 9 1 12
16-00 to 17-00 35 47 67 25 83 0 14 10 18 16 315 4 25 0 29
17-00 to 18-00 35 63 52 13 36 0 21 17 29 15 281 0 17 0 17
18-00 to 19-00 19 50 62 6 23 0 11 11 27 12 221 0 25 0 25
19-00 to 20-00 4 32 16 4 22 0 2 3 7 4 94 1 5 0 6
20-00 to 21-00 19 15 43 4 76 1 17 10 24 3 212 3 12 0 15
21-00 to 22-00 37 18 52 3 23 0 6 22 23 3 187 0 5 0 5
22-00 to 23-00 3 4 10 2 10 0 6 13 21 2 71 0 4 3 7
23-00 to 24-00 3 0 5 2 19 0 6 15 44 0 94 0 0 6 6
00-00 to 01-00 7 2 1 6 25 0 5 16 41 0 103 0 0 1 1
01-00 to 02-00 8 0 1 4 8 0 7 17 24 0 69 0 0 0 0
02-00 to 03-00 8 0 1 3 11 0 5 20 17 0 65 0 0 0 0
03-00 to 04-00 8 0 3 4 6 0 3 16 11 0 51 0 0 0 0
04-00 to 05-00 10 0 3 5 15 0 1 27 11 0 72 0 0 3 3
05-00 to 06-00 13 6 17 10 14 0 1 38 13 2 114 2 1 3 6
06-00 to 07-00 16 29 41 3 8 0 3 17 13 10 140 3 13 2 18
07-00 to 08-00 12 60 36 2 13 0 8 23 9 12 175 8 13 0 21
Total 457 803 645 179 733 2 236 391 591 375 4412 37 301 19 357

Appendix B - Page 20
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-5 From: Nayarhat To: Savar Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 34 45 26 35 60 0 17 9 48 30 304 3 0 0 3
09-00 to 10-00 24 42 12 19 41 0 17 0 34 25 214 2 28 0 30
10-00 to 11-00 16 55 8 29 61 0 18 2 60 30 279 5 38 0 43
11-00 to 12-00 26 52 16 27 62 0 22 2 51 28 286 5 37 0 42
12-00 to 13-00 18 48 11 26 62 0 26 1 63 25 280 6 36 0 42
13-00 to 14-00 48 55 8 34 67 0 26 1 52 16 307 7 41 0 48
14-00 to 15-00 46 61 17 27 56 0 35 5 63 33 343 2 30 0 32
15-00 to 16-00 47 61 25 32 69 1 27 0 61 31 354 3 29 0 32
16-00 to 17-00 50 52 27 40 69 0 34 3 53 55 383 2 52 0 54
17-00 to 18-00 70 37 39 45 94 0 30 2 54 56 427 3 27 0 30
18-00 to 19-00 61 35 23 55 97 1 22 1 58 71 424 4 21 0 25
19-00 to 20-00 82 44 41 38 75 1 29 4 57 47 418 2 20 0 22
20-00 to 21-00 72 60 28 85 91 3 11 10 65 32 457 0 4 0 4
21-00 to 22-00 66 75 34 46 52 4 9 9 60 55 410 5 5 0 10
22-00 to 23-00 71 55 41 13 21 7 9 8 70 50 345 0 12 0 12
23-00 to 24-00 42 45 24 8 24 2 3 9 60 40 257 0 7 0 7
00-00 to 01-00 54 30 20 5 12 5 6 29 40 35 236 0 9 0 9
01-00 to 02-00 19 2 10 3 7 8 6 38 16 14 123 0 8 0 8
02-00 to 03-00 6 5 2 13 7 5 5 42 27 26 138 0 7 0 7
03-00 to 04-00 16 6 13 18 16 6 7 15 40 40 177 0 4 0 4
04-00 to 05-00 41 39 13 12 8 8 8 23 43 42 237 0 5 0 5
05-00 to 06-00 16 44 15 11 8 4 8 26 15 20 167 0 10 0 10
06-00 to 07-00 13 43 13 7 10 2 9 16 11 32 156 0 19 0 19
07-00 to 08-00 72 65 28 7 15 2 8 18 18 35 268 1 8 0 9
Total 1010 1056 494 635 1084 59 392 273 1119 868 6990 50 457 0 507

Appendix B - Page 21
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-6 From: Nayarhat To: Baipayl Date : 19.7.2016 Day: Tuesday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 1 10 7 22 30 13 24 0 21 10 138 3 56 0 59
09-00 to 10-00 0 15 14 22 19 1 14 1 24 11 121 5 51 0 56
10-00 to 11-00 1 12 43 6 23 2 24 6 61 4 182 1 63 0 64
11-00 to 12-00 0 17 25 15 33 2 28 4 43 15 182 3 68 1 72
12-00 to 13-00 1 0 12 18 26 2 21 7 35 13 135 3 56 0 59
13-00 to 14-00 2 33 17 14 24 1 42 3 15 11 162 3 64 0 67
14-00 to 15-00 6 16 36 27 14 1 26 4 22 6 158 5 40 0 45
15-00 to 16-00 8 32 29 11 21 1 21 6 37 19 185 6 52 0 58
16-00 to 17-00 5 35 14 22 25 2 44 0 18 11 176 3 68 0 71
17-00 to 18-00 4 30 17 22 23 3 29 0 21 5 154 6 73 0 79
18-00 to 19-00 1 17 8 22 17 3 50 2 19 9 148 9 78 0 87
19-00 to 20-00 13 17 12 15 30 2 20 0 21 7 137 4 32 0 36
20-00 to 21-00 13 18 12 20 19 5 11 27 8 12 145 2 26 0 28
21-00 to 22-00 11 17 9 7 18 13 8 31 13 7 134 0 15 0 15
22-00 to 23-00 5 13 9 14 5 2 7 26 32 26 139 2 5 0 7
23-00 to 24-00 14 14 9 11 9 2 5 18 38 29 149 1 10 0 11
00-00 to 01-00 11 6 9 10 11 2 2 11 36 28 126 0 7 0 7
01-00 to 02-00 9 3 12 27 9 2 4 15 23 18 122 2 5 0 7
02-00 to 03-00 11 3 9 17 11 0 1 12 21 17 102 0 2 0 2
03-00 to 04-00 14 1 9 40 10 1 2 12 17 12 118 0 1 0 1
04-00 to 05-00 10 2 10 35 15 1 1 16 11 5 106 2 1 0 3
05-00 to 06-00 18 1 13 26 20 7 1 24 6 6 122 2 6 0 8
06-00 to 07-00 22 5 22 50 30 8 1 26 6 16 186 2 13 0 15
07-00 to 08-00 23 4 21 34 22 6 1 24 13 10 158 1 6 0 7
Total 203 321 378 507 464 82 387 275 561 307 3485 65 798 1 864

Appendix B - Page 22
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-1 From: Savar To: Baipayl Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 57 70 40 33 61 0 18 0 27 32 338 2 27 0 29
09-00 to 10-00 89 100 40 46 59 1 20 0 40 47 442 0 42 0 42
10-00 to 11-00 79 92 27 47 83 0 28 2 54 44 456 0 37 0 37
11-00 to 12-00 68 102 33 30 69 0 35 0 32 44 413 3 40 0 43
12-00 to 13-00 49 104 30 42 58 0 23 0 35 37 378 0 33 0 33
13-00 to 14-00 59 106 36 33 68 0 43 0 38 44 427 4 24 0 28
14-00 to 15-00 48 89 41 35 69 0 16 2 23 39 362 3 24 0 27
15-00 to 16-00 57 84 19 36 43 0 28 2 21 26 316 2 36 0 38
16-00 to 17-00 56 101 32 42 53 0 33 2 24 29 372 1 19 0 20
17-00 to 18-00 49 111 25 33 48 0 36 3 62 39 406 11 23 0 34
18-00 to 19-00 45 90 18 39 45 0 31 8 64 35 375 4 36 0 40
19-00 to 20-00 35 79 32 20 28 0 7 3 40 28 272 1 11 0 12
20-00 to 21-00 38 80 33 18 32 1 16 2 30 33 283 3 26 0 29
21-00 to 22-00 91 60 27 33 72 0 27 1 31 33 375 1 9 0 10
22-00 to 23-00 57 43 15 18 28 0 7 1 34 22 225 2 5 0 7
23-00 to 24-00 74 24 13 14 29 0 5 1 56 13 229 0 3 0 3
00-00 to 01-00 74 9 10 11 14 0 2 7 121 32 280 0 4 0 4
01-00 to 02-00 12 4 8 4 9 0 0 3 92 20 152 0 0 0 0
02-00 to 03-00 14 2 4 4 8 0 0 3 60 19 114 0 2 0 2
03-00 to 04-00 9 26 6 17 6 0 0 3 79 29 175 0 6 0 6
04-00 to 05-00 9 8 2 14 8 0 6 2 55 34 138 0 13 0 13
05-00 to 06-00 13 78 18 19 6 9 7 2 63 24 239 0 21 0 21
06-00 to 07-00 21 114 39 21 21 0 12 0 30 15 273 2 22 0 24
07-00 to 08-00 40 142 79 25 42 0 34 0 29 16 407 7 30 0 37
Total 1143 1718 627 634 959 11 434 47 1140 734 7447 46 493 0 539

Appendix B - Page 23
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-2 From: Savar To: Nayarhat Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 35 68 27 11 28 2 10 2 29 28 240 2 22 0 24
09-00 to 10-00 41 84 24 11 65 0 15 0 59 45 344 1 72 0 73
10-00 to 11-00 51 67 27 11 73 0 13 0 72 61 375 2 73 0 75
11-00 to 12-00 47 93 33 11 49 1 13 1 64 36 348 6 82 0 88
12-00 to 13-00 49 82 33 6 34 3 13 0 67 50 337 3 56 0 59
13-00 to 14-00 52 89 37 7 44 1 14 3 74 56 377 6 47 0 53
14-00 to 15-00 26 60 21 7 55 2 24 0 41 30 266 8 46 0 54
15-00 to 16-00 43 65 32 11 55 3 28 0 71 39 347 9 103 0 112
16-00 to 17-00 43 31 39 17 81 4 35 1 50 14 315 5 85 0 90
17-00 to 18-00 22 92 39 7 77 1 40 2 54 32 366 4 70 0 74
18-00 to 19-00 15 84 39 7 51 0 26 4 50 22 298 3 59 0 62
19-00 to 20-00 5 29 33 6 49 0 29 0 23 18 192 1 41 0 42
20-00 to 21-00 50 46 24 4 12 1 5 3 80 37 262 0 15 0 15
21-00 to 22-00 32 30 37 4 18 0 2 4 62 10 199 0 24 0 24
22-00 to 23-00 39 18 26 3 17 0 4 4 53 7 171 0 3 0 3
23-00 to 24-00 32 16 23 1 2 0 1 6 50 7 138 0 5 0 5
00-00 to 01-00 31 9 15 0 0 1 1 10 62 13 142 0 4 0 4
01-00 to 02-00 11 7 12 1 3 0 1 10 62 17 124 0 3 0 3
02-00 to 03-00 13 8 15 1 2 0 0 17 67 11 134 0 3 0 3
03-00 to 04-00 10 1 13 2 3 0 1 13 58 29 130 0 2 0 2
04-00 to 05-00 6 4 7 2 9 0 1 16 69 32 146 0 3 0 3
05-00 to 06-00 12 7 5 2 3 4 1 14 72 36 156 0 3 0 3
06-00 to 07-00 15 29 29 4 22 0 9 3 40 20 171 0 18 0 18
07-00 to 08-00 11 76 28 5 26 2 7 0 55 25 235 0 25 0 25
Total 691 1095 618 141 778 25 293 113 1384 675 5813 50 864 0 914

Appendix B - Page 24
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-3 From: Baipayl To: Nayarhat Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 15 34 31 5 27 0 9 6 35 18 180 4 39 0 43
09-00 to 10-00 27 70 14 27 33 2 10 4 18 31 236 8 52 0 60
10-00 to 11-00 17 52 13 17 35 0 10 6 31 36 217 10 43 0 53
11-00 to 12-00 11 62 20 10 54 0 8 3 26 26 220 2 45 0 47
12-00 to 13-00 17 55 15 17 56 0 12 2 23 36 233 3 38 0 41
13-00 to 14-00 27 63 11 11 32 3 9 2 16 9 183 7 27 0 34
14-00 to 15-00 18 55 23 6 48 0 10 2 19 13 194 8 35 0 43
15-00 to 16-00 29 62 10 9 48 0 13 2 25 18 216 6 42 1 49
16-00 to 17-00 45 61 11 10 61 0 13 3 28 28 260 3 49 0 52
17-00 to 18-00 44 72 20 30 66 0 12 2 25 48 319 5 45 0 50
18-00 to 19-00 51 75 60 28 69 0 14 4 42 72 415 4 44 0 48
19-00 to 20-00 25 79 18 25 59 0 9 8 6 43 272 2 28 0 30
20-00 to 21-00 23 51 18 9 53 0 12 10 29 25 230 5 20 0 25
21-00 to 22-00 18 29 12 13 40 1 12 3 35 15 178 1 19 0 20
22-00 to 23-00 15 28 7 6 22 1 5 3 45 21 153 3 12 0 15
23-00 to 24-00 17 23 22 7 29 1 1 6 69 33 208 1 6 0 7
00-00 to 01-00 10 11 8 4 14 1 0 4 38 22 112 1 6 0 7
01-00 to 02-00 17 0 10 1 16 2 0 4 60 24 134 0 2 0 2
02-00 to 03-00 15 4 2 1 4 2 0 5 44 19 96 0 0 0 0
03-00 to 04-00 9 3 1 1 4 3 0 2 25 28 76 0 2 0 2
04-00 to 05-00 13 1 8 9 4 4 0 9 53 15 116 1 3 0 4
05-00 to 06-00 19 18 11 11 18 2 1 5 23 14 122 4 12 0 16
06-00 to 07-00 19 56 37 6 33 4 7 2 21 10 195 3 12 0 15
07-00 to 08-00 18 71 25 7 18 2 6 3 24 16 190 0 18 0 18
Total 519 1035 407 270 843 28 173 100 760 620 4755 81 599 1 681

Appendix B - Page 25
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-4 From: Baipayl To: Savar Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 37 23 17 38 0 3 1 35 14 168 1 15 0 16
09-00 to 10-00 17 22 44 27 11 1 4 7 39 10 182 0 17 0 17
10-00 to 11-00 10 40 46 24 19 0 9 11 49 17 225 0 10 0 10
11-00 to 12-00 0 43 38 22 42 0 10 1 48 20 224 0 15 0 15
12-00 to 13-00 0 34 30 26 37 0 6 3 40 16 192 0 16 0 16
13-00 to 14-00 1 38 46 24 34 1 2 0 46 8 200 0 16 0 16
14-00 to 15-00 1 46 43 43 29 0 1 2 45 11 221 0 12 0 12
15-00 to 16-00 2 48 37 37 14 1 4 3 44 14 204 0 25 0 25
16-00 to 17-00 2 38 51 37 31 0 6 6 35 3 209 0 21 0 21
17-00 to 18-00 11 63 64 43 27 0 8 2 44 19 281 0 15 0 15
18-00 to 19-00 8 48 56 30 23 1 8 4 29 12 219 0 9 0 9
19-00 to 20-00 27 38 59 21 9 0 12 4 21 5 196 0 10 0 10
20-00 to 21-00 7 36 35 28 20 0 3 1 22 22 174 0 7 0 7
21-00 to 22-00 6 41 36 25 24 3 3 2 27 11 178 0 13 0 13
22-00 to 23-00 6 18 34 22 4 0 1 5 30 13 133 0 14 0 14
23-00 to 24-00 18 15 50 13 5 1 1 11 24 7 145 0 6 0 6
00-00 to 01-00 4 14 19 9 7 0 0 5 20 8 86 0 3 0 3
01-00 to 02-00 11 0 13 7 6 0 1 7 49 11 105 0 3 0 3
02-00 to 03-00 0 0 10 7 4 0 1 5 24 9 60 0 1 0 1
03-00 to 04-00 5 0 21 8 8 1 0 10 33 11 97 0 2 0 2
04-00 to 05-00 3 4 3 6 3 4 3 5 20 4 55 0 11 0 11
05-00 to 06-00 1 20 14 5 4 0 1 1 19 8 73 0 0 0 0
06-00 to 07-00 4 32 59 4 7 3 13 8 22 6 158 1 17 0 18
07-00 to 08-00 3 52 42 31 7 0 5 5 41 0 186 2 2 0 4
Total 147 727 873 516 413 16 105 109 806 259 3971 4 260 0 264

Appendix B - Page 26
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-5 From: Nayarhat To: Savar Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 47 49 15 23 19 0 11 13 41 41 259 0 24 0 24
09-00 to 10-00 46 31 28 24 28 1 11 3 27 19 218 6 26 0 32
10-00 to 11-00 31 36 16 21 50 0 17 0 44 20 235 5 35 0 40
11-00 to 12-00 44 46 17 28 43 0 24 6 45 31 284 4 31 0 35
12-00 to 13-00 38 43 18 29 30 0 9 6 32 21 226 1 22 0 23
13-00 to 14-00 54 86 20 36 61 0 27 9 43 21 357 3 30 0 33
14-00 to 15-00 50 40 19 26 38 1 20 4 30 16 244 2 21 0 23
15-00 to 16-00 51 53 15 30 58 0 23 11 26 20 287 0 38 0 38
16-00 to 17-00 49 40 16 37 113 0 34 4 29 18 340 0 46 0 46
17-00 to 18-00 39 69 17 34 113 0 37 9 47 24 389 6 40 0 46
18-00 to 19-00 59 58 21 43 129 0 40 9 53 35 447 0 31 0 31
19-00 to 20-00 61 64 28 41 66 1 16 6 50 27 360 0 13 0 13
20-00 to 21-00 43 51 29 14 34 0 7 15 41 20 254 0 18 0 18
21-00 to 22-00 56 38 18 15 21 0 16 6 49 18 237 0 9 0 9
22-00 to 23-00 48 23 6 8 27 1 2 9 59 13 196 0 5 0 5
23-00 to 24-00 39 11 6 11 33 6 0 9 38 5 158 0 5 0 5
00-00 to 01-00 22 2 1 5 16 0 3 4 30 6 89 0 12 0 12
01-00 to 02-00 22 0 3 3 19 0 0 5 21 6 79 0 6 0 6
02-00 to 03-00 19 2 0 4 22 2 0 1 22 3 75 0 4 0 4
03-00 to 04-00 29 7 3 5 12 0 0 0 23 7 86 0 4 0 4
04-00 to 05-00 35 25 8 10 14 0 0 1 33 4 130 0 10 0 10
05-00 to 06-00 51 65 14 10 12 3 5 5 14 12 191 1 10 0 11
06-00 to 07-00 89 117 20 11 24 0 9 2 12 9 293 1 8 0 9
07-00 to 08-00 77 109 21 22 35 0 29 5 20 16 334 1 10 0 11
Total 1099 1065 359 490 1017 15 340 142 829 412 5768 30 458 0 488

Appendix B - Page 27
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Nabinagar Turning Movement No:-6 From: Nayarhat To: Baipayl Date : 22.7.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Car/Taxi Truck/ Total Animal Total Non
Time Medium Small Bus/ Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus Micro Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 3 24 26 17 10 12 21 4 38 13 168 3 55 0 58
09-00 to 10-00 0 27 37 25 20 0 21 6 66 15 217 3 63 0 66
10-00 to 11-00 0 16 31 15 18 0 8 5 52 16 161 2 61 0 63
11-00 to 12-00 1 23 32 20 16 0 20 7 104 12 235 2 92 0 94
12-00 to 13-00 0 25 28 12 12 1 13 4 58 41 194 4 51 0 55
13-00 to 14-00 0 22 37 19 26 1 12 6 36 11 170 5 32 1 38
14-00 to 15-00 1 34 35 19 17 1 17 3 66 17 210 4 79 0 83
15-00 to 16-00 3 32 38 26 20 2 27 5 32 26 211 3 53 0 56
16-00 to 17-00 1 36 37 27 22 6 16 3 62 19 229 1 77 0 78
17-00 to 18-00 1 49 29 22 25 0 56 13 33 25 253 9 87 0 96
18-00 to 19-00 0 37 26 22 35 0 36 5 57 30 248 2 53 0 55
19-00 to 20-00 1 28 24 19 13 4 10 5 27 15 146 5 51 0 56
20-00 to 21-00 1 19 19 12 18 3 15 9 49 20 165 2 71 0 73
21-00 to 22-00 0 17 13 11 23 1 19 3 70 25 182 1 48 0 49
22-00 to 23-00 0 10 15 8 11 0 1 1 16 13 75 0 15 0 15
23-00 to 24-00 0 8 9 7 4 1 6 5 16 13 69 0 22 0 22
00-00 to 01-00 0 1 6 6 7 0 7 5 31 17 80 0 16 0 16
01-00 to 02-00 0 1 3 7 4 0 1 4 9 11 40 0 9 0 9
02-00 to 03-00 0 0 2 5 4 0 2 4 13 9 39 0 4 0 4
03-00 to 04-00 0 6 4 4 11 0 0 4 20 11 60 0 11 0 11
04-00 to 05-00 0 4 3 2 4 2 1 3 5 6 30 0 11 0 11
05-00 to 06-00 0 10 12 4 2 9 4 1 0 9 51 0 18 0 18
06-00 to 07-00 1 93 29 4 2 5 17 1 13 17 182 7 50 0 57
07-00 to 08-00 1 86 24 28 19 15 25 4 39 28 269 24 92 0 116
Total 14 608 519 341 343 63 355 110 912 419 3684 77 1121 1 1199

Appendix B - Page 28
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Bailpayl To: Kashimpur Date : 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 6 16 58 20 55 3 24 19 24 30 255 7 8 2 17
09-00 to 10-00 16 28 15 42 60 5 34 54 47 56 357 1 8 0 9
10-00 to 11-00 12 22 26 44 65 3 10 78 33 39 332 3 8 0 11
11-00 to 12-00 2 36 21 50 75 0 43 83 40 51 401 3 17 0 20
12-00 to 13-00 3 29 13 30 62 0 34 55 51 51 328 1 1 0 2
13-00 to 14-00 8 31 17 28 56 0 21 46 42 51 300 2 0 2 4
14-00 to 15-00 1 38 4 46 66 0 17 34 38 38 282 0 12 0 12
15-00 to 16-00 0 29 19 45 75 0 32 48 60 58 366 1 0 0 1
16-00 to 17-00 1 17 11 42 85 8 32 11 48 45 300 0 21 0 21
17-00 to 18-00 1 15 28 36 65 0 25 154 48 44 416 0 22 0 22
18-00 to 19-00 4 11 30 32 35 4 34 57 33 27 267 0 16 0 16
19-00 to 20-00 4 14 14 30 55 4 31 87 56 48 343 0 31 0 31
20-00 to 21-00 3 11 18 15 38 3 37 60 53 40 278 0 13 0 13
21-00 to 22-00 8 7 17 18 15 3 11 45 32 41 197 0 15 0 15
22-00 to 23-00 3 4 3 21 8 3 11 35 30 29 147 0 8 0 8
23-00 to 24-00 3 6 6 23 6 6 20 35 45 37 187 0 21 0 21
00-00 to 01-00 10 5 0 13 27 0 0 26 50 23 154 0 0 0 0
01-00 to 02-00 10 6 2 3 2 0 0 18 33 26 100 0 0 0 0
02-00 to 03-00 4 3 4 0 2 5 7 14 31 20 90 0 9 0 9
03-00 to 04-00 2 4 6 0 0 3 13 4 53 47 132 0 21 0 21
04-00 to 05-00 0 4 5 0 5 4 35 2 37 26 118 0 46 0 46
05-00 to 06-00 0 6 12 0 28 1 41 1 34 31 154 0 41 0 41
06-00 to 07-00 0 14 14 24 32 4 22 0 48 31 189 0 32 0 32
07-00 to 08-00 0 21 20 30 35 4 15 0 47 45 217 0 13 0 13
Total 101 377 363 592 952 63 549 966 1013 934 5910 18 363 4 385

Appendix B - Page 29
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-2 From: Baipayl To:Kaliakair Date : 18.07.2016Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 59 93 30 42 11 1 15 18 59 36 364 1 29 0 30
09-00 to 10-00 55 68 15 24 13 1 26 11 33 21 267 2 16 3 21
10-00 to 11-00 97 51 15 43 15 0 8 9 17 12 267 0 13 0 13
11-00 to 12-00 79 72 20 45 22 0 10 11 27 22 308 0 14 0 14
12-00 to 13-00 115 61 14 43 29 0 16 14 33 33 358 0 10 0 10
13-00 to 14-00 142 53 43 31 29 0 8 52 32 31 421 3 14 0 17
14-00 to 15-00 107 70 15 54 36 0 6 22 53 54 417 0 10 0 10
15-00 to 16-00 93 46 17 45 32 0 6 21 31 24 315 1 8 0 9
16-00 to 17-00 84 46 14 39 22 1 7 21 27 38 299 2 9 0 11
17-00 to 18-00 106 31 8 40 19 2 7 10 18 11 252 0 8 0 8
18-00 to 19-00 83 46 12 59 29 0 9 48 34 18 338 1 7 0 8
19-00 to 20-00 90 22 11 61 17 0 3 68 28 10 310 0 7 3 10
20-00 to 21-00 82 42 4 9 4 0 4 63 35 13 256 0 3 0 3
21-00 to 22-00 22 58 4 5 3 0 2 30 45 73 242 0 3 0 3
22-00 to 23-00 19 48 2 3 2 0 4 34 44 230 386 0 2 0 2
23-00 to 24-00 19 7 1 1 2 0 2 33 36 25 126 0 2 0 2
00-00 to 01-00 7 3 1 3 2 0 0 34 14 19 83 0 2 0 2
01-00 to 02-00 7 0 1 2 1 0 1 16 14 5 47 0 0 0 0
02-00 to 03-00 7 3 0 0 3 0 0 16 15 13 57 0 0 0 0
03-00 to 04-00 11 7 1 2 1 3 0 31 24 30 110 0 0 0 0
04-00 to 05-00 12 32 1 31 10 3 2 26 20 16 153 0 2 0 2
05-00 to 06-00 27 26 2 17 12 2 2 34 25 15 162 0 3 0 3
06-00 to 07-00 35 23 6 18 38 3 1 36 26 25 211 1 1 0 2
07-00 to 08-00 71 43 7 19 40 2 2 40 53 52 329 3 1 0 4
Total 1429 951 244 636 392 18 141 698 743 826 6078 14 164 6 184

Appendix B - Page 30
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-3 From: Kashimpur To: Kaliakair Date : 18.07.2016Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 27 33 12 55 26 50 25 20 50 41 339 5 57 2 64
09-00 to 10-00 28 32 19 30 21 12 33 13 30 41 259 0 28 0 28
10-00 to 11-00 20 26 12 56 24 9 27 26 57 39 296 0 32 0 32
11-00 to 12-00 19 35 20 29 20 6 14 26 50 34 253 0 24 0 24
12-00 to 13-00 11 23 9 35 20 13 19 24 90 23 267 0 24 0 24
13-00 to 14-00 16 26 10 32 24 10 22 18 60 24 242 0 22 0 22
14-00 to 15-00 19 26 8 33 24 7 17 22 51 31 238 0 20 0 20
15-00 to 16-00 30 15 7 28 17 9 28 42 26 22 224 0 15 0 15
16-00 to 17-00 7 26 11 33 25 8 15 29 69 18 241 0 17 0 17
17-00 to 18-00 7 12 10 47 36 4 11 23 61 16 227 0 11 0 11
18-00 to 19-00 5 6 7 19 18 5 13 30 52 12 167 0 11 0 11
19-00 to 20-00 11 12 12 19 15 3 9 40 111 43 275 0 5 0 5
20-00 to 21-00 12 22 16 24 13 3 5 33 119 86 333 0 2 0 2
21-00 to 22-00 18 15 13 15 15 4 4 38 84 48 254 0 5 0 5
22-00 to 23-00 9 5 8 8 11 1 4 33 96 52 227 0 0 0 0
23-00 to 24-00 7 10 6 9 12 3 5 29 92 42 215 0 2 0 2
00-00 to 01-00 11 4 10 8 9 2 2 32 76 29 183 0 1 0 1
01-00 to 02-00 7 2 1 8 8 3 3 23 69 38 162 0 3 0 3
02-00 to 03-00 2 3 0 9 8 2 4 11 48 32 119 0 2 0 2
03-00 to 04-00 12 12 11 13 9 6 3 23 46 14 149 0 5 0 5
04-00 to 05-00 9 7 9 13 12 3 1 19 36 6 115 0 2 0 2
05-00 to 06-00 19 15 17 10 4 5 3 27 57 16 173 0 14 0 14
06-00 to 07-00 34 17 29 7 31 11 9 33 34 19 224 0 23 0 23
07-00 to 08-00 38 17 29 14 46 6 8 21 37 18 234 2 22 0 24
Total 378 401 286 554 448 185 284 635 1501 744 5416 7 347 2 356

Appendix B - Page 31
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Bailpayl Date : Date : 18.07.2016Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 13 23 10 13 28 1 19 9 15 37 168 8 19 0 27
09-00 to 10-00 16 22 11 16 35 0 12 20 18 22 172 1 13 2 16
10-00 to 11-00 24 32 16 10 20 0 8 21 30 32 193 0 11 1 12
11-00 to 12-00 17 28 7 10 22 0 12 26 27 28 177 0 4 1 5
12-00 to 13-00 22 22 11 6 19 0 4 24 28 22 158 1 10 1 12
13-00 to 14-00 29 34 14 11 35 0 8 32 24 34 221 0 10 1 11
14-00 to 15-00 8 36 15 6 32 10 9 10 27 36 189 0 8 1 9
15-00 to 16-00 7 33 3 7 29 1 11 6 24 33 154 0 9 0 9
16-00 to 17-00 3 38 27 6 37 1 14 6 39 38 209 0 9 0 9
17-00 to 18-00 4 39 10 6 23 2 10 5 45 21 165 4 8 2 14
18-00 to 19-00 0 28 11 2 20 1 9 3 43 23 140 0 14 0 14
19-00 to 20-00 0 29 8 3 11 0 10 7 49 17 134 1 9 0 10
20-00 to 21-00 3 25 2 2 8 0 3 9 64 33 149 0 5 0 5
21-00 to 22-00 4 20 1 1 7 0 3 8 74 19 137 0 0 0 0
22-00 to 23-00 4 20 3 3 6 0 1 12 74 16 139 0 0 0 0
23-00 to 24-00 0 0 9 3 5 1 2 4 29 13 66 0 0 0 0
00-00 to 01-00 4 0 7 1 3 0 1 8 16 27 67 0 0 0 0
01-00 to 02-00 0 15 3 2 8 0 2 5 31 21 87 0 0 0 0
02-00 to 03-00 2 16 2 2 13 0 3 11 24 19 92 1 1 0 2
03-00 to 04-00 0 21 13 8 7 2 4 12 24 14 105 0 7 0 7
04-00 to 05-00 1 35 25 4 8 1 1 9 27 15 126 0 5 0 5
05-00 to 06-00 0 21 26 8 9 0 0 12 10 8 94 1 2 0 3
06-00 to 07-00 0 20 23 12 18 3 5 11 10 15 117 0 15 0 15
07-00 to 08-00 0 33 26 15 23 4 7 13 17 17 155 0 26 0 26
Total 161 590 283 157 426 27 158 283 769 560 3414 17 185 9 211

Appendix B - Page 32
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-5 From: Kaliakair To: Bailpayl Date : 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 52 27 30 27 78 0 15 13 42 32 316 1 12 1 14
09-00 to 10-00 47 24 20 30 39 0 14 9 35 21 239 0 13 0 13
10-00 to 11-00 43 21 28 17 38 1 19 7 33 16 223 2 10 0 12
11-00 to 12-00 71 20 14 24 33 0 11 6 22 23 224 2 9 0 11
12-00 to 13-00 104 21 18 18 47 0 11 6 36 23 284 0 6 0 6
13-00 to 14-00 115 22 22 31 73 0 15 3 38 39 358 0 10 0 10
14-00 to 15-00 96 33 24 28 94 0 17 12 35 42 381 0 9 0 9
15-00 to 16-00 110 39 18 30 65 2 13 15 49 24 365 0 8 0 8
16-00 to 17-00 77 32 25 31 70 1 12 5 59 31 343 1 6 0 7
17-00 to 18-00 59 39 23 29 69 0 9 10 117 28 383 0 13 1 14
18-00 to 19-00 33 23 30 19 26 0 7 78 32 29 277 4 3 0 7
19-00 to 20-00 62 14 43 35 23 0 6 91 20 30 324 5 4 0 9
20-00 to 21-00 34 22 23 34 25 0 5 61 26 27 257 10 4 0 14
21-00 to 22-00 20 22 3 27 16 0 4 28 36 30 186 4 1 0 5
22-00 to 23-00 3 20 7 12 9 0 4 21 22 22 120 4 1 0 5
23-00 to 24-00 4 17 9 12 3 0 1 22 25 12 105 2 1 0 3
00-00 to 01-00 3 14 3 6 6 0 1 37 15 11 96 0 0 1 1
01-00 to 02-00 15 5 1 7 5 0 2 33 11 5 84 0 1 0 1
02-00 to 03-00 9 19 11 7 5 0 0 11 29 12 103 0 0 0 0
03-00 to 04-00 16 5 19 15 7 0 4 16 10 6 98 4 2 0 6
04-00 to 05-00 22 27 14 14 7 0 10 17 22 14 147 0 3 0 3
05-00 to 06-00 29 55 13 10 8 0 12 20 33 48 228 1 5 0 6
06-00 to 07-00 27 36 15 12 6 0 10 18 24 30 178 0 6 0 6
07-00 to 08-00 61 35 31 13 12 0 10 30 33 26 251 3 7 0 10
Total 1112 592 444 488 764 4 212 569 804 581 5570 43 134 3 180

Appendix B - Page 33
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-6 From: Kaliakair To: Kashimpur Date : 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 8 20 5 55 38 5 23 36 79 33 302 3 29 0 32
09-00 to 10-00 15 10 8 52 24 1 51 29 48 25 263 2 37 0 39
10-00 to 11-00 6 8 5 52 15 3 36 29 68 20 242 11 28 0 39
11-00 to 12-00 10 11 9 44 21 1 34 18 55 17 220 9 24 0 33
12-00 to 13-00 6 13 7 39 23 0 28 11 38 27 192 2 39 0 41
13-00 to 14-00 8 11 3 49 21 6 33 19 43 33 226 3 31 0 34
14-00 to 15-00 11 16 6 70 23 6 35 22 50 23 262 2 39 0 41
15-00 to 16-00 7 20 4 46 27 2 48 17 68 34 273 5 31 0 36
16-00 to 17-00 9 19 7 41 29 4 28 17 86 31 271 8 32 0 40
17-00 to 18-00 7 8 7 41 19 8 19 18 123 13 263 17 31 0 48
18-00 to 19-00 83 20 42 27 17 117 79 131 89 32 637 6 77 0 83
19-00 to 20-00 75 16 28 13 10 47 31 124 102 49 495 3 30 0 33
20-00 to 21-00 94 12 27 13 5 45 19 142 111 53 521 0 14 0 14
21-00 to 22-00 67 2 9 10 1 31 5 87 85 41 338 0 3 0 3
22-00 to 23-00 80 3 8 9 1 8 4 82 23 13 231 0 4 0 4
23-00 to 24-00 33 3 4 5 0 6 3 40 27 30 151 0 5 0 5
00-00 to 01-00 34 1 5 4 1 0 0 45 22 14 126 0 0 0 0
01-00 to 02-00 10 7 2 4 0 0 0 18 41 26 108 0 0 0 0
02-00 to 03-00 6 5 7 6 6 9 4 41 54 29 167 0 5 0 5
03-00 to 04-00 8 12 14 7 7 18 15 98 21 21 221 5 10 0 15
04-00 to 05-00 16 16 13 9 8 36 9 53 26 18 204 0 31 0 31
05-00 to 06-00 5 20 16 5 5 20 11 67 31 28 208 0 48 0 48
06-00 to 07-00 18 10 20 11 11 13 17 13 20 21 154 0 41 0 41
07-00 to 08-00 18 8 16 11 13 9 28 19 10 20 152 3 50 0 53
Total 634 271 272 623 325 395 560 1176 1320 651 6227 79 639 0 718

Appendix B - Page 34
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Bailpayl To: Bailpayl Date: 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 0 5 8 2 6 2 0 2 5 30 0 53 0 53
09-00 to 10-00 0 0 13 0 16 0 19 0 0 2 50 8 75 0 83
10-00 to 11-00 0 0 8 0 12 3 18 0 1 2 44 5 73 0 78
11-00 to 12-00 0 0 6 9 17 3 14 0 0 19 68 8 79 0 87
12-00 to 13-00 0 1 5 2 20 1 9 0 1 2 41 2 63 0 65
13-00 to 14-00 0 0 1 3 12 0 9 0 0 3 28 5 41 0 46
14-00 to 15-00 0 0 4 3 4 4 8 0 1 7 31 4 41 0 45
15-00 to 16-00 0 0 1 3 2 1 7 0 0 1 15 0 38 0 38
16-00 to 17-00 0 1 6 1 10 0 10 0 0 2 30 1 52 0 53
17-00 to 18-00 0 0 2 1 4 0 5 0 0 2 14 3 50 0 53
18-00 to 19-00 0 0 4 0 3 0 6 0 0 4 17 1 50 0 51
19-00 to 20-00 0 2 3 2 7 0 4 0 0 11 29 0 48 0 48
20-00 to 21-00 0 5 11 3 5 0 3 0 2 6 35 2 33 0 35
21-00 to 22-00 0 4 4 4 2 0 4 0 0 4 22 0 33 0 33
22-00 to 23-00 0 3 3 0 3 0 3 0 0 5 17 0 29 0 29
23-00 to 24-00 0 2 1 2 2 0 2 0 1 3 13 0 19 0 19
00-00 to 01-00 0 1 1 2 1 0 1 0 0 0 6 0 14 0 14
01-00 to 02-00 0 1 1 0 0 0 0 0 1 1 4 0 1 0 1
02-00 to 03-00 0 0 0 2 0 0 0 0 1 1 4 0 0 0 0
03-00 to 04-00 0 1 1 0 1 0 0 0 0 2 5 0 8 0 8
04-00 to 05-00 0 0 1 2 1 0 0 0 1 1 6 0 27 0 27
05-00 to 06-00 0 0 1 0 1 1 0 1 0 1 5 0 26 0 26
06-00 to 07-00 0 0 1 0 2 0 10 0 0 2 15 0 43 0 43
07-00 to 08-00 0 0 2 0 2 0 3 0 0 2 9 0 44 0 44
Total 0 21 85 47 129 19 137 1 11 88 538 39 940 0 979
PCU Value 3.00 3.00 3.00 1.00 1.00 0.75 0.75 3.00 3.00 3.00
Total PCU - 63 255 47 129 14 103 3 33 264 911
Appendix B - Page 35
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Kashimpur Date: 18.07.2016 Day: Monday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 0 0 1 1 0 0 0 0 0 2 0 1 0 1
09-00 to 10-00 0 0 0 7 2 0 0 0 0 1 10 0 3 0 3
10-00 to 11-00 0 1 0 2 1 0 1 0 0 0 5 0 3 0 3
11-00 to 12-00 0 0 0 0 4 0 1 0 0 0 5 0 1 0 1
12-00 to 13-00 0 0 0 1 0 0 1 0 0 0 2 0 3 0 3
13-00 to 14-00 0 0 0 2 1 0 0 0 0 0 3 0 2 0 2
14-00 to 15-00 0 0 0 11 0 1 1 0 0 0 13 0 2 0 2
15-00 to 16-00 0 1 0 8 1 0 0 0 0 0 10 0 1 0 1
16-00 to 17-00 0 1 1 7 0 1 0 0 0 0 10 0 4 0 4
17-00 to 18-00 0 0 0 4 0 0 1 0 0 0 5 1 6 0 7
18-00 to 19-00 0 0 0 0 0 0 1 0 0 0 1 0 1 1 2
19-00 to 20-00 0 0 0 4 0 1 0 0 0 1 6 0 2 0 2
20-00 to 21-00 0 0 1 4 0 0 0 0 0 0 5 1 0 1 2
21-00 to 22-00 0 0 0 1 2 0 0 0 0 0 3 1 1 0 2
22-00 to 23-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
23-00 to 24-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00-00 to 01-00 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0
01-00 to 02-00 0 0 0 0 0 0 0 0 0 1 1 0 1 0 1
02-00 to 03-00 0 0 0 3 0 0 0 0 0 0 3 1 0 0 1
03-00 to 04-00 0 0 0 2 0 0 0 0 0 1 3 0 1 0 1
04-00 to 05-00 0 0 1 5 0 1 0 0 0 1 8 1 2 0 3
05-00 to 06-00 0 0 0 3 1 0 0 0 0 0 4 0 1 0 1
06-00 to 07-00 0 0 0 7 2 0 1 1 1 1 13 1 2 0 3
07-00 to 08-00 0 0 0 3 1 0 0 0 0 1 5 1 0 0 1
Total 0 3 3 76 16 4 7 1 1 7 118 7 37 2 46
PCU Value 3.00 3.00 3.00 1.00 1.00 0.75 0.75 3.00 3.00 3.00
Total PCU - 9 9 76 16 3 5 3 3 21 145

Appendix B - Page 36
Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Baipayl To: Kashimpur Date 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 23 11 28 26 7 37 6 7 7 152 12 25 0 37
09-00 to 10-00 0 34 16 27 30 0 32 18 21 22 200 0 0 0 0
10-00 to 11-00 0 41 20 26 24 0 18 21 30 27 207 0 8 0 8
11-00 to 12-00 0 44 12 23 25 0 21 23 32 17 197 5 12 0 17
12-00 to 13-00 0 38 21 15 14 0 9 19 35 15 166 5 9 0 14
13-00 to 14-00 0 32 23 20 12 0 20 17 25 20 169 7 19 0 26
14-00 to 15-00 0 34 27 21 29 0 22 12 23 27 195 0 26 0 26
15-00 to 16-00 0 34 19 26 29 0 18 14 24 29 193 0 23 0 23
16-00 to 17-00 0 30 17 13 20 2 24 14 17 15 152 1 13 0 14
17-00 to 18-00 1 40 16 12 24 0 17 19 26 21 176 0 21 0 21
18-00 to 19-00 0 40 15 18 31 0 16 12 20 22 174 15 26 0 41
19-00 to 20-00 0 37 18 38 60 0 15 12 18 22 220 0 13 0 13
20-00 to 21-00 0 23 14 8 25 0 33 14 18 13 148 0 0 0 0
21-00 to 22-00 0 20 10 14 29 0 28 21 26 16 164 0 0 0 0
22-00 to 23-00 0 22 7 14 13 0 18 7 26 10 117 0 0 0 0
23-00 to 24-00 0 14 4 3 12 0 6 15 24 19 97 0 0 0 0
00-00 to 01-00 0 21 3 9 11 0 5 18 27 12 106 0 0 0 0
01-00 to 02-00 0 8 2 1 4 0 0 15 18 3 51 0 0 0 0
02-00 to 03-00 0 3 0 0 6 0 4 18 12 0 43 0 0 0 0
03-00 to 04-00 0 1 0 0 7 0 5 16 23 3 55 0 0 0 0
04-00 to 05-00 0 2 0 7 6 0 7 13 22 2 59 0 0 0 0
05-00 to 06-00 0 2 0 4 7 0 20 19 22 4 78 0 0 0 0
06-00 to 07-00 0 10 6 21 32 18 18 22 19 12 158 0 15 0 15
07-00 to 08-00 0 29 11 20 15 2 23 12 22 11 145 0 30 0 30
Total 1 582 272 368 491 29 416 377 537 349 3422 45 240 0 285

Appendix B - Page 37
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-2 From: Baipayl To:Kaliakair Date 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 42 39 18 31 55 16 35 16 12 20 284 3 7 0 10
09-00 to 10-00 130 64 29 12 56 0 11 55 63 80 500 0 5 0 5
10-00 to 11-00 60 47 14 37 56 0 14 53 41 50 372 0 15 0 15
11-00 to 12-00 99 36 26 17 34 7 25 30 28 28 330 0 5 0 5
12-00 to 13-00 107 52 22 13 51 0 22 28 15 11 321 1 2 0 3
13-00 to 14-00 78 41 21 20 50 10 27 17 22 17 303 0 1 0 1
14-00 to 15-00 44 25 9 7 49 1 22 4 21 22 204 0 0 0 0
15-00 to 16-00 72 38 26 9 35 6 28 20 23 24 281 0 0 0 0
16-00 to 17-00 77 19 15 4 38 0 20 25 18 16 232 1 2 0 3
17-00 to 18-00 80 41 16 4 30 1 23 36 31 24 286 0 2 0 2
18-00 to 19-00 82 36 29 1 19 1 10 41 21 28 268 1 0 0 1
19-00 to 20-00 99 25 31 1 31 1 13 43 35 23 302 0 0 0 0
20-00 to 21-00 107 56 15 0 22 2 2 68 39 25 336 0 3 0 3
21-00 to 22-00 92 55 21 0 9 0 2 65 33 6 283 0 0 0 0
22-00 to 23-00 102 60 11 0 4 0 4 61 24 16 282 0 0 0 0
23-00 to 24-00 66 9 11 1 3 0 1 50 17 6 164 0 0 0 0
00-00 to 01-00 67 2 17 0 3 0 2 41 16 11 159 0 0 0 0
01-00 to 02-00 41 0 8 0 1 0 2 39 24 14 129 0 0 0 0
02-00 to 03-00 38 0 7 0 5 0 0 35 27 24 136 0 0 0 0
03-00 to 04-00 31 0 0 1 3 0 1 29 33 23 121 0 0 0 0
04-00 to 05-00 21 0 0 0 4 0 0 30 24 20 99 0 1 0 1
05-00 to 06-00 20 9 0 0 3 1 0 27 35 27 122 0 0 0 0
06-00 to 07-00 22 8 8 9 11 3 4 15 7 10 97 0 1 0 1
07-00 to 08-00 22 16 5 26 38 0 5 11 15 14 152 1 4 0 5
Total 1599 678 359 193 610 49 273 839 624 539 5763 7 48 0 55

Appendix B - Page 38
Form TMC-3 Page No.3
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-3 From: Kashimpur To: Kaliakair Date 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 6 19 12 19 12 5 6 20 24 17 140 2 5 0 7
09-00 to 10-00 23 30 23 21 23 19 27 37 37 26 266 1 23 0 24
10-00 to 11-00 34 23 22 17 20 18 23 40 38 21 256 0 16 0 16
11-00 to 12-00 26 25 19 23 19 16 21 39 54 31 273 0 13 0 13
12-00 to 13-00 20 13 8 21 22 25 18 42 30 19 218 0 16 0 16
13-00 to 14-00 15 17 24 22 20 17 17 41 55 27 255 0 12 0 12
14-00 to 15-00 13 17 18 18 12 18 22 37 57 44 256 0 14 0 14
15-00 to 16-00 9 18 18 18 17 12 22 39 57 37 247 0 20 0 20
16-00 to 17-00 6 26 14 20 20 17 27 31 39 22 222 0 27 0 27
17-00 to 18-00 12 26 6 31 12 11 16 36 67 15 232 0 16 0 16
18-00 to 19-00 6 34 2 32 13 14 24 19 82 9 235 0 22 0 22
19-00 to 20-00 15 19 5 23 24 16 20 25 65 16 228 0 15 0 15
20-00 to 21-00 14 21 15 22 12 27 16 33 55 12 227 0 16 0 16
21-00 to 22-00 10 31 11 16 17 15 16 27 67 23 233 0 10 0 10
22-00 to 23-00 14 28 9 18 9 20 14 35 65 24 236 0 17 0 17
23-00 to 24-00 4 23 9 14 11 19 16 37 60 22 215 0 12 0 12
00-00 to 01-00 3 29 7 19 13 25 16 35 56 11 214 0 12 0 12
01-00 to 02-00 6 16 0 0 7 5 5 34 68 17 158 0 11 0 11
02-00 to 03-00 3 0 0 0 6 0 0 32 55 13 109 0 20 0 20
03-00 to 04-00 6 0 0 0 8 0 2 41 58 10 125 0 11 0 11
04-00 to 05-00 6 0 0 0 5 0 0 48 47 7 113 0 12 0 12
05-00 to 06-00 1 2 5 5 2 0 3 31 34 11 94 1 12 0 13
06-00 to 07-00 1 22 3 25 6 12 19 14 39 7 148 12 11 0 23
07-00 to 08-00 1 11 5 29 7 17 16 22 53 14 175 6 12 0 18
Total 254 450 235 413 317 328 366 795 1262 455 4875 22 355 0 377

Appendix B - Page 39
Form TMC-3 Page No.4
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Baipayl Date : 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 1 3 13 16 5 10 8 7 0 8 71 1 11 0 12
09-00 to 10-00 2 15 15 32 11 12 10 13 3 9 122 4 10 0 14
10-00 to 11-00 1 5 16 21 13 11 13 9 3 14 106 7 19 0 26
11-00 to 12-00 0 15 16 12 16 13 8 17 2 17 116 1 13 0 14
12-00 to 13-00 0 4 19 13 10 9 4 15 0 15 89 2 15 0 17
13-00 to 14-00 0 7 16 8 11 11 5 15 8 15 96 3 13 0 16
14-00 to 15-00 0 14 15 14 10 14 3 8 5 15 98 3 10 0 13
15-00 to 16-00 0 17 15 25 15 13 10 13 3 13 124 8 21 0 29
16-00 to 17-00 0 7 15 16 19 11 10 7 3 20 108 2 11 0 13
17-00 to 18-00 0 6 18 23 22 15 11 10 0 20 125 11 16 0 27
18-00 to 19-00 0 7 12 22 29 19 15 9 3 15 131 2 21 0 23
19-00 to 20-00 0 5 7 23 23 13 7 4 0 10 92 5 25 0 30
20-00 to 21-00 0 14 11 17 17 15 9 5 4 9 101 2 14 0 16
21-00 to 22-00 0 13 16 16 23 17 6 9 9 13 122 2 13 0 15
22-00 to 23-00 0 9 8 22 13 12 8 16 6 18 112 0 3 0 3
23-00 to 24-00 0 5 9 16 17 10 3 11 12 8 91 0 12 0 12
00-00 to 01-00 0 4 10 18 18 19 5 12 12 5 103 1 14 0 15
01-00 to 02-00 0 5 3 15 13 10 1 10 7 4 68 0 17 0 17
02-00 to 03-00 0 3 4 0 17 11 2 4 8 3 52 0 14 0 14
03-00 to 04-00 0 2 3 2 15 12 2 8 7 4 55 0 15 0 15
04-00 to 05-00 0 2 2 0 0 12 1 13 6 4 40 3 8 0 11
05-00 to 06-00 0 2 2 18 11 16 4 9 3 4 69 11 15 0 26
06-00 to 07-00 0 7 6 16 9 12 7 4 1 4 66 8 17 0 25
07-00 to 08-00 0 9 16 19 19 19 13 6 2 8 111 5 20 0 25
Total 4 180 267 384 356 316 165 234 107 255 2268 81 347 0 428

Appendix B - Page 40
Form TMC-3 Page No.5
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-5 From: Kaliakair To: Baipayl Date : 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 48 23 23 8 21 7 18 22 22 26 218 0 5 0 5
09-00 to 10-00 61 33 18 14 42 0 7 29 18 35 257 0 2 0 2
10-00 to 11-00 41 35 31 15 37 4 10 42 16 28 259 0 2 0 2
11-00 to 12-00 44 23 33 10 39 4 11 21 14 25 224 1 3 0 4
12-00 to 13-00 64 29 16 7 22 3 6 25 12 15 199 0 3 0 3
13-00 to 14-00 70 16 19 5 24 2 7 27 16 15 201 0 3 0 3
14-00 to 15-00 53 32 22 5 26 1 4 24 19 34 220 0 1 0 1
15-00 to 16-00 159 26 23 13 34 1 14 23 23 24 340 0 2 0 2
16-00 to 17-00 175 28 24 17 33 2 12 34 25 20 370 0 0 0 0
17-00 to 18-00 86 47 24 27 40 4 11 35 16 24 314 0 1 0 1
18-00 to 19-00 69 50 25 36 60 2 8 34 44 20 348 0 0 0 0
19-00 to 20-00 39 36 15 31 46 1 12 57 43 19 299 0 2 0 2
20-00 to 21-00 20 14 16 20 47 1 8 35 38 16 215 0 1 0 1
21-00 to 22-00 29 20 17 23 45 3 5 60 64 39 305 0 0 0 0
22-00 to 23-00 57 14 19 35 46 0 6 55 50 31 313 0 1 0 1
23-00 to 24-00 27 22 20 16 36 2 2 60 60 47 292 0 0 0 0
00-00 to 01-00 39 21 28 7 11 2 1 50 55 35 249 0 0 0 0
01-00 to 02-00 64 24 21 4 12 2 2 40 42 28 239 0 0 0 0
02-00 to 03-00 63 13 19 0 2 1 2 67 84 23 274 0 0 0 0
03-00 to 04-00 53 16 21 0 3 0 0 73 74 23 263 0 0 0 0
04-00 to 05-00 58 25 22 0 1 0 2 57 69 23 257 0 1 0 1
05-00 to 06-00 53 30 19 0 6 3 7 63 56 26 263 0 6 0 6
06-00 to 07-00 112 23 24 9 18 8 10 56 45 53 358 0 3 0 3
07-00 to 08-00 110 49 43 32 54 2 16 39 54 50 449 0 6 0 6
Total 1594 649 542 334 705 55 181 1028 959 679 6726 1 42 0 43

Appendix B - Page 41
Form TMC-3 Page No.6
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
Turning Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-6 From: Kaliakair To: Kashimpur Date : 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 30 31 16 15 20 16 16 36 45 20 245 8 16 0 24
09-00 to 10-00 23 36 26 26 15 41 26 61 50 40 344 9 22 0 31
10-00 to 11-00 20 29 27 20 14 18 16 49 29 28 250 5 10 0 15
11-00 to 12-00 57 27 23 23 22 36 26 43 36 27 320 9 8 0 17
12-00 to 13-00 63 27 25 27 26 21 31 42 31 24 317 9 20 1 30
13-00 to 14-00 40 18 20 14 13 17 16 33 39 23 233 6 9 0 15
14-00 to 15-00 11 28 26 11 18 27 23 38 46 24 252 7 13 0 20
15-00 to 16-00 21 22 29 15 15 21 18 54 33 19 247 6 20 0 26
16-00 to 17-00 42 39 36 17 22 25 21 49 52 56 359 7 10 0 17
17-00 to 18-00 27 26 30 25 26 25 34 48 59 34 334 17 19 0 36
18-00 to 19-00 17 37 27 14 29 17 21 48 56 39 305 7 16 0 23
19-00 to 20-00 32 25 32 15 31 22 25 59 49 34 324 4 8 0 12
20-00 to 21-00 25 25 14 13 18 15 12 57 36 35 250 3 18 0 21
21-00 to 22-00 30 19 18 18 20 23 20 61 37 24 270 4 7 0 11
22-00 to 23-00 15 17 18 20 19 24 21 67 33 26 260 0 11 0 11
23-00 to 24-00 19 32 9 0 0 10 4 50 30 19 173 0 9 0 9
00-00 to 01-00 46 25 28 29 9 27 4 73 55 29 325 3 9 0 12
01-00 to 02-00 24 7 19 17 10 2 2 45 42 23 191 0 2 0 2
02-00 to 03-00 9 3 8 7 5 3 4 25 24 12 100 0 1 0 1
03-00 to 04-00 6 3 7 5 5 3 6 45 41 17 138 0 0 0 0
04-00 to 05-00 25 16 14 16 14 7 10 43 38 17 200 5 4 0 9
05-00 to 06-00 19 24 18 21 15 13 11 46 39 25 231 5 8 0 13
06-00 to 07-00 65 28 45 22 18 24 21 56 45 27 351 6 18 0 24
07-00 to 08-00 35 25 35 18 18 19 15 41 38 28 272 4 14 0 18
Total 701 569 550 408 402 456 403 1169 983 650 6291 124 272 1 397

Appendix B - Page 42
Form TMC-3 Page No.1
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-1 From: Baipayl To: Baipayl Dated 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.
1 2 3 4 5 6 7 8 9 10 11 12 13
Utility
Heavy Medium
Large Bus/ /Jeep/ Small
Auto Truck/ Truck/ Rickshaw
Double Small Laguna Car/Taxi Truck/ Total Animal Total Non
Time Medium Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Tempo /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus /Maxi/ Wagan /Small Cart
Michuk /Truck 3 Truck 2 Van
Bus Human Van
axle axle
Hauler
08-00 to 09-00 0 0 3 0 4 16 4 0 0 0 27 1 12 0 13
09-00 to 10-00 0 0 0 0 7 7 2 0 0 0 16 0 8 0 8
10-00 to 11-00 0 0 2 0 1 0 0 0 0 0 3 0 0 0 0
11-00 to 12-00 0 0 0 0 3 2 8 0 0 0 13 0 12 0 12
12-00 to 13-00 0 0 0 0 6 0 3 0 0 0 9 0 17 0 17
13-00 to 14-00 0 0 0 0 4 0 3 0 0 0 7 0 14 0 14
14-00 to 15-00 0 0 0 0 5 0 0 0 0 0 5 0 15 0 15
15-00 to 16-00 0 0 1 1 3 0 0 0 0 0 5 0 10 0 10
16-00 to 17-00 0 0 4 1 5 1 1 0 0 2 14 0 36 0 36
17-00 to 18-00 0 0 2 0 6 0 5 0 0 0 13 0 17 0 17
18-00 to 19-00 0 0 9 0 10 0 4 0 0 0 23 1 11 0 12
19-00 to 20-00 0 0 0 0 4 0 10 0 0 0 14 1 26 0 27
20-00 to 21-00 0 0 3 0 7 0 13 0 0 0 23 7 31 0 38
21-00 to 22-00 0 0 3 0 7 0 8 0 0 0 18 3 15 0 18
22-00 to 23-00 0 0 6 0 8 0 5 0 0 0 19 1 11 0 12
23-00 to 24-00 0 0 3 0 4 0 4 0 0 0 11 4 4 0 8
00-00 to 01-00 0 0 4 0 6 0 7 0 0 1 18 4 2 0 6
01-00 to 02-00 0 0 3 0 5 0 7 0 0 0 15 5 7 0 12
02-00 to 03-00 0 0 5 0 8 0 6 0 0 0 19 8 9 0 17
03-00 to 04-00 0 0 0 0 1 0 1 0 0 0 2 5 12 0 17
04-00 to 05-00 0 0 1 0 3 0 5 0 0 0 9 2 10 0 12
05-00 to 06-00 0 0 1 0 6 0 6 0 0 0 13 4 9 0 13
06-00 to 07-00 0 0 0 5 0 5 0 10 0 0 20 9 20 0 29
07-00 to 08-00 0 0 0 8 0 0 0 8 0 0 16 7 15 0 22
Total 0 0 50 15 113 31 102 18 0 3 332 62 323 0 385

Appendix B - Page 43
Form TMC-3 Page No.2
Traffic Survey for Feasibility Study for the Construction of Dhaka Ashulia Elavated Expressway
Daily Summary Sheet
U Turn Movement Mannual Count
Name of Intersection: Chandra Turning Movement No:-4 From: Kashimpur To: Kashimpur Dated 22.07.2016 Day: Friday
Weather: Sunny/Fair/Cloudy/Rainy Duration: 24 hrs.

1 2 3 4 5 6 7 8 9 10 11 12 13
Utility Heavy Medium
Large Bus/ Small
/Jeep/ Auto Truck/ Truck/ Rickshaw
Double Small Car/Taxi Truck/ Total Animal Total Non
Time Medium Laguna Rickshaw, Motor Trailer/ Truck (Cycle)/
Decker/ Bus/ /Station Pickup Motorized Bicycle Cart /Push Motorized
Bus /Tempo CNG/ Cycle Container Lorry/ Rickshaw
Articulated Micro Bus Wagan /Small Cart
/Maxi/ Michuk /Truck 3 Truck 2 Van
Bus Van
Human axle axle
08-00 to 09-00 0 0 0 9 1 2 0 0 1 3 16 1 4 0 5
09-00 to 10-00 0 1 1 5 0 4 1 0 1 0 13 2 6 0 8
10-00 to 11-00 0 0 0 4 0 0 2 0 0 0 6 4 4 0 8
11-00 to 12-00 0 1 0 6 0 0 2 1 0 0 10 1 4 0 5
12-00 to 13-00 0 0 2 1 0 0 3 0 0 1 7 1 5 0 6
13-00 to 14-00 0 1 0 5 0 3 0 0 0 2 11 2 2 0 4
14-00 to 15-00 0 0 3 1 0 3 3 3 0 0 13 2 3 0 5
15-00 to 16-00 0 0 2 1 3 2 1 1 0 0 10 4 3 0 7
16-00 to 17-00 0 0 0 3 1 1 5 0 0 0 10 0 6 0 6
17-00 to 18-00 0 1 0 4 1 4 2 0 0 0 12 2 9 0 11
18-00 to 19-00 0 2 0 4 0 2 4 0 0 0 12 0 7 0 7
19-00 to 20-00 0 0 1 5 0 2 6 0 0 0 14 1 4 0 5
20-00 to 21-00 0 0 1 6 1 0 1 0 0 3 12 1 3 0 4
21-00 to 22-00 0 1 1 2 1 4 5 0 0 3 17 5 3 0 8
22-00 to 23-00 0 3 3 0 2 3 6 0 0 0 17 3 5 0 8
23-00 to 24-00 0 3 2 2 1 3 4 2 0 5 22 1 3 0 4
00-00 to 01-00 0 1 4 1 4 1 3 0 0 6 20 0 4 0 4
01-00 to 02-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
02-00 to 03-00 0 3 2 1 1 4 2 0 0 3 16 1 0 0 1
03-00 to 04-00 1 1 2 1 2 5 1 0 2 3 18 2 0 0 2
04-00 to 05-00 2 0 3 4 0 1 2 0 0 4 16 1 0 0 1
05-00 to 06-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
06-00 to 07-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
07-00 to 08-00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 3 18 27 65 18 44 53 7 4 33 272 34 75 0 109

Appendix B - Page 44