KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 2 of 11
ELECTRICAL BULK MATERIALS
TRACK CHANGES
No Rev. Content of Change Note
1 A Issued for Review
2 0 Issued for Approval
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 3 of 11
ELECTRICAL BULK MATERIALS
TABLE OF CONTENTS
1 INTRODUCTION ......................................................................................................................4
1.1 Purpose of Document .......................................................................................................5
1.2 Definition and Abbreviation ...............................................................................................5
1.2.1 Definition .................................................................................................................5
1.2.2 Abbreviations...........................................................................................................6
1.2.3 Project Documents ..................................................................................................7
1.3 Language ..........................................................................................................................8
1.4 Units of Measures .............................................................................................................8
2 SCOPE OF VENDOR’S SUPPLY ............................................................................................8
2.1 Equipment / Material .........................................................................................................8
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 4 of 11
ELECTRICAL BULK MATERIALS
1 INTRODUCTION
Kinh Ngu Trang and Kinh Ngu Trang Nam fields belong to Block 09-2/09 in Cuu Long Basin
offshore southern Vietnam. Kinh Ngu Trang field locates in distance approximately 150km from
Vung Tau city, 40 km from the East of White Tiger field, 14 km from Rang Dong field and 25 km
from Ca Ngu Vang field. Kinh Ngu Trang Nam field locates in distance 3.5km from Kinh Ngu
Trang field. Sea water depth at the Kinh Ngu Trang and Kinh Ngu Trang Nam locations is
approximately 65m.
Figure 1: Location of KNT/KTN fields at Block 09-2/09
The development of Block 09-2/09 was started since 2019 when Petroleum Sharing Contract
(PSC) was signed between JV Vietsovpetro (VSP) 40%, PVEP- 30% and AO Zerubezhneft-
30%. VSP took the operatorship of Block 09-2/09.
The field development of Kinh Ngu Trang and Kinh Ngu Trang Nam consists of installation of
two (02) offshore platforms namely CPP KNT and WHP KTN, in-field pipelines, inter-field
pipelines, submarine cable and modification on the existing platforms at White Tiger Field. The
CPP KNT will be located at Kinh Ngu Trang field and designed as a Central Processing Platform,
equipped with full process and utility facilities to ensure the safe and effective oil & gas
production of Block 09-2/09. WHP KTN will be located at Kinh Ngu Trang Nam field and will be
designed as an unmanned wellhead platform, which is monitored and controlled remotely from
CPP KNT. The production fluid of Kinh Ngu Trang and Kinh Ngu Trang Nam fields will be
gathered and processed on CPP KNT to meet the export conditions and self-sufficiently supply
of the gaslift, fuel gas and electrical power for internal field’s demands. After the processing on
CPP KNT, including separation, heating, compression and pumping, the mixture of gas and
liquid will be transported to MSP-10 platform at White Tiger field via 38.8 km of subsea pipeline.
At MSP10, the oil gas mixture from CPP KNT will be routed to new process facilities to separate
the liquid and gas, conduct the allocation measurement before export the gas to MKS platform
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 5 of 11
ELECTRICAL BULK MATERIALS
for compression, liquid to CPP2/CPP3 for further processing to meet the commercial
requirement before offloading. The water injection for Kinh Ngu Trang and Kinh Ngu Trang Nam
fields will be supplied from BK-15 platform on White Tiger field via 35.8 km of subsea pipeline.
In addition, to ensure the power supply capacity for serving the connection of Kinh Ngu Trang
& Kinh Trang Nam fields, a modification for installation of new transformer sub-station 2500 KVA
on MSP9 platform will be conducted. The power supply to MSP10 platform via the existing
submarine cable 6.3 kV MSP9-MSP10.
Scheme of Kinh Ngu Trang and Kinh Ngu Trang Nam field development is shown in figure 2.
Figure 2: Location of KNT/KTN fields at Block 09-2/09
The field development of Kinh Ngu Trang and Kinh Ngu Trang Nam is intended to allow for the
installation of offshore facilities in 2023-2024 years, and have First Oil in 4th Quarter of 2024.
1.1 Purpose of Document
This Document defines the requirements for Vendor in supply of electrical bulk materials
installed on KTN Wellhead Platform. This Purchase Requisition shall be read with all standard
drawings and project specifications specified in this document.
1.2 Definition and Abbreviation
1.2.1 Definition
PROJECT KINH NGU TRANG – KINH NGU TRANG NAM FIELD
DEVELOPMENT, BLOCK 09-2/09
SUB-PROJECT WHP KTN
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 6 of 11
ELECTRICAL BULK MATERIALS
COMPANY VIETSOVPETRO JOINT VENTURE [VSP]
ENGINEERING RESEARCH AND ENGINEERING INSTITUTE [REI]
CONTRACTOR
CONTRACTOR Party which carries out all or part of the design, engineering,
procurement, construction and commissioning of the project
VENDOR (or SUPPLIER) The person, group or organization responsible for the design,
manufacture, testing and load-out/shipping, installing of the
equipment
SUB-VENDOR The person, group or organization who may be employed by
the Vendor to provide services for the design, manufacture,
testing and load-out/shipping, installing of the equipment or to
provide materials, sub-components and sub-assemblies for
incorporation in the equipment packages
THIRD PARTY An Independent 3rd Party Certifying Authority appointed by
Vendor approved by the Company for certifying specific
equipment/equipment packages fabricated at Vendor’s shop
INSPECTOR Company appointed person, group or organization acting in
behalf of the Company responsible for inspection and witness
testing of equipment/ equipment packages at Vendor’s shop
CERTIFYING AUTHORITY Independent agency contracted by the Company to provide
(CA) Classification/ Certification services to Field Development
Project’s facilities from design review to construction &
commissioning (start up) in accordance with CA Rules &
Regulations, applicable Codes, Standards & Vietnamese
Register (VR) Regulations.
May Indicates possible course of action.
Shall Indicates mandatory requirements
Should Indicates preferred course of action.
1.2.2 Abbreviations
CA Certifying Authority
FAT Factory Acceptance Test
ITP Inspection Test Plan
WHP KTN Kinh Ngu Trang Nam Wellhead Platform
KNT CPP Kinh Ngu Trang Centre Processing Platform
LV Low Voltage
HV Hight Voltage
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 7 of 11
ELECTRICAL BULK MATERIALS
AC Alternating Current
DC Directing Current
ESD Emergency Shutdown
RMU Ring Main Unit
MCC Motor Control Center
MDRB Manufacturing Data Record Book
NDE Non-Destructive Examination
QCP Quality Control Plan
P&ID Piping and Instrumentation Diagram
PMI Positive material identification
PO Purchase Order
PWHT Post Weld Heat Treatment
SAT Site Acceptance Test
SIL Safety Integrity Level
TPI Third Party Inspector
UPS Uninterruptible Power Supply
VDB VENDOR Data Book
VDRL VENDOR Data Requirements List
1.2.3 Project Documents
Documents listed below shall make an integral part of this requisition:
KTN-002-TS-ES2-DB-001 Electrical Design Basis
KTN-002-TS-ES2-SP-010 Specification for Electrical Cables
KTN-002-TS-ES2-SP-011 Specification for Electrical Requirement for Packaged
Equipment
KTN-002-TS-ES2-SP-012 Specification for Electrical Bulk Materials
KTN-002-TS-ES2-SD-001 Electrical Overall Single Line Diagram
KTN-002-TS-ES2-SD-004 Single Line Diagram for LV Switchboard/MCC
KTN-002-TS-ES2-DW-003 Electrical Equipment Layout
KTN-002-TS-ES2-DW-004 Electrical Cable Tray/Ladder Layout in the Rooms
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 8 of 11
ELECTRICAL BULK MATERIALS
KTN-002-TS-ES2-DW-007 Electrical Cable Tray/Ladder Layout for Decks
KTN-002-TS-ES2-DW-009 Electrical Cable Routing Layout for Decks
KTN-002-TS-ES2-DW-012 Electrical MCT Layout
KTN-002-TS-ES2-DW-014 Lighting and Small Power Layout for Decks
KTN-002-TS-ES2-DW-015 Earthing Layout for Decks
KTN-002-TS-ES2-CA-004 Lighting Calculation
KTN-002-TS-ES2-SCH-001 Electrical Cable Schedule
1.3 Language
All technical documentation is to be in the English language. The project language is English
and Vietnamese.
1.4 Units of Measures
The design shall be performed using the SI system units.
2 SCOPE OF VENDOR’S SUPPLY
2.1 Equipment / Material
Equipment and Materials to be covered by this Requisition are as listed in the table below:
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 9 of 11
ELECTRICAL BULK MATERIALS
No. Description Unit Q.ty Remarks
Cables
(Refer to doc. KTN-002-TS-ES2-SP-011 Specification
I for Electrical Bulk Materials
Refer to doc. KTN-002-TS-ES2-SCH-001 Electrical
Cable Schedule)
The low voltage (P1 type) 600/1000V flame retardant, mud
resistance, Tinned Copper Wire Braided (TCWB) multi-
core/single core power cables and control circuit cables for
indoor/ outdoor hazardous and non-hazardous areas,
constructed as per document number: KTN-002-TS-ES2-
SP-001 - Specification for Electrical Cable, shall be
Cu/EPR/LSZH/TCWB/SHF2 Mud, construction as follows:
- Conductor: tinned annealed stranded copper as per
IEC 60228, Class 2.
1 - Insulation: EPR to IEC 60092-360.
- Core identification: By colour code.
- Bedding/Inner sheath: LSZH compound to IEC 60092-
360.
- Armour: Tinned Copper Wire Braided (TCWB).
- Outer sheath: Extruded layer of flame retardant to IEC
60332-3 Cat. A (reduced propagation), LSZH SHF2
mud outer sheath compound to NEK 606.
- Requirement: IEC 60092-350, IEC 60092-360, IEC
60092-353, IEC 60228, IEC 60332-3 Cat. A, IEC 60754,
IEC 61034, NEK 606.
1.1 2C+E х 2.5 mm2 m 300
1.2 2C+E х 4 mm2 m 100
1.3 4C х 50 mm2 m 100
1.4 4C х 185 mm2 m 50
150/250(300)V Pair/Triad cables shall be heat resistant, oil
resistant, and flame retardant to IEC 60332-3-22. These
cables shall be designed for zero halogen and low smoke,
flame retardant, individual and collective screened. The
cable shall be EPR/TCWB/SHF2 mud, rated 90oC and
constructed as follows:
- Conductor: High conductivity, flexibly multi-stranded,
2 tinned circular copper, Class 2 to IEC 60228
- Insulation: EP-rubber (EPR), in according to IEC 60092-
360
- Pair/ Triple twisting: Colour coded cores twisted together
and wrapped with polyester tape. Pairs/triples are
identified by numbers printed directly on the insulated
conductors. Individual screen and collective screened w/
copper polyester tape.
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 10 of 11
ELECTRICAL BULK MATERIALS
No. Description Unit Q.ty Remarks
- Inner covering: Flame retardant and halogen-free
thermoset compound.
- Amour: Tinned annealed copper wire braid (TCWB).
- Outer sheath: Flame retardant, halogen-free and oil
resistant thermoset compound, SHF2 mud.
Requirement: IEC 61892, IEC 60092-350, IEC 60092-376,
IEC 60228, IEC 60092-360, IEC 60332-3-22 Cat. A, IEC
60754-1/2, IEC 61034-1/2.
2.1 2P x 1.5 mm2 M 35
2.2 12P x 1.5 mm2 M 85
2.3 12T x 1.5 mm2 M 35
II Materials and Tools
Compression Metric Lugs
Tinned copper compression lug, single stud hole, non-
1
insulated, ring type (core cross-section, mm2/hole
diameter, mm):
1.1 4 mm2/ M6 Stud Hole size pcs 300
1.2 6 mm2/ M8 Stud Hole size pcs 15
1.3 25 mm2/ M8 Stud Hole size pcs 65
1.4 35 mm2/ M8 Stud Hole size pcs 20
1.5 50 mm2/ M8 Stud Hole size pcs 15
1.6 120 mm2/ M12 Stud Hole size pcs 20
1.7 185 mm2/ M16 Stud Hole size pcs 100
Cable Gland
III (Refer to doc. KTN-002-TS-ES2-SP-011 Specification
for Electrical Bulk Materials)
Nickel-plated brass cable gland suitable for tinned copper
wire braid cable, non-hazardous area, compression type,
1
minimum IP56, complete with locknut, sealing washer and
earth tag.
1.1 Thread size: M20 (OD: 12.5mm - 20.5mm) Pcs 100
1.2 Thread size: M32 (OD: 22mm - 33mm) Pcs 5
1.3 Thread size: M40 (OD: 28mm - 41mm) Pcs 5
Nickel-plated brass cable gland shall be dual certified
2
Ex’d’, Ex’e’ suitable for Zone 1, 2, IIA, T3 hazardous area
____________________________________________________________________________________
KINH NGU TRANG – KINH NGU TRANG NAM KTN-003-TS-ES2-RQ-001
FIELD DEVELOPMENT, BLOCK 09-2/09
WHP KTN
PURCHASE REQUISITION FOR TOP-UP 2 Rev. 0 Page 11 of 11
ELECTRICAL BULK MATERIALS
No. Description Unit Q.ty Remarks
applications and tinned copper wire braid cable,
compression type with a flameproof seal on the cable
inner bedding an environmental seal on the cable outer
sheath, minimum IP56, complete with locknut, sealing
washer and earth tag.
2.1 Thread size: M20 (OD: 12.5mm - 20.5mm) Pcs 100
2.2 Thread size: M25 (OD: 16.9mm - 26mm) Pcs 30
2.3 Thread size: M32 (OD: 22mm - 33mm) Pcs 10
2.4 Thread size: M40 (OD: 28mm - 41mm) Pcs 5
IV Multi Cable Transits (MCT)
MCT shall be fire rated resistant type, suitable for offshore
installation. MCT frames are primed mild steel suitable for
offshore application, minimum MCT fire rating shall be
1hour A60 rated. Refer to Doc. KNT-002-TS-ES2-SP-011
Specification for Electrical Bulk Materials and KNT-002-
TS-ES2-DW-011 Typical Electrical Installation Standard
for details.
1 MCT FRAME - Primed Mild Steel
1.1 S4 x 1, frame opening: 1 Packing space: 120mm x 120mm Pcs 2
1.2 S6 x 1, frame opening: 1 Packing space: 120mm x 180mm Pcs 1
S6 x 2, frame opening: 2 Packing space for each opening:
1.3 Pcs 1
120mm x 180mm
2 MCT Modules
2.1 RM 30 (OD Cable: 10-25mm) Pcs 66
2.2 RM 60 (OD Cable: 28-54mm) Pcs 12
2.3 RM 90 (OD Cable: 48-71mm) Pcs 2
3 Wedge 120 Ex, SS316 metal Material Pcs 6
4 Stay plate width 120mm, SS316 Material Pcs 23
V STEEL SUPPORT
1 Equal Angle Bar, ASTM A36 (W x H x THK)
1.1 L75mm x 75mm x 6mm m 120
1.2 L50mm x 50mm x 5mm m 60
____________________________________________________________________________________