Master Plan
Master Plan
HIS
F.F.L PAVED
+49.20 M HANDICAP
8. Levels Considered As Per Survey Drawing sent.
HER
F.F.L. PAVED
+49.05 M
F.F.L PAVED
+49.05 M
+47.70
+47.40M
+47.10
M
M
T.O. RAILING
F.F.L PAVED +49.95 M
M
+46.80 M
8.60
+4
F.F.L. TENNIS COURT
HER HIS +49.05 M
TENNIS COURT
+48.00 M
LANDSCAPE AREA THIS DRAWING IS THE SOLE PROPERTY OF M/S HITEN SETHI
INCLUDING PATHWAY, GAZEBO, SEATING AREA,
VOLLEYBALL COURT
GATHERING SPACES, LAWN, PLANTING F.F.L PAVED
ARCHITECTS PVT. LTD. & SHALL NOT BE COPIED / REPRODUCED
F.F.L PAVED
UP
1
2
ASSEMBLY SPACE
3
UP
F.F.L TENNIS COURT
CHAJJA
LIFT LVL +46.95 +48.00 M
2.15 X 1.90
+48.15 M
+48.30 M
+48.45 M
+48.60 M
+48.75 M
+48.90 M
F.F.L PAVED
TOP OF ROAD
F1
:12
SL
OP
E
+46.50 m
+48.90 M
VOLLEYBALL COURT
M PO TOP OF LANDSCAPE
RA
BUS PARKING
FOR 07 NOS. BUSES
ENTRANCE FEATURE UP
FIRE
TO x 2.45
T
ILE
+44.1 m
5
+44.5 m
1.3
E
PH
F.F.L PATHWAY
+48.00 M T.O. LAWN
+48.45 M
1:12 RAMP
+44.5 m BIN
+44.5m PA
L CA
TOP OF ROAD INCI
PR
OM
D RO
AR
BO
+44.5 m F.F.L ENTRY
TOP OF ROAD
WA
ITING
E CA
BIN
MAIN ENTRY +48.00 M F.F.L PATHWAY
+48.00 M
G 02 E TR
US
TE
STILT
TOP OF PARKING
LLIN AG
SE SS
+44.55 m
1:10 RAMP UN PA
CO
IDE FINISH LEV
MW
1:12 RAMP
FOR PARKING G 01
SE
LLIN 2.00 +48.45m
UN
ARTS ROOM TERRACE CO
F.F.L PATHWAY
UP
+48.90 M
WING 1 SLAB AT
+44.5 m
PCC LEV
FD
SLAB LEV
ABOVE ( 1ST FL)
1:10 RAMP
COURTYARD +48.00m F.F.L PATHWAY
ARTS ROOM
FD
+48.00 M
FOR PARKING LV
CLASS ROOM_UG 03
FIRE FD
F.F.L FOOTBALL GROUND
INCLUDES FOOD KIOSK, SEATING AND
FD
PHE +48.00 M
WATER RY
9.50 x 6.35 ELEC. NT
12 13 14
FOUN
ROOM LIFT 2.58
2.00
x
TAIN
SLAB AT HE
N/PA
KITC .30 x
4.26
PLANTING 10 11
TOP OF PARKING
VOIDE +48.60 m 12
TOILE IBLE
TOP OF ROAD
+44.55 m
+44.85 m
PARKING GATE
BUILDABOVE
LIN
T
SS
E
FD
ING
HIS
ACCE
LIFT 2.58 WIN LANDSCAPE
DN 2.00
x
TD2
G3 PHE HER
B
E
0m
TD2
OF SLA
OR
IES
1.80
CLIENT NAME
T
B
M WID
TOILE
+48.3
E PA
LAD
SSAG
TOILE S
T
TOP
E
GENT
+48.6 AT
FD
PHE
0m
WITH LASER CUT GRILL IN CORE 10 MATERIAL 1:12
V
RAMP
SLAB
SEMI COVERED PASSAGE TD1
CLASS
SLAB AT ROOM
D2
W.C
D2
ENTRY FOR _ UG
D2
D2
6.23 07
x 9.8
+48.60 m 0
LADIES TOILET
GENTS TOILET
CAR ONLY TD1
CHANGE
CHANGE
E
ROOM
ROOM
CLA
D2
AG SS RO
SS TD1
+48.00 m
D2
OM_
D2
E PA
W2
DOUBLE HEIGHT ID W.C
TD1
6.15 UG 08 LIFT
x 9.8 TOP OF ROAD
MW
W.C TD1
CHANGE
CHANGE
0
ROOM
ROOM
W.C
PARKING
V1
V1 W.C
CLASS
ROOM
D2
D2
GAME ROOM
V1
_ UG F.F.L FRONT AREA
06 6.15
W2
V1
x 9.8 09 +48.90 M
_ UG V1 0
OM
FOR 15NOS CARS SLAB AT CL
AS
S RO
x 9.
45
CLA
SS RO
6.15
OM_
UG 10 SE
RV
ICES
CT
D2
D2
D2
D2
+48.60 m 5.95 x 9.8 DU
0
SHOWER
SHOWER
SHOWER
SHOWER
05 CHAPE +48.60 m
_ UG
D1
L
D1
OM 5.95
UP
1M WIDE PASSAGE
1M WIDE PASSAGE
x 9.8 FFL
S RO 0 +48.00 m
AS 45
P-00
CL x 9.
SITTING &
SITTING &
A
LOCKER
LOCKER
1:10 RAMP
6.13
G4
SLAB OVER
FOR PARKING BASEMENT
RAMP TO PARKING
+45.1
B BELLOW
WIN
+47.55 m
5 TO
DD
S
04
1.10 SLOP +44.85 m
+48.4
FG2
_ UG
SLOPE 1:12
OM
TOP OF ROAD S RO
5 TO
DD
A
+46.9
AS 9.45
CL
5TOS
3x
S
+46.5
SWIMMING POOL
12.4
+46.0
TOS
ENTRANCE
LVL +.45
5 TOS
+44.55 m
+45.6
+45.00 m
FFL. 48.45
0 TOS
EA
DD
+45.1
MID
C
TY
+46.9
A
LAND5 FFL
AC SLAB AT
1:12 RAMP
+48.15 m
WITH DECK
DD
ENTRY FOR
FG2
FFL
UP
PROJECT NAME
A
0 TO
DD
PLAY AREA SLAB OVER
S
FFL
BASEMENT
+46.95 m
TERMINALIA CATAPPA
+46.25 m
TOP OF ROAD
+44.1 m
+44.5 m
TREES
PROPOSED EDU-01 SCHOOL BUILDING OF
W3
EFX546
GYNASIUM
1:12 RAMP +44.5m
+44.5 m TOP OF ROAD
SLOPE 1:12
TOP OF ROAD +46.95 m
DD
CHANGE
CHANGE
CHANGE
CHANGE
CHANGE
CHANGE
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
D2
D2
D2
D2
D2
D2
GENTS CHANGE ROOM LADIES CHANGE ROOM
D1
D1
F.F.L PAVED
FLOORING PATTERN
BEARING SURVEY NO. 40/1 & OTHERS AT VILLAGE
+49.05M
W4
F.F.L PATHWAY
+49.05M
T.O LAWN
SUB CONSULTANT
INTROSPECTIVE SPACE
WITH SEATING
F.F.L PATHWAY
FILE PATH : F:\HSA WORK\FATHER AGNEL SCHOOL LANDSCAPE\FINAL ALL LAYOUT\LANDSCAPE LAYOUT.dwg
+49.05M
PLAY WALL
WITH VARIOUS SIZE OPENINGS,
EQUIPMENT , PERGOLA, ETC. IN DIFFERENT HEIGHTS
FOOTBALL GROUND
(AS SUGGESTED BY STRUCTURAL CONSTANT)
CONNECTING STEPS
(DETAILED AS PER STRUCTURAL CONSULTANT )
HER
HIS
F.F.L PATHWAY
+49.05M
RUNNING TRACK
ARCHITECTS
BOUNDARY WALL
HEIGHT +2.40M FROM FFL
F.F.L PATHWAY
+49.05M
BASKETBALL COURT
PRESENTATION PLAN
+48.15 M
+48.30 M
+48.45 M
+48.60 M
+48.75 M
+48.90 M
F.F.L PATHWAY
+48.60M
F.F.L PAVED
+48.00 M
HER HANDICAP
HIS
NTS A2 21.04.2020
1 LD-PP-PG-003 01