0% found this document useful (0 votes)
35 views4 pages

Correspondence With Gla On Energy and Carbon June 2023 - 1911513

Uploaded by

zhongsuyupu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views4 pages

Correspondence With Gla On Energy and Carbon June 2023 - 1911513

Uploaded by

zhongsuyupu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Aleksandra Milentijevic

From: Scott Schimanski <[email protected]>


Sent: 21 June 2023 11:49
To: Aleksandra Milentijevic
Subject: Re: GLA0217 - Ailsa Wharf - Stage 1 - additional information
Attachments: 6. Alicia Wharf GLA WLC Memo_22.08.22 (Resend of memo).xlsx; 20220358
(20220217) Ailsa Wharf, Ailsa Street (Post Stage 1) GLA Consultation - Energy
Memo 2022.xlsx

Follow Up Flag: Follow up


Flag Status: Flagged

Hi Aleks,

Please see attached updated Energy Memo.

Further information needed on:


- Further low impact energy efficiency measures on Be Lean to be considered for both residential and non-
residential.
- Further information on overheating.
- Email correspondence for DHN potential.
- Capped off connections for commercial spaces.
- Future connection drawings.
- Further site-wide PV roof layout and PV provision to be justified.
- Further information on ASHP.
- Be Seen submission confirmation.
- Draft S106 should be submitted.

With regards to WLC, the consultant has stated that they reviewed the submitted information in August last
year. Their comments are once again attached.

As a way forward, I suggest Council include appropriately worded conditions to cover any outstanding issues
regarding Energy and Carbon. If you wish, I can ask Energy/WLC officers if they can suggest wording for
conditions?

Please let me know.

Regards,

Scott

From: Aleksandra Milentijevic <[email protected]>


Sent: 19 June 2023 11:01
To: Scott Schimanski <[email protected]>
Subject: RE: GLA0217 - Ailsa Wharf - Stage 1 - additional information

Hi Scott,

I hope you are well and had a good weekend.

1
I just wanted to touch base with you on this scheme and ask for any further comments, and as mentioned below,
mainly in relation to the energy matters.

I look forward to hearing from you.

Kind regards,

Aleks

From: Aleksandra Milentijevic


Sent: Monday, June 5, 2023 4:39 PM
To: Scott Schimanski <[email protected]>
Subject: RE: GLA0217 - Ailsa Wharf - Stage 1 - additional information

Hi Scott,

Thank you for your response.

I have started uploading documents to Stage 2, however, realised that these would not be categorised as per the
submitted information and it would be messy to review them, so I created a WeTransfer link – please see below.

https://we.tl/t-vMYiNGq6Av

Any issues, please do let me know. I look forward to hearing back from you with any comments.

Many thanks,

Aleks

From: Scott Schimanski <[email protected]>


Sent: Friday, June 2, 2023 4:04 PM
To: Aleksandra Milentijevic <[email protected]>
Subject: Re: GLA0217 - Ailsa Wharf - Stage 1 - additional information

Hi Alek,

Thanks for your email.

If you wish our energy team to review any post stage 1 information then I suggest you upload it
specifically to the Stage 2 file on the portal. Once you have done so, let me know and I will consult
the energy team to review and make comment. If this is done in the next few days, there shouldn't
be an issue with getting comments by the 16th.

Regards,

Scott

From: Aleksandra Milentijevic <[email protected]>


Sent: 02 June 2023 15:44
To: Scott Schimanski <[email protected]>
Subject: RE: GLA0217 - Ailsa Wharf - Stage 1 - additional information

Hi Scott,
2
Just to clarify from my email below as I spoke with our admin team, we don’t send specific Regulation 25
consultation requests to the GLA so your team would have not received this.

Nonetheless, it would be great if you will be able to review the information as I mentioned below and let me know if
you have any particular comments.

Many thanks,

Aleks

From: Aleksandra Milentijevic


Sent: Friday, June 2, 2023 2:14 PM
To: 'Scott Schimanski' <[email protected]>
Subject: RE: GLA0217 - Ailsa Wharf - Stage 1 - additional information

Hi Scott,

I hope you have been well and are looking forward to this sunny weekend.

It has been a while since we last spoke on this application, and I am unsure if you have previously received the
additional information from the applicant’s team directly, so I wanted to provide an update on what has been
happening.

We have received various responses from the applicant, including responses to the GLA’s queries. More recently, we
have also received further environmental information for which Regulation 25 consultation is being finalised this
week. There have been also some minor changes as a result of the addition of a second staircase, as well as minor
repositioning of Block C to respond to the EA’s previous objections. All of the additional information is available on
the planning register to be viewed. You should have also received the consultation request for the Regulation 25
consultation, which summarises some other minor changes.

I wanted to ask you if you could please review the submitted information, particularly in relation to energy and
other specialist matters and let me know any additional comments you or your colleagues might have. Given that
we might try to take the scheme to Committee, all being well, could I please ask you to come back to me with any
comments by Friday 16 June so the applicant can respond these if required.

Any queries, please do let me know. Happy to have a quick catch up on Teams if that’s helpful.

Kind regards,

Aleks

Aleksandra Milentijevic
Principal Planning Officer (East Area Team)
Development Management
Place Directorate
London Borough of Tower Hamlets | Town Hall | 160 Whitechapel Road | London E1 1BJ
 020 7364 7029
www.towerhamlets.gov.uk

 Please consider the environment before printing this email. Save trees - be green and keep it on the screen!

3
https://talk.towerhamlets.gov.uk/local-plan

From: Scott Schimanski <[email protected]>


Sent: Wednesday, May 4, 2022 9:46 AM
To: Aleksandra Milentijevic <[email protected]>
Subject: GLA0217 - Ailsa Wharf - Stage 1

Hi Aleksandra,

Please find attached the Stage 1 letter and report for GLA0217. I have also attached the energy
and WLC comments.

Regards,

Scott Schimanski

Principal Strategic Planner, Development Management, Planning


GREATERLONDONAUTHORITY
Union Street, London, SE1 0LL

NHS health information and advice about coronavirus can be found at nhs.uk/coronavirus
The GLA stands against racism. Black Lives Matter.

GREATER LONDON AUTHORITY NOTICE:


The information in this email may contain confidential or privileged materials. For more information
see https://www.london.gov.uk/about-us/email-notice/

This message has been scanned for viruses by the Greater London Authority.

Click here to report this email as spam.

NHS health information and advice about coronavirus can be found at nhs.uk/coronavirus
The GLA stands against racism. Black Lives Matter.

GREATER LONDON AUTHORITY NOTICE:


The information in this email may contain confidential or privileged materials. For more information
see https://www.london.gov.uk/about-us/email-notice/

NHS health information and advice about coronavirus can be found at nhs.uk/coronavirus
The GLA stands against racism. Black Lives Matter.

GREATER LONDON AUTHORITY NOTICE:


The information in this email may contain confidential or privileged materials. For more information
see https://www.london.gov.uk/about-us/email-notice/