UNIT OF SCHEDULE OF
ITEMS TO BE PROCURED QTY. UNIT COST TOTAL PROCUREMENT METHOD COMMENTS/ REMARKS
MEASURE PROCUREMENT
GOODS
Package 1: Lumber
18- 2" x 6" x 12' Good lumber 216.00 Bd. Ft. 35.00 7,560.00
2" x 2" x 12' Good lumber 444.00 Bd. Ft. 35.00 15,540.00
2" x 3" x 12' Good lumber 486.00 Bd. Ft. 35.00 17,010.00
54- 1" x 6" x 10' Timber walling w/plainer 270.00 Bd. Ft. 35.00 9,450.00 Community Shopping for
1st Tranche
10- 5" x 5" x10' good lumber 208.00 Bd. Ft. 35.00 7,280.00 Goods
12- 2" x 5" x12' good lumber 120.00 Bd. Ft. 35.00 4,200.00
10- 2" x 4" x 12' Good Lumber 80.00 Bd. Ft. 35.00 2,800.00
32- 1" x 10" x 12' Good lumber-Fascia board 320.00 Bd. Ft. 35.00 11,200.00
Sub-Total 75,040.00
Sub-Total 75,500.00
Package 8: Pre-fabrication
Steel Rack (Plate organizer, stove holder, &
1.00 Set 10,000.00
Platform sink) 10,000.00
Single Bed 36" x 75" (Good lumber) 6.00 Set 3,500.00 21,000.00 Community Shopping for 2nd Tranche
Goods
Tables with Chairs (Good lumber) 1.00 Set 3,400.00 3,400.00
Hanging Cabinet ( 40cm x 50cm x 3mtr) 1.00 Set 10,000.00 10,000.00
Sub-Total 44,400.00
JAMES F. MAGTULIS RASUL S. SANSALUNA, CE JIMMY V. TORRES, CE, MPA ERLINDA A. BALADJAY
PT Head ACT-Technical Facilitator Municipal Engineer BDC-TWG Chairperson