0% found this document useful (0 votes)
34 views13 pages

FSD Scrubber Type

Uploaded by

sechoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views13 pages

FSD Scrubber Type

Uploaded by

sechoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

1

TYPE FSD

KYOWA

EXHAUST GAS SCRUBBER

OPERATION MANUAL

THAI KYOWA KAKO CO.,LTD.

WWW.KYOWA.CO.TH
2

CONTENTS
1.SPECIFICATIONS………….……………………………………………….. 2
2.EXTERNAL VIEW………………………………………………………….. 3
3.FUNCTION OF EACH SECTION………………………………………… 4
4.SAFETY CONTROL AND SAFETY OPERATION……………………… 5
5.TEST OPERATION………………………………………………………… 6
6.OPERATION ……………………………………………………………… 7
7.DAILY MAINTENANCE…………………………………………………… 9
8.MAINTENANCE AFTER LONG-TERM
SUSPENSION OF OPERATION……………………………………………. 11
9.DISASSEMBLY AND ASSEMBLY OF
COMPONENTS FOR MAINTENANCE SYSTEM ………………………. 11
10.TROUBLESHOOTING…………………………………………………… 13
11.GUARANTEE…………………………………………………………….. 14

WARNING

This system could be used only in a right purpose and right condition. If some
abnormal state occurred, stop the operation of gas generating source. Next, inspect exhaust
gas treatment system, and this system can be resumed after restoring all the breakdown
section perfectly.
3

Warning

The Kyowa FSD-type exhaust gas scrubber sucks in the exhaust gas and, after scrubbing,
discharges it into the air.The parts, which contact the exhaust gas are made of fiberglass reinforced
plastic, which has excellent anti-corrosion properties.
Please, read this manual carefully before operating this unit so that it operates to its full
performance and prevent malfunctions.This operation manual covers the general and basic precautions
for the unit. For details on operating the exhaust fan, the circulation pump and other devices. Please,
refer to each of the attached instruction manuals.
1. Specifications: (Refer to Specifications in part 2)

2. External View

13 LC control PVC 1 50A-JIS10K


12 Common base ss400 1 C100x50x5
11 Inspection port for Demister FRP 1
10 Inspection port for Nozzle PVC 2
9 Inspection port for Packing FRP 1
8 Level gauge PVC 1
7 Inspection port for Tank FRP 1
6 Water supply port PVC 1 20A-JIS10K
5 (Overflow Drain) PVC 1 40A
4 (Exhaust Fan) PVC 1 FRAME 50x50x5(ss400)

3 (Circulation Pump) PVC 1


2 (Circulation Tank) FRP 1 1000x1700x600H
1 (Scrubber) FRP 1 100x100x3700H
No. ITEM MATERIAL QUANTITY REMARK
4
3. Function of each section.
The Function of each parts are following.
(1) Exhaust Fan
The function of fan is to transport the exhaust gas to scrubber.

(2) Circulation pump


The function of circulation pump is to suck circulation water form circulation tank and carry them to
nozzle, and sprinkle on exhaust gas flow.

(3) Scrubber main body


Scrubber main body consists of packing, spray nozzles, mist separator. Function of scrubber is to absorb
pollutant form exhaust gases, which is based on mass transfer theory of chemical engineering.

1. Scrubber tower packing.


The function of tower packing is to produce wide contact surface area and demonstrate
acceleration of mass transportation.

2. Spray nozzle
To spray the absorbent water on the tower packing uniformly.

3. Mist separator.
To remove the droplets from exhaust gases, which is generated from the spraying inside the scrubber.

(4) Circulation Tank


The function of circulation tank is to hold the circulation water and conditioning of circulation water.
5
4.Safety control and safety operation
When test running or inspection is started, be careful of safety operation, especially in next item.
(1) This apparatus is made of PVC or FRP, so the hammer impacted on the PVC surface or other
impacted could break the scrubber main body.
The range of temperature in which plastics can be used isn’t so wide. If plastics are used beyond the
limits of temperature. Plastic will be deformed or broken.
Permitted range of temperature: 0~400 C
If flame get close to plastics apparatus, plastics burn and cause fire, so please be careful not to get close
to plastics.
(2) However, this apparatus can remove the pollutant from exhaust gases by certain extent. A
little pollutant still remain in there after treatment gas. because this apparatus can’t absorb the pollutant
perfectly.
Breathing the gas which out of from the scrubber, cause danger for your health.
So please, be careful! Don’t breathe the gas directly. keep enough distance between this scrubber and
any other outer air intake port, so as not to contaminate indoor environment.
(3) During equipment is inspected. Please, make sure that power supply is turned off, so as not
to have a serious accident.
(4) When you are under maintenance operation. Please, select the suitable tool in order to avoid
suffering.
(5) If some operation in a high position is required, arrange enough scaffolding and take care of
your safety.
(6) Before the operation concerning with electricity wiring, terminate electricity securely.
(7) When you treat absorbent (water) in this system. You must wear appropriate protection
devices such as mask, goggles, gloves etc, because the water was mixed with some chemical
substances. Which can suffer injury to your physical condition. If you touched circulation water. There
may be some possibility of your damage. Please, have a medical treatment appropriately.
(8) Before operation in the scrubber, make an enough ventilate and wash out inside scrubber. So
as not remain any poisonous gas in the scrubber.
When you getting in the scrubber. Please, wear the safety guard such as goggles, gloves, mask or
waterproof coat. When you are under operation. Please, shuts off the generating source of pollutant
including the exhaust fan and pump also.
(9) When the absorbent water being grained out. Specify and investigate what the poisonous
substance in,and drain out after legal treatment appropriately.
(10) When this apparatus become disuse and scrap. Please, contact to expert firm.
If you throw away this apparatus as general article, unexpected damage may be caused.
6
5. Test operation
Perform the test operation in accordance with the following procedure.
(1) Circulation pump
1) After completing installation, piping and wiring of the circulation pump. Clean the inside of
circulation tank and pour it with the water up to the level where water overflows.
2) Turn the switch on and off to make sure the circulation pump rotates in the direction marked
on the main body of the pump and then switchs on the unit for operation.
3)After rotation of the circulation pump becomes correct. Measure the current flowing through
the motor and must sure that current is lower than the specified value (the rated value of current specified
on the nameplate of the circulation pump).Then keep the condition of valve in circulation pump.
(2) Exhaust fan
1) After completing installation, duct work and wiring of the exhaust fan, inspect and clean the
inside of the duct. If any foreign mater is sucked during operation.The exhaust fan might be broken.
2) Before switching the motor on, turn the fan by hand to make that it rotates smoothly.
3) Set the volume damper at the half.
4) Turn the switch on and off to make sure the exhaust fan rotates in the direction marked on the
main body of the fan. If its direction is incorrect. Change wiring of the motor.
5) After rotation of the exhaust fan becomes correct. Switch on the unit for operation.
6) Set the volume damper to adjust air flow rate to rated value.
7) Measure the current of the motor and make sure that current is lower than the specified value
(the rated value of current specified on the nameplate of the motor.)
If the current exceeds the rated value, reduce it lower than the rated value by reducing the air flow rate
through the damper.

(3) Scrubbing Tower


1) Observe the inspection port of spray nozzle, check that the packing are evenly distributed
and that spray from the spray nozzles is uniform.
2) Check the outside for cracking or leaking.
7
6.Operation
After improvement through a test operation that all of devices are corrected. Operate the unit in
accordance with the following procedure.

(1) Start
- Must sure that the circulation tank is filled with circulation water up to specified(overflow) level.
- Turn the circulation pump on before opening the delivery valve.
- After sure that the circulation pump is working correctly. Turn the exhaust fan on.
- Start supplying water.
- Measure the air flow rate in the initial operation and set it to the specified value.

(2) Stop
- Stop the water supply.
- Switch off the exhaust fan.
- Switch off the circulation pump.

(3) When the electric power is cut off. Turn the exhaust fan and circulation pump off. After the power
supply is recovered. Start the operation from the beginning.
(Start) (Stop)
Confirm the water level in the
Circulation tank

Circulation pump, ON Circulation pump, OFF

Exhaust fan, ON Exhaust fan, OFF

Water supply, ON Water supply, OFF

Adjustment of air flow rate (only in


initial operation)

Operation
8
7.Daily maintenance
(1) Exhaust fan
1) V-BELT
The V-Belt might be stretched and slipped, especially at the initial stage of operation. If occurred,
adjust the tension of the V-Belt by sliding the slide base of the motor. Replace the V-Belt with a new
one according to the damage,which depends greatly upon r.p.m., operation term, condition of
installation,etc.

2) Bearing
Lubricate the bearing using high-grade grease with a lithium soup base every 2 to 6 months
depending upon r.p.m., operation hours, bearing temperature, etc. If unusual noise or vibration is
produced by damage, replace a new one.

(Grease to used)
Maker Brand name
Shell ALBANIA Nos.2 and 3
Cosmo REMAX Nos.2 and 3
Mobil MOBILUX no.2

3) Runner
Depending upon the kind of gas sucked in, dust might adhere to the runner or the runner
might be deformed by heat, and as the result, vibration occurs due to an unbalanced runner.
Because such vibration might cause a sudden breakage of the bearing or the runner. Clean or
replace the runner when vibration becomes intense.
4) Others
For details, refer to the attached ” KYOWA Anticorrosive Blower Instruction Manual KS Type”

(2) Circulation Pump


Circulation pumps 40 VO, which are used in this system, are maintenance –free vertical
centrifugal pump with no sliding parts. So there no need for lubrication and replacement of parts. For
vibration, noise or insufficient water lifting refer to the attached “KYOWA Corrosion-proof Vertical Pump
Instruction Manual”.
9

(3) Scrubbing Tower


1) Packing
The packing used in this unit is corrosion-proof because they are made of Polypropylene (PP).
However, if there is excessive dust in the exhaust gas or the unit is operated with dirty, circulation water
or organic mater is present, contaminated packing might cause clogging.
If it is observed through the inspection port for spray nozzle that packing are extremely contaminated or
there is a loss of exhaust gas suction capacity, take off the packing and clean or replace them.

2) Spray nozzles
If spraying isn’t uniform when viewed through the inspection port for spray nozzle. The nozzles
might be blocked. Remove and clean the nozzles.

3) Demister
The demister might similarly be blocked with dirt. So if the demister is clogged. Mist can
disperse from the stack or the exhaust gas suction capacity, might be reduced. In this case,
remove and clean or replace a new one.
(4) Circulation tank
1) Because deposits might be formed on the bottom of the circulation tank depending upon the
operation condition, periodically clean the circulation tank (every 3 months).
2) If operation is suspended when freezing may occur, completely remove the circulation water
from the circulation tank.
10
8.Maintenance after long-term suspension of operation
(1) When operation of the unit is suspended for a long-term, operate the exhaust fan and
the circulation pump once a month for more than an hour under normal operating conditions.

(2) When operation is suspended for a long-term in winter. When freezing might occur,
completely drain circulation water.Also drain the pump piping at the same time.

(3) Before operating the unit after a long–term suspension of operation, perform a test
operation in accordance with the procedure in “3. Test operation”.

9. Disassembly and assembly of components for maintenance


If necessary, remove or replace the components of this unit in accordance with the following procedure
after making sure that the exhaust fan and the circulation pump aren’t operating and providing a safe
foothold.

(1) Exhaust Fan


Refer to the attached ” KYOWA Anticorrosive Blower Instruction Manual KS Type”

(2) Circulation Pump


Refer to the attached “KYOWA Corrosion-proof Vertical Pump Instruction Manual”.

(3) Scrubbing Tower (refer to “2.External View”)


1) Removal of packing
-Unfasten the bolts of inspection port and take off the cover plate of inspection port.
-Take off the packing from the scrubber main body.
-Assemble by the reverse procedure as that for disassembly. Replace gaskets with new ones.

2) Replace of spray nozzles


- Unfasten the bolts of inspection port for spray nozzle and open the inspection port.(open plural
port, if necessary)
- Put the spray nozzle out of scrubber main body through the inspection port.
- Spray nozzle can be taken off after removing the packing, in alternative method.
- Assemble the unit by the opposite procedure as that for disassembly.
Replace gaskets with new ones.
11
3) Replace of the demister
- Unfasten the bolts of inspection port for demister and take off the cover plate.
- Take off the cartridge and demister from scrubber main body.
- Assemble the unit by opposite procedure as that for disassembly.
Replace gaskets with new one

10.Troubleshooting.
(Problem) (Cause) (Solution)

Gas isn’t sucked in Failure of the exhaust Refer to (trouble-shooting for blower)
or the suction power fan. in the attached(KYOWA Anticorrosive
is weak. Blower Instruction Manual KS Type).

The damper is closed. Open the damper.

The duct is clogged. Check and clean the inside of the dust.

Packing or demister are Clean or replace packing or


clogged. demister. (Replace circulation
water and clean the circulation
tank.)

Water doesn’t come Circulation pump failure. Refer to (Trouble-shooting for


out of spray nozzles pump) in theattached (KYOWA
or spraying isn’t Corrosion- proof vertical pump
uniform. instruction manual).

Spray nozles are Clean or replace spray


clogged. nozzles.(Replace circulation water
and clean the circulation tank.)

The water level in the Supply water.(Confirm function of


circulation tank drops. water source, ball tap and drain valve.

Mist scatters from The demister is Clean or replace the demister.


the stack. clogged.
12

Leak of Deformation or damage Replace the gasket.


circulation water. of flange packing.

Bolts of flange are Tighten bolts.


loose.

Deformation, damage, Repair.


or crack.

Unusal noise or Exhaut fan failure. Refer to (trouble-shooting for


vibration. blower) in the attached(KYOWA
Anticorrosive Blower Instruction
Manual KS Type).

Circulation pump failure. Refer to (Trouble-shooting for


pump) in theattached (KYOWA
Corrosion- proof vertical pump
instruction manual).

Bolts are loosened. Tighten bolts.

11. Guarantee
The unit is guaranteed for one year after delivery. If any trouble occurs, please contact us even if the term
of the guarantee has expired.
13

You might also like