Surat Pernyataan Kepemilikan Barang

Uploaded by

bungsu studio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views5 pages

Surat Pernyataan Kepemilikan Barang

Uploaded by

bungsu studio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

LAMPIRAN

PACKING LIST
Packing List Number : 001/PL/WRK/X/2024
Shipping Date : 15 Oktober 2024

Ship From : Ship To :


Dermaga Tongkang PT. Wika Beton PT. Wijaya Karya Rekayasa Konstruksi
Lampung Selatan Proyek Pembangunan Jetty Multipurpose
Link Maps: Wanam, Merauke
https://maps.app.goo.gl/23geDXCjkANt5gxJA
Contact : Contact :
- Wira Hadi (+62 812-4777-6010)

Shipping Method : Tongkang (Laut) Date : 15 Oktober 2024


Item Description QTY Unit Unit Weight (Kg) Weight (Kg)

1 Spun Pile (D 800)


Spun Pile D800 A2 Buttom L20 224,00 Btg 12.800 2.867.200
Spun Pile D800 A2 Buttom L20 221,00 Btg 12.800 2.828.800
Spun Pile D800 A2 Buttom L16 20,00 Btg 10.240 204.800
Spun Pile D800 A2 Buttom L12 20,00 Btg 7.680 153.600
Spun Pile D800 A2 Buttom L6 18,00 Btg 3.840 69.120
6.123.520

2 Container 40ft
Material Temporary Facility 5,00 Unit 30.000 150.000
Spec : 5 Unit @40ft

3 Container 20ft
Container Site Office 2,00 Unit 20.000 40.000
Spec : 2 Unit @20ft

4 Rebar (Besi Beton)


Rebar Bombana 385.000
Rebar Wanam 101.000

5 Tandon Air Kosong (Wanam)


Tandon Air 1000 L @20 bh 1.000
Total Weight (kg) 6.800.520
Total Weight (Ton) 6.801
Dokumentasi

MATERIAL SPUN PILE

CONTAINER 40FT & 20FT


Dokumentasi

TANDON AIR 1000 LITER

MATERIAL REBAR
SHIPMENT #1 | Spun Pile 1st & Material (Lampung – Wanam)

Material
Temfas

SIDE BOARD

1 2 3 4
Total Total Total
Jumlah Akumulative Berat/m Total Berat Jumlah Akumulative Berat/m Total Berat Jumlah Berat
Tabel 1 Jenis Panjang Ket Tabel 3 Jenis Panjang Ket N0. Jenis Unit Berat Ket
(bh) (bh) (kg) (kg) (bh) (bh) (kg) (kg) (bh) (ton)
(m) (m) (ton)
Level 1 Middle D800 20 30 30 640 600 384.000 Horizontal 1. Berat Spun Pile m' 9.604 0,64 6.123
Level 1 Bottom D800 20 30 30 640 600 384.000 Horizontal
Level 2 Middle D800 20 30 60 640 600 384.000 Horizontal 2. Container 40 ft bh 5 30 150
Level 2 Bottom D800 20 30 60 640 600 384.000 Horizontal
Level 3 Middle D800 20 30 90 640 600 384.000 Horizontal 3. Container 20 ft bh 2 20 40
Level 3 Bottom D800 20 30 90 640 600 384.000 Horizontal Level 4 Middle D800 20 30 120 640 600 384.000 Horizontal 4. Besi Beton Bombana 385
Level 4 Bottom D800 20 30 120 640 600 384.000 Horizontal Middle D800 20 25 145 640 500 320.000 Horizontal 5. Besi Beton Wanam 101
Level 5
Level 5 Bottom D800 20 30 150 640 600 384.000 Horizontal Middle D800 16 5 150 640 80 51.200 Horizontal 6. Tandon Air 1000 L unit 20 0,05 1
Total (kg) 1.920.000 Total (kg) 1.907.200 Total Berat (ton) 6.801

Total Total
Jumlah Akumulative Berat/m Total Berat Jumlah Akumulative Berat/m Total Berat
Tabel 2 Jenis Panjang Ket Tabel 4 Jenis Panjang Ket
(bh) (bh) (kg) (kg) (bh) (bh) (kg) (kg)
(m) (m)
Level 1 Bottom D800 20 30 30 640 600 384.000 Horizontal
Level 1 Middle D800 16 15 15 640 240 153.600 Horizontal
Level 2 Bottom D800 20 30 60 640 600 384.000 Horizontal
Middle D800 12 15 30 640 180 115.200 Horizontal
Bottom D800 20 14 74 640 280 179.200 Horizontal
Level 3 Level 2 Middle D800 12 5 35 640 60 38.400 Horizontal
Middle D800 20 16 90 640 320 204.800 Horizontal
Level 4 Middle D800 20 30 120 640 600 384.000 Horizontal D800 8 15 50 640 120 76.800 Horizontal
Level 5 Middle D800 20 30 150 640 600 384.000 Horizontal Level 3 Middle D800 8 3 53 640 24 15.360 Horizontal
Total (kg) 1.920.000 Total (kg) 399.360