0% found this document useful (0 votes)
250 views14 pages

Basic Guidelines On Mission Amrit Sarovar Implementation at MoRT&H - Reg. - 0001

Basic Guidelines on Mission Amrit Sarovar Implementation at MoRT&H - Reg._0001

Uploaded by

Venkat Talupula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
250 views14 pages

Basic Guidelines On Mission Amrit Sarovar Implementation at MoRT&H - Reg. - 0001

Basic Guidelines on Mission Amrit Sarovar Implementation at MoRT&H - Reg._0001

Uploaded by

Venkat Talupula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 14
RW/NH-33044/33/2022-SGR (P&B) Government of India Ministry of Road Transport & Highways (SER Zone) ‘Transport Bhawan, 1, Parliament Street, New Dethi-110001 Dated: 12" July, 2022 OFFICE MEMORANDUM Subject: - Basic guidelines on Mission Amrit Sarovar implementation at MoRT&H - reg. Please find enclosed “Basic Guidelines on Mission Amrit Sarovar implementation at MoRT&H” for immediate necessary action by all ROs. “Basic User Guide for Amrit Sarovar Online Portal” is also enclosed and links for Complete Guidelines and Joint Advisories including details of portal and concerned persons for technical support are annexed. ii) Amirit Sarovars are proposed to be constructed in the vicinity of the infrastructure projects (which require earth) and the material dug out from Amrit Sarovar shall be utilized for civil work. ii) District Magistrates may be approached immediately for selection of suitable site for construction of Amrit Sarovars. The minimum size of each Sarovar shall be 1 (one) Acre and minimum distance from adjacent Sarovar should be maintained 100 m. iv) After selection of the site, the Amrit Sarovar shall be mapped by the ROs in the “Amrit Sarovar Online Portal” with requisite field information. ¥) The soil/earth of the Sarovar site needs to be tested to ascertain its suitability in respect of all relevant parameters/specification for construction of embankments in National Highways. In case the excavated soil is not suitable for embankment material, fresh location may be explored. vi) The progress of work for each Amrit Sarovar needs to be updated on daily basis on the prescribed Mobile App with the help of District Administration and respective Gram Panchayat. The activities to be carried out for creation of Amrit Sarovars are (a) Digging of soil from the identified site, (b) Dumping of the excavated soil at National Highway site, (c) Creation of channels for movement of water towards the Sarovars, and (d) Plantation around the Sarovar. Encl: cl: as above Je (Santesh Prakash) Executive Engineer (SER) (R) For DG (RD) & SS. P.T.O To, 1, All Regional Officer (MoRTH) Copy to: i, Sr. PPS to ADG (Nodal) ji. Sr. PPS to ADG (S&R) iii, PA to SE (S&R) { Hy { val SoS es (Santosh Prakash) Executive Engineer (S&R) (R) For DG (RD) & SS. Annexure The Guidelines and Joint Advisories issued by MoRD, MoRTH, DoWR and Railway Board listed below for complete instructions on implementation of Mission Amrit Sarovar: 1) GUIDELINES on Mission Amrit Sarovar: https: //ncog. gov. in/AmritSarovar /AmritSarovarGuidelines. pdf 2) AMRIT SAROVAR PORTAL User manual: https://ncog. gov. in/AmritSarovar /UserManualAmrutSarovar.pdf 3) Joint Advisory Amrit Sarovar: https: //ncog. gov. in/AmritSarovar /JointAdvisoryAmritSarovar.pdf 4) Supplementary Advisory on Mission Amrit Sarovar: https: //ncog.gov.in/AmritSarovar /SupplementaryAdvisoryAmritSarovar.pdf 5) Joint Advisory of MoRD, MoRTH, DoWR & Railway Board on Amrit Sarovar 19.05.2022 https: / /ncog.gov.in/AmritSarovar/Joint%20Adv%200f%20RD,%20RTH, ¥20WR%208%2 ORB%200n%20Amrit%20Sarovar%2019.05.2022.pdf Link to the Amrit Sarovar Online Portal: https: //amritsarovar.ncog.gov.in In case of any further queries please approach the Helpline number for technical support-- contact the following- 1. Ms. Gunjan Kanwar - +91 79821 61774, 2. Ms. Maheshwari - +91 99252 30389 3. Ms. Neelu - +91 7838659562 4, Mr. Kunal Patel - +91 9909945028 1706146/2022/S&R(Bridge) Basic Guidelines on Mission Amirt Sarovar implementation at MoRTH A. Introduction: Mission Amrit Sarovar: With a view to conserve water for the future, the Prime Minister has launched a new initiative named Mission Amrit Sarovar on 24th April 2022. B, Amrit Sarovar Online Portal: https: //amritsarovar.ncog.gov.in Mission Amrit Sarovar Denne ee ec cuG SE Cece cla nrit Sarovar Mission C. Login Credentials: Login ID for MoRTH: MoRTH, Password: RTH@Amrit2022 Login ID for NHAI: NHAol, Password: 22AmritSNHAI Login for NHIDCL: NHIDCL Password: Nhidel$Amrit22, ‘A basic User Guide is attached as Annexure - 1. The detailed USER MANUAL and other important documents and guidelines can be obtained from the Home page of Amrit Sarovar Online Portal under the DOWNLOADS tab. 706146/2022/S&R(Bridge) Important instructions regarding the data updation: 4) Changes in the portal: The portal has been updated with the provision to select the agency while entering the Sarovar data. 2) Amrit Sarovar Mobile App: The status of each sarovar can be tracked and updated through mobile app after successful entry in the Online Portal. 3) Technical Training and Handholding: MoRD along with BISAG-N providing trainings and handholding sessions to the State/District/ Panchayat Level officers on the Online Protal and Mobile App. 4) Escalation process and resolution of the technical issues: MoRD has created separate WhatsApp groups at State/District/ Panchayat Level for the Nodal officer to address and resolve the issues/challenges encountered at the ground level on priority basis. | _ State Level WhatsApp Group consists of Commissioners of SIRDs 7 District Level WhatsApp Group consists. of DMs/ADMs 5) Reports: Agency specific reports/dashboard for MoRTH, NHAl and NHIDCL for internal monitoring are available. 6) For any further queries please contact: 4) Sh. AK Tandon, Consultant, WBTA, MoRTH Cell: 9654023705, Email: akt.wbta@gmail. 2) Sh. Ganesh KVVSS, Consultant, 0/0 AS(H), MoRTH Cell: 8179249456, Email: [email protected], [email protected] 1706146/2022/S&R(Bridge) Amrit Sarovar Online Portal Basic User Guide Ministry of Road Transport and Highways 1706146/2022/S&R(Bridge) https://amritsarovar.n Mission Amrit Sarovar = MoRTH Oe @¢ aE cog.gov.in 21 1706146/2022/S&R(Bridge) Use “Navigation” to select the village 22 1706146/2022/S&R(Bridge) Click “Add Sarovar” and draw the polygon Dipset sell Zeleat Wests} as 1706146/2022/S&R(Bridge) Enter Sarovar details in the form = PO Empioyment Generc Approx Exp “Select 24 1706146/2022/S&R(Bridge) Select the respective agency and “Submit” ne Oi Serove i pprox Expencltura(Re.)* 1706146/2022/S&R(Bridge) Use “Reports ” section to verify the Sarovar 26 27 1706146/2022/S&R(Bridge) Verify the sarovar details submitted Mission Amrit Sarovar = MoRTH Sarovar Data Identified Sites tor Ongoing Works Amrit Sarovar ~| Taluka -seect-- » Vilage! -- sect.» ee " {a No. Stote Coe) Beles} Latitude ern ED wa ANA Karnal carnal 3 2978187 2 episHA Kenduinar Sara N28 2igosoased 1706146/2022/S&R(Bridge) Thank You 2

You might also like