ENQUIRY Report Creation Generation
ENQUIRY Report Creation Generation
Generation
In Temenos T24
Contents
Introduction ......................................................................................................................................... 3
Creation of ENQUIRY.REPORT ....................................................................................................... 4
Step 1: We need to Setup DE.FORM.TYPE and PRINTER.ID for REPORT.CONTROL ......................... 4
Step 2: Now let’s create REPORT.CONTROL...................................................................................... 4
Step 3: ENQUIRY crea�on: File/nofile ENQUIRY based on the requirement.................................... 5
Step 4: Now, a VERSION for ENQUIRY.REPORT is required to run the report. ................................. 6
Generation of ENQUIRY.REPORT .................................................................................................. 6
Step 5: Now let’s Verify the ENQUIRY.REPORT to generate the Report. .......................................... 6
Step 6: A�er verifying the report will be generated in HOLD.CONTROL . So, we can create an
ENQUIRY to show our desired report. ................................................................................................ 7
Step 11: Now let’s run the ENQUIRY and click on the icon to see.................................................... 8
MD Shibli Mollah
T24 Technical Analyst
Introduction
ENQUIRY.REPORT is an applica�on which generates a report based on the
parameters defined in the file ENQUIRY. It can be run either as an on-line request,
using the Verify func�on, or requested during the end of day via the job EB.PRINT.
Reports can be requested in FILE format if informa�on is required for processing
outside T24.
To request during EOD(End of Day) the following should be entered in the data field
of the batch record:
6.1 JOB.NAME...... EB.PRINT 11.1.1 DATA.......... ENQ XXXXX
Where XXXXX is the ENQUIRY.REPORT id.
This ENQUIRY.REPORT record should contain the ID of the ENQUIRY, any sort or
selec�on criteria and the report control ID for spooling.
MD Shibli Mollah
T24 Technical Analyst
Creation of ENQUIRY.REPORT
MD Shibli Mollah
T24 Technical Analyst
Step 3: ENQUIRY crea�on: File/nofile ENQUIRY based on the requirement.
MD Shibli Mollah
T24 Technical Analyst
Step 4: Now, a VERSION for ENQUIRY.REPORT is required to run the report.
Generation of ENQUIRY.REPORT
MD Shibli Mollah
T24 Technical Analyst
Step 6: A�er verifying the report will be generated in HOLD.CONTROL . So, we can
create an ENQUIRY to show our desired report.
MD Shibli Mollah
T24 Technical Analyst
Step 11: Now let’s run the ENQUIRY and click on the icon to see.
MD Shibli Mollah
T24 Technical Analyst
MD Shibli Mollah
T24 Technical Analyst