LVAC Load Survey and Generating Set Sizing Study
LVAC Load Survey and Generating Set Sizing Study
September 2014
Table of Contents
Executive Summary .............................................................................................................. 2
Table of Contents ................................................................................................................. 3
1. Introduction ..................................................................................................................... 4
2. LVAC Load Survey.......................................................................................................... 4
2.1. Assumptions and Comments............................................................................... 4
2.2 Previous Load Analysis ....................................................................................... 5
2.3 Load Analysis ...................................................................................................... 5
2.4 Provision for Future Loads .................................................................................. 5
3. Generating Set Sizing Studies ........................................................................................ 6
Scenario B1: Existing Site Load ...................................................................................... 6
Scenario B2: ISS Load Only............................................................................................ 7
Release Information .............................................................................................................. 8
Revision History .................................................................................................................... 8
Contact Details ..................................................................................................................... 8
Appendix A: LV Load Survey ................................................................................................ 9
Appendix B: Generating Set Sizing Studies ........................................................................ 10
Scenario B1: Existing Site Load .....................................................................................10
Scenario B2: ISS Load Only...........................................................................................11
1. Introduction
An LVAC Load Survey and Generating Set Sizing Study has been undertaken at NG
Keadby to determine if the existing Generating Set and LVAC system are large
enough to support the proposed load for the forthcoming ISS system.
Please remember that this is a calculation of WORST CASE load and may
represent a figure substantially larger than any load experienced on the site.
It is also known that Flood Defence are to visit this site but no information is available
for the loads for this equipment.
Release Information
Name Date
Author K Marshall 12-Sep-14
Checked By V Law 12-Sep-14
Approved By K Marshall 12-Sep-14
Revision History
Rev Date Details
A 12-Sep-14 First Release
Contact Details
Sheaf Power Limited
Wardpower Works
Wicker Lane
Sheffield
S3 8HQ
Tel: 0114 273 8855
E-mail: [email protected]
Web www.wardpower.co.uk
Note: In the following reports, Actual Loads given are after Demand Factor but are before diversity and do not include any loads from Sub-Distribution
Where a phase for a single phase load has not been identified, L1 is assumed. This is shown by an italic value for L1.
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Control Building
1 LVAC Room Heating Density: 20.9 (W/m2)
Lighting Density: 0.6 (W/m2)
2KW Dimplex Wall Heater 3 Heating 32.5 0.0 0.0 80% 80% Fixture Count
415V LVAC Panel 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
58W Single Tube 12 Lighting 3.8 0.0 0.0 80% 80% Fixture Count
Deakin 48V/15A BC 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. BC4 = QB2
Deakin 48V/15A BC 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. BC3 = QB1
Erskine 110V/15A BC 1 110V Battery Charger 9.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. Unable to
ascertain rating, input device rating used.
Small Power Ring 1 Power 3.2 0.0 0.0 80% 80% Fixture Count
Trophy FT Fence Controller 3 Other 0.4 0.0 0.0 100% 100% Fixture Count
3 Workshop Heating Density: (W/m2)
Lighting Density: (W/m2)
1.1KVA 110VAC Transformer 1 Power 0.0 0.6 0.0 80% 80% Fixture Count
2KW Dimplex Wall Heater 1 Heating 10.8 0.0 0.0 80% 80% Fixture Count
3ph Pedastal Drill 2 Manual Motors 0.0 0.0 0.0 0% 80% Fixture Count
58W Single Tube 8 Lighting 2.5 0.0 0.0 80% 80% Fixture Count
Machine Lathe 1 Manual Motors 0.0 0.0 0.0 0% 80% Fixture Count No load information available for this but as it is a
manual motor this is not a concern.
Machine Lathe Emergency Stop Circuit 1 Manual Motors 0.0 0.0 0.0 0% 80% Fixture Count
Small Power Ring 1 Power 0.0 0.0 1.6 80% 80% Fixture Count
Workshop Fan 1 Cooling 0.0 0.0 16.2 0% 0% Typical Cooling less than heating
4 Entrance Hall Heating Density: 135.5 (W/m2)
Lighting Density: 4.9 (W/m2)
18W Quadruple Tube 3 Lighting 1.2 0.0 0.0 80% 80% Fixture Count Estimated rating
2KW Dimplex Wall Heater 1 Heating 10.8 0.0 0.0 80% 80% Fixture Count
Security Alarm Panel 1 Other 4.0 0.0 0.0 100% 100% Estimate
5 Ladies Toilet Heating Density: (W/m2)
Lighting Density: 12.1 (W/m2)
28W Waterproof Light 1 Lighting 0.0 0.2 0.0 80% 80% Fixture Count
3KW Water Heater 1 Water Heaters 0.0 16.2 0.0 25% 25% Fixture Count Is a smaller newey model - lower than 3KW
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
14 Compressor Room Heating Density: (W/m2)
Lighting Density: (W/m2)
3KVA 110VAC Transformer 1 Power 0.0 0.0 1.6 80% 80% Fixture Count Load adjusted for rated voltage of 230.
80W Double Tube 6 Lighting 0.0 0.0 5.2 80% 80% Fixture Count Load adjusted for rated voltage of 230.
Air Dryer No 1 1 Other 1.0 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 240.
Air Dryer No 2 1 Other 1.0 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 240.
Brook Hansen KC-F250MN 90KW 1 Compressors 171.2 171.2 171.2 100% 100% Fixture Count Load adjusted for rated voltage of 415.
Compressor
Brook Hansen KC-F250MN 90KW 1 Compressors 160.0 160.0 160.0 100% 100% Fixture Count
Compressor
Heater Distribution Board 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Radiant Heater 1 Heating 16.2 0.0 0.0 80% 80% Estimate Load adjusted for rated voltage of 230.
Radiant Heater 1 Heating 16.2 0.0 0.0 80% 80% Estimate Load adjusted for rated voltage of 230.
Radiant Heater 1 Heating 16.2 0.0 0.0 80% 80% Estimate Load adjusted for rated voltage of 230.
Radiant Heater 1 Heating 16.2 0.0 0.0 80% 80% Estimate Load adjusted for rated voltage of 230.
Radiant Heater 1 Heating 16.2 0.0 0.0 80% 80% Estimate Load adjusted for rated voltage of 230.
Ring Main (Typical) 1 Power 0.0 0.0 0.0 80% 80% Fixture Count Load adjusted for rated voltage of 230.
Roller Shutter (Typical) 2 Manual Motors 7.2 0.0 0.0 0% 80% Typical Load adjusted for rated voltage of 240. Typical
15 Diesel Fuel Store Room Heating Density: (W/m2)
Lighting Density: (W/m2)
28W Waterproof Light 6 Lighting 0.9 0.0 0.0 80% 80% Estimate
16 Site Services Store Room Heating Density: (W/m2)
Lighting Density: (W/m2)
2KW Dimplex Wall Heater 1 Heating 10.8 0.0 0.0 80% 80% Fixture Count
58W Single Tube 6 Lighting 1.9 0.0 0.0 80% 80% Fixture Count
Socket Ring 1 Power 1.6 0.0 0.0 80% 80% Fixture Count L&P 2 3L1
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
General Office Building
1 Meeting Room Heating Density: 123.9 (W/m2)
Lighting Density: 2.2 (W/m2)
18W Quadruple Tube 9 Lighting 3.5 0.0 0.0 80% 80% Fixture Count
2KW Dimplex Wall Heater 1 Heating 0.0 10.8 0.0 80% 80% Fixture Count West Wall
2KW Dimplex Wall Heater 1 Heating 0.0 0.0 10.8 80% 80% Fixture Count North Wall
Air Conditioning Unit 1 Air Conditioning 0.0 13.0 0.0 80% 80% Fixture Count
Small Power Ring 1 Power 3.2 0.0 0.0 80% 80% Fixture Count
2 Rear Lobby Heating Density: (W/m2)
Lighting Density: 17.4 (W/m2)
18W Quadruple Tube 1 Lighting 0.4 0.0 0.0 80% 80% Fixture Count
Fire Alarm Unit 1 Other 0.0 4.0 0.0 100% 100% Typical Typical load based on device rating
3 Stores Heating Density: 337.8 (W/m2)
Lighting Density: 13.5 (W/m2)
2KW Dimplex Wall Heater 1 Heating 10.8 0.0 0.0 80% 80% Fixture Count
80W Single Tube 2 Lighting 0.9 0.0 0.0 80% 80% Fixture Count
Comms Cabinet 1 Other 0.0 0.0 0.0 100% 100% Fixture Count Load of this device not considered as this is powered
from the small power ring
Small Power Ring 1 Power 2.0 0.0 0.0 80% 80% Fixture Count
Comments: Room has a 63A RCCB marked KD LR/3, also referred to as Copier Room
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
7 External Heating Density: (W/m2)
Lighting Density: (W/m2)
28W Waterproof Light 1 Lighting 0.0 0.0 0.2 80% 80% Fixture Count
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Telecoms Building
1 Locker Room Heating Density: (W/m2)
Lighting Density: (W/m2)
2KW Dimplex Wall Heater 2 Heating 21.7 0.0 0.0 80% 80% Fixture Count
58W Single Tube 2 Lighting 0.6 0.0 0.0 80% 80% Fixture Count
KEADB23 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Shower 1 Water Heaters 16.2 0.0 0.0 80% 80% Fixture Count
Socket Ring 1 Power 1.5 0.0 0.0 80% 80% Fixture Count
Water Heater 1 Water Heaters 16.2 0.0 0.0 80% 80% Fixture Count
Comments: Tumble dryer in the room plugged in to socket.
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
3 Battery Room Heating Density: (W/m2)
Lighting Density: (W/m2)
35W Double Tube 2 Lighting 0.0 0.0 0.8 80% 80% Fixture Count
4ft Twin Tubular Heater 1 Heating 0.0 0.0 2.6 80% 80% Fixture Count Load adjusted for rated voltage of 230.
High Liner Building
1 High Liner Room Heating Density: 43.3 (W/m2)
Lighting Density: 6.7 (W/m2)
15A RCD Socket 1 Power 1.5 0.0 0.0 80% 80% Fixture Count
15A RCD Socket 1 Power 0.0 1.5 0.0 80% 80% Fixture Count
15A RCD Socket 1 Power 0.0 0.0 1.5 80% 80% Fixture Count
15A RCD Socket 1 Power 0.0 0.0 1.5 80% 80% Fixture Count
20A 3ph Test Socket 1 Power 2.0 0.0 0.0 0% 80% Fixture Count
400W Flood Light (Internal) 1 Lighting 2.2 0.0 0.0 80% 80% Estimate
70W Double Tube 6 Lighting 0.0 4.5 0.0 80% 80% Fixture Count
80W Single Tube 2 Lighting 0.0 0.0 0.9 80% 80% Estimate
Double Element Radiant Heater 1 Heating 0.0 10.8 0.0 80% 80% Estimate
Double Element Radiant Heater 1 Heating 0.0 0.0 10.8 80% 80% Estimate
KEAD30DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
KEAD31DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Roller Shutter (Typical) 1 Manual Motors 0.0 6.0 0.0 0% 80% Typical
Trophy FT Fence Controller 1 Other 0.0 0.0 0.1 100% 100% Fixture Count Fence Controller 3
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
External
1 SGT1 Heating Density: (W/m2)
Lighting Density: (W/m2)
400/132 240MVA Parsons Peebles, Bank 1 SGT Cooling 26.9 26.9 26.9 66% 66% Fixture Count Load adjusted for rated voltage of 415. 4 x 4.6A Fans,
A Cooling 1 x 7.5A Pump
400/132 240MVA Parsons Peebles, Bank 1 SGT Cooling 26.9 26.9 26.9 66% 66% Fixture Count Load adjusted for rated voltage of 415. Load time
B Cooling delayed by 30s. 4 x 4.6A Fans, 1 x 7.5A Pump
Tap Changer (Typical) 1 Tap Changer 1.4 1.4 1.4 0% 0% Typical Load adjusted for rated voltage of 415.
2 SGT1 MK Heating Density: (W/m2)
Lighting Density: (W/m2)
Anti Condensation Heaters 4 Heating 2.2 0.0 0.0 80% 80% Fixture Count
3 SGT2 Heating Density: (W/m2)
Lighting Density: (W/m2)
Cooling 1 SGT Cooling 24.9 24.9 24.9 66% 66% Fixture Count Load adjusted for rated voltage of 415. From drawing,
6 x 1.6KW Fans, 1 x 4.2KW Pump, no time delay
SGT2 Drycol 1 Drycol 2.0 0.0 0.0 100% 100% Typical
Tap Changer 1 Tap Changer 0.7 0.7 0.7 0% 0% Fixture Count Load adjusted for rated voltage of 415. From manuals
4 SGT2 MK Heating Density: (W/m2)
Lighting Density: (W/m2)
Anti Condensation Heaters 2 Heating 1.6 0.0 0.0 80% 80% Fixture Count
Anti Condensation Heaters 2 Heating 1.1 0.0 0.0 80% 80% Fixture Count
5 SGT3 Heating Density: (W/m2)
Lighting Density: (W/m2)
Peebles Power Transformers 400/132 1 SGT Cooling 18.6 18.6 18.6 66% 66% Fixture Count Load adjusted for rated voltage of 415. FLC 4 x 3.1A
240MVA Cooling Bank A Fans, 1 x 5.5A Fan, StC 4 x 8.2A Fans, 1 x 24A Pump
Peebles Power Transformers 400/132 1 SGT Cooling 18.6 18.6 18.6 66% 66% Fixture Count Load adjusted for rated voltage of 415. Load time
240MVA Cooling Bank B delayed by 30s. FLC 4 x 3.1A Fans, 1 x 5.5A Fan,
StC 4 x 8.2A Fans, 1 x 24A Pump
SGT3 Drycol 1 Drycol 2.0 0.0 0.0 100% 100% Typical
Tap Changer 1 Tap Changer 0.7 0.7 0.7 0% 0% Fixture Count Load adjusted for rated voltage of 415.
6 SGT3 MK Heating Density: (W/m2)
Lighting Density: (W/m2)
Anti Condensation Heaters 2 Heating 0.6 0.0 0.0 80% 80% Fixture Count
Anti Condensation Heaters 1 Heating 0.5 0.0 0.0 80% 80% Fixture Count
7 Quad Booster 2 (Shunt) Heating Density: (W/m2)
Lighting Density: (W/m2)
Cooling Fans Bank AA 5 Reactor Cooling 36.3 36.3 36.3 0% 0% Fixture Count Load adjusted for rated voltage of 415. QB2
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Cooling Fans Bank AB 5 Reactor Cooling 36.3 36.3 36.3 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 10s. QB2
Cooling Fans Bank BA 5 Reactor Cooling 36.3 36.3 36.3 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 40s. QB2
Cooling Fans Bank BB 5 Reactor Cooling 36.3 36.3 36.3 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 50s. QB2
Drycol 2 Drycol 10.8 0.0 0.0 100% 100% Typical QB2
Oil Pump A1, A2 2 Reactor Cooling 11.7 11.7 11.7 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 30s. QB2
Oil Pump B1, B2 2 Reactor Cooling 11.7 11.7 11.7 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 60s. QB2
Tap Changer (Typical) 1 Tap Changer 1.4 1.4 1.4 0% 0% Typical Load adjusted for rated voltage of 415.
Comments: Alstom
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Comments: Alstom
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Shunt Cooler Pump Bank A2 1 Reactor Cooling 7.4 7.4 7.4 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 20s. Pump M311
Shunt Cooler Pump Bank B1 1 Reactor Cooling 7.4 7.4 7.4 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 90s. Pump M312
Shunt Cooler Pump Bank B2 1 Reactor Cooling 7.4 7.4 7.4 0% 0% Fixture Count Load adjusted for rated voltage of 415. Load time
delayed by 120s. Pump M313
Tap Changer (Typical) 1 Tap Changer 1.4 1.4 1.4 0% 0% Typical Load adjusted for rated voltage of 415.
0 Site Heating Density: (W/m2)
Lighting Density: (W/m2)
Security Gate 1 Manual Motors 16.0 0.0 0.0 0% 80% Typical
West Burton 1 Relay Room
1 West Burton 1 Relay Room Heating Density: 73.0 (W/m2)
Lighting Density: 5.4 (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
16A Socket 1 Power 1.6 0.0 0.0 80% 80% Fixture Count
2KW Wall Heater 2 Heating 0.0 0.0 0.0 80% 80% Fixture Count
30A Reyrolle 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. 16A Input fuse
70W Double Tube 3 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD24DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count Fed from supplies pillar ring
Relay Panels 3 Panel Lighting 0.0 0.0 0.0 80% 80% Typical
West Burton 2 Relay Room
1 West Burton 2 Relay Room Heating Density: (W/m2)
Lighting Density: 4.5 (W/m2)
16A Socket 1 Power 1.6 0.0 0.0 80% 80% Fixture Count
30A Reyrolle 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
58W Double Tube 4 Lighting 2.5 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply 1 Distribution Board 0.0 0.0 0.0 100% 100% red phase 7 points
KEAD25DB 1 Distribution Board 0.0 0.0 0.0 100% 100%
PE Systems 110V/13A Battery Charger 1 110V Battery Charger 6.4 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 230.
(2007)
PE Systems 48V/13A Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 230.
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
SGT3 Relay Room
1 SGT3 Relay Room Heating Density: 109.5 (W/m2)
Lighting Density: 3.2 (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
16A Socket 1 Power 1.6 0.0 0.0 80% 80% Fixture Count
30A Reyrolle 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
3KW Xpelair Heated Fan 1 Heating 16.2 0.0 0.0 80% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. 16A Input fuse
230v
80W Single Tube 3 Lighting 1.3 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD06DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Relay Panels 3 Panel Lighting 0.0 0.0 0.0 80% 80% Typical
Comments: db feeds somwe pumps
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Keadby Power 1 Relay Room
1 Keadby Power 1 Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
30A 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. 16A Input fuse
70W Single Tube 3 Lighting 1.1 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD24DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count Fed from supplies pillar ring
Relay Panels 9 Panel Lighting 0.0 0.0 0.0 80% 80% Typical
Bus Coupler 3 Relay Room
1 Bus Coupler 3 Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. 16A Input fuse
230v
30A 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
3KW Xpelair Heated Fan 1 Heating 16.2 0.0 0.0 80% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. Erskine, no
input rating
80W Single Tube 3 Lighting 1.3 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD09DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Relay Panels 4 Panel Lighting 0.0 0.0 0.0 80% 80% Typical
Creyke Beck - Humber Refinery Relay Room
1 Creyke Beck - Humber Refinery Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. chloride 4a at
240 in
16A Socket 1 Power 1.6 0.0 0.0 80% 80% Fixture Count
30A Reyrolle 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. 10A Input fuse
230v
85W Double Tube 3 Lighting 2.8 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD10DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Killingholme Relay Room
1 Killingholme Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. erskine
58w Doiuble Tube 5 Lighting 3.1 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD11DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Main Bus Section 2 Relay Room
1 Main Bus Section 2 Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
15A Socket 1 Power 1.5 0.0 0.0 80% 80% Fixture Count
30A Reyrolle 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
3KW Xpelair Heated Fan 1 Heating 16.2 0.0 0.0 80% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. Deakin 16A
Input fuse 230v
85W Double Tube 3 Lighting 2.8 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD12DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Comments: Room has ceiling heating?
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Creyke Beck - Killingholme Relay Room
1 Creyke Beck - Killingholme Relay Room Heating Density: (W/m2)
Lighting Density: 9.6 (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
125W Double Tube 3 Lighting 4.1 0.0 0.0 80% 80% Fixture Count
15A Socket 1 Power 1.5 0.0 0.0 80% 80% Fixture Count
30A 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. Erskine no
ratin g
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD14DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Comments: room has a ceiling heater
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Cottam 1 Relay Room
1 Cottam 1 Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
32A 3ph Test Socket 1 Power 3.2 3.2 3.2 0% 80% Fixture Count
3KW Xpelair Heated Fan 1 Heating 16.2 0.0 0.0 80% 80% Fixture Count
70W Single Tube 3 Lighting 1.1 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
KEAD16DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
PE Systems 110V/9A Battery Charger 1 110V Battery Charger 5.0 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 240.
(1999)
PE Systems 48V/15A Battery Charger 1 48V Battery Charger 4.1 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 240.
(1999)
Relay Panels 3 Panel Lighting 0.0 0.0 0.0 80% 80% Typical
Small Vent Axia Fan 1 Cooling 5.4 0.0 0.0 0% 0% Estimate Cooling less than heating
Cottam 2 Relay Room
1 Cottam 2 Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
32A 3ph Test Socket 1 Power 3.2 3.2 3.2 0% 80% Fixture Count
3KW Xpelair Heated Fan 1 Heating 16.2 0.0 0.0 80% 80% Fixture Count
70W Single Tube 3 Lighting 1.1 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
KEAD17DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
PE Systems 110V/9A Battery Charger 1 110V Battery Charger 5.0 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 240.
(1999)
PE Systems 48V/15A Battery Charger 1 48V Battery Charger 4.1 0.0 0.0 100% 100% Fixture Count Load adjusted for rated voltage of 240.
(1999)
Relay Panels 3 Panel Lighting 0.0 0.0 0.0 80% 80% Typical
Small Vent Axia Fan 1 Cooling 5.4 0.0 0.0 0% 0% Estimate Cooling less than heating
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
SGT2 Relay Room
1 SGT2 Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
15A Socket 1 Power 1.5 0.0 0.0 80% 80% Fixture Count
30A 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. Deaking 16A
Input fuse 240v
85W Double Tube 4 Lighting 3.7 0.0 0.0 80% 80% Fixture Count
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD18DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Comments: Ceilin gheater?
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
SGT1 Relay Room
1 SGT1 Relay Room Heating Density: (W/m2)
Lighting Density: (W/m2)
110V Battery Charger 1 110V Battery Charger 6.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240.
125W Double Tube 3 Lighting 4.1 0.0 0.0 80% 80% Fixture Count
15A Socket 1 Power 1.5 0.0 0.0 80% 80% Fixture Count
30A 3ph Test Socket 1 Power 3.0 3.0 3.0 0% 80% Fixture Count
48V Battery Charger 1 48V Battery Charger 3.0 0.0 0.0 100% 100% Estimate Load adjusted for rated voltage of 240. Deaking 16A
Input fuse 240v
8W External Light 1 Lighting 0.0 0.0 0.0 80% 80% Fixture Count
Essential Lighting Supply Distribution Board 0.0 0.0 0.0 100% 100%
KEAD20DB 1 Distribution Board 0.0 0.0 0.0 100% 100% Fixture Count
Comments: Ceiling Heating
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
Actuals Diversity:
Circuit/Equipment: Q'ty Load Nature: L1: L2: L3: DG: TX: Actual Basis: Comments:
SGT Cooling DG Load: 76 76 76
TX Load: 76 76 76
Water Heaters DG Load: 26 4 12
TX Load: 26 4 12
Key:
Estimate: Where either the number of fittings or the rating of the equipment is unknown and a reasonable estimate has been ma
Fixture Count: Where the number of fittings is known and either the rating has been specifically identified from the equipment or has been generically identified (e.g. a heater looks like a
2KW Heater so 2KWe has been allowed).
Measure: Where the rating has been measured using a Clamp meter or similar instrumentatio
Typical: Where the number fittings or rating of the equipment is unknown and a value has been used in accordance with agreed values from OS733 (e.g. 120W Panel Heat
Survey Notes:
No: Note:
1. Sizing is in accordance with WARDPOWER document OS733, NG LV Sizing Methods Guidelines, Revision B.
2. Special diversities have been applied to SGT Cooling and Quad Booster cooling in accordance with instructions from NG Design Assurance.
Survey Revisions:
Revision: Date: Revision Description:
A 27-Feb-14 First Release
B 12-Sep-14 Corrections to SGT Cooling phases, water heater diversities, application of NG Design Assurances specifically for Keadby - See Note 2.
Load Analysis
This estimate has been prepared based upon the following scheme information and working assumptions:
- No regenerative loads
- Loads are applied in the groups given in 3 below with recovery times as given.
2. Loads
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Totals: 0.52 6,653 6,624 6,726 6,479 2,404 4,619 4,376 4,376 4,376 4,376 1,620 3,032 0.80 1,493 1,464 1,566 1,319 836 1,045 969 969 969 969 537 671
Including Future Provision: 0.52 6,653 6,624 6,726 6,479 2,404 4,619 4,376 4,376 4,376 4,376 1,620 3,032 0.80 1,493 1,464 1,566 1,319 836 1,045 969 969 969 969 537 671
From the above loads, the following will be the starting and running loads for the Generating Set:
Load Group Loads Cumulative (Starting In Order) Starting Last
Timing (s) Can this Group be Starting Running Starting Running Starting
Load Group Description (From 0s) Started Last? KWe KVA KWe KVA KWe KVA KWe KVA KWe KVA
Standing Load Incl Compressor 1, QB2 A1 Fans, SGT1 A Bank Cooling, SGT2 Cooling, SGT3 A Bank Cooling 0 N 574 1,229 300 374 574 1,229 300 374
Load Group 1 QB1 Series B1 Fans 5 Y 54 135 18 22 353 509 317 397 573 783
Load Group 2 QB1 Shunt B1 Fans, QB2 A2 Fans 10 Y 159 114 15 19 477 511 333 416 681 766
Load Group 3 15 Y 0 0 0 0 333 416 333 416 537 671
Load Group 4 QB1 B2 Fans, QB1 A Pumps, 20 Y 78 196 26 33 411 612 359 449 589 835
Load Group 5 QB1 Series A1 Fans 25 Y 54 135 18 22 413 583 377 471 573 783
Load Group 6 Compressor 2, SGT1, SGT3 Bank B Cooling, QB1 Shunt A1 Fans, QB2 A Pumps 30 Y 433 839 112 140 809 1,310 489 611 858 1,370
Load Group 7 QB1 Series A2 Fans 35 Y 54 135 18 22 542 745 507 633 573 783
Load Group 8 QB1 Shunt A2 Fans, QB2 B1 Fans 40 Y 46 114 15 19 552 747 522 652 567 766
Load Group 9 45 Y 0 0 0 0 522 652 522 652 537 671
Load Group 10 QB2 B2 Fans 50 Y 159 114 15 19 681 766 537 671 681 766
Load Group 11 55 Y 0 0 0 0 537 671 537 671 537 671
Load Group 12 QB2 B Pumps 60 Y 0 0 0 0 537 671 537 671 537 671
Load Group 13 QB1 B1 Pumps 90 Y 0 0 0 0 537 671 537 671 537 671
Load Group 14 QB1 B2 Pumps 120 Y 0 0 0 0 537 671 537 671 537 671
Load Group 15 150 Y 0 0 0 0 537 671 537 671 537 671
Load Group 16 Manual motors 180 Y 9 22 0 0 546 693 537 671 546 693
The above figures include any given provision for future expansion if applicable.
4. Analysis
From the above, the Generating Set must be capable of: Site Loading Profile
KWe KVA pf
1,400
Worst Case Continuous Load 537 671 0.80
Peak Power 858 1,370
Largest Impact KVA 1,229 1,200
Largest Load Step 574
First Load Step 574
Largest Subsequent Step 433
Largest Phase (Expressed as Single Phase) 224 1,000
600
400
KWe
200
KVA
0
-10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200
Time (s)
The following components are selected to meet this duty: Performance for these components would be as follows:
Generator: CGT (Newage) Voltage Transient: 15% Peak Power 751 708 133% 858 Fail
Model: HCI634G Generator BCR: 800 KVA Continuous Load 478 450 83% 537 Ok
Generator Efficiency: 94.2% 800 84% 671 Ok
Maximum Load Step: 700 KVA
Maximum Frequency Transient 13.5% 10% Fail
Is this set fitted with a 50% rated Load Bank for Routine Testing? Y Y/N Maximum Voltage Transient 33.1% 15% Fail
Notes:
- Peak Power as a proportion of MCR is calculated from KWe (Real Power) 25%
- Continuous Load as a proportion of MCR is calculated from KVA (Apparent Power)
- All KWm and KWe figures are Nett
- All figures are at site conditions 20%
Voltage Transient
10%
Frequency Limit
5%
Voltage Limit
0%
-10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200
Time (s)
2. Comments
- Engine Frequency Transients are approximate and may be the nearest quoted value for that load step. All Transients are calculated from no load condition.
- Power Factor is in the normal range.
- As this set is fitted with a 50% rated Loadbank for Routine Testing, Load Factor is not an issue for this application.
- Phase balance is acceptable.
Template F
Load Analysis
This estimate has been prepared based upon the following scheme information and working assumptions:
- No regenerative loads
- Loads are applied in the groups given in 3 below with recovery times as given.
2. Loads
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Totals: 0.80 174 145 247 0 104 131 174 145 247 188 104 131 0.80 174 145 247 0 104 131 174 145 247 188 104 131
Including Future Provision: 0.80 191 160 271 0 115 144 191 160 271 207 115 144 0.80 191 160 271 0 115 144 191 160 271 207 115 144
From the above loads, the following will be the starting and running loads for the Generating Set:
Load Group Loads Cumulative (Starting In Order) Starting Last
Timing (s) Can this Group be Starting Running Starting Running Starting
Load Group Description (From 0s) Started Last? KWe KVA KWe KVA KWe KVA KWe KVA KWe KVA
Standing Load 0 N 50 62 50 62 50 62 50 62
Load Group 1 5 Y 65 81 65 81 115 144 115 144 115 144
Load Group 2 10 Y 0 0 0 0 115 144 115 144 115 144
Load Group 3 15 Y 0 0 0 0 115 144 115 144 115 144
Load Group 4 20 Y 0 0 0 0 115 144 115 144 115 144
Load Group 5 25 Y 0 0 0 0 115 144 115 144 115 144
Load Group 6 30 Y 0 0 0 0 115 144 115 144 115 144
Load Group 7 35 Y 0 0 0 0 115 144 115 144 115 144
Load Group 8 40 Y 0 0 0 0 115 144 115 144 115 144
Load Group 9 45 Y 0 0 0 0 115 144 115 144 115 144
Load Group 10 50 Y 0 0 0 0 115 144 115 144 115 144
Load Group 11 55 Y 0 0 0 0 115 144 115 144 115 144
Load Group 12 60 Y 0 0 0 0 115 144 115 144 115 144
Load Group 13 90 Y 0 0 0 0 115 144 115 144 115 144
Load Group 14 120 Y 0 0 0 0 115 144 115 144 115 144
Load Group 15 150 Y 0 0 0 0 115 144 115 144 115 144
Load Group 16 180 Y 0 0 0 0 115 144 115 144 115 144
The above figures include any given provision for future expansion if applicable.
4. Analysis
From the above, the Generating Set must be capable of: Site Loading Profile
KWe KVA pf
160
Worst Case Continuous Load 115 144 0.80
Peak Power 115 144
Largest Impact KVA 81 140
Largest Load Step 65
First Load Step 50
Largest Subsequent Step 65 120
Largest Phase (Expressed as Single Phase) 63
60
40
KWe
20
KVA
0
-10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200
Time (s)
The following components are selected to meet this duty: Performance for these components would be as follows:
Generator: CGT (Newage) Voltage Transient: 15% Peak Power 174 163 78% 115 Ok
Model: HCI434C Generator BCR: 250 KVA Continuous Load 111 104 78% 115 Ok
Generator Efficiency: 93.7% 185 78% 144 Ok
Maximum Load Step: 260 KVA
Maximum Frequency Transient 6.8% 10% Ok
Is this set fitted with a 50% rated Load Bank for Routine Testing? Y Y/N Maximum Voltage Transient 8.1% 15% Ok
Notes:
12%
- Peak Power as a proportion of MCR is calculated from KWe (Real Power)
- Continuous Load as a proportion of MCR is calculated from KVA (Apparent Power)
- All KWm and KWe figures are Nett 10%
- All figures are at site conditions
8%
Frequency Transient
6%
Voltage Transient
4%
Frequency Limit
2%
Voltage Limit
0%
-10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200
Time (s)
2. Comments
- Engine Frequency Transients are approximate and may be the nearest quoted value for that load step. All Transients are calculated from no load condition.
- Power Factor is in the normal range.
- As this set is fitted with a 50% rated Loadbank for Routine Testing, Load Factor is not an issue for this application.
- From the load information provided, the phase imbalance is calculated as >5% of the Generator Rating. Voltage distortion may occur. This should be discussed with the manufacturer.
Template F