WORKS
Package 1: ISOLATION BUILDING
Sub-Total 1,241,823.56
GOODS
Package 2: PPE's (Constructions)
Skull Guard 5.00 Set 446.00 2,230.00
Construction Hand Gloves 5.00 pair 60.00 300.00
Community Shopping
Rubber Boots (water proof high tube)s,m,l sizes 5.00 pair 520.00 2,600.00 1st Tranche
for Goods
Construction spade shovel 5.00 set 575.00 2,875.00
Hacksaw blade 5.00 set 74.00 370.00
Sub-Total 8,375.00
LIZIEL M. DONATO RASUL S. SANSALUNA, CE JIMMY V. TORRES, CE, MPA WILFREDO T. CAMBAN
PT Head ACT-Technical Facilitator Municipal Engineer BDC-TWG Chairperson