0% found this document useful (0 votes)
30 views

Coordinated With The Following Discipline: Jabal Omar Development Project in Makkah

Uploaded by

mostafa90k100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

Coordinated With The Following Discipline: Jabal Omar Development Project in Makkah

Uploaded by

mostafa90k100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1-FA shop drawings shall be coordinated with the approved materials and manufacture

recommendation
2-FA shop drawings shall be coordinated with fire fighting shop drawings ,HVAC shop Key
drawings,security shop drawings....etc. .
3-All cables used for survivability of required critical circuits (fire pumps, smoke fans, pressurization

SP 4

SP 5
SP 2
fans,motorized dampers, emergency lighting, fire alarm system, voice evacuation system,..... etc.)

P2
P1

P3-4
shall be fire resistance type, listed in accordance with UL2196.electrical circuit protective systems

P9
shall be installed in accordance with their listing requirements.

PS1
P10

P5
P1 1
4-No.of devices per loop shall not exceeded 80% from the loop capacity ... CREST LINE

5-Contractor is responsible for adding or changing works at site as per site visit comments.

P8
6-Part number shall be indicated in the legend on each item as per approved materials

SP 4

P6
7-Detection & notification loops shall be consistent with the building fire zoning.

SP 5
8-Contractor is responsible for adding any required devices to complete the fire alarm system as per P9-MASTER
approved electrical , mechanical ,life safety drawings and approved cause and effect matrix.
9-Fire alarm drawings shall be revised and stamped from manufacturer/supplier.
10-CM/MM locations and numbers shall be coordinated with approved mechanical drawings
(typical).
11-All devices located in outdoor spaces or wet areas shall be weather proof type.
12-Cable sizes shall be as per approved V.D calculations and manufacturer recommendations
(typical).
13-Manual fire alarm boxes shall be located not more than 1500 mm from the entrance to each exit.

RELAY
BOX-01

BPS 06
RELAY
BOX-03

RELAY
BOX-02

RELAY
BOX-04

COORDINATED WITH THE FOLLOWING DISCIPLINE


BPS 05

Arch Struct Mech Plumbing Elect

REFERENCE DRAWINGS
ARCHITECTURAL STRUCTURAL ELECT
DRAWING No. REV. DRAWING No. REV. DRAWING No. REV.
883-4-S09-P09S-DC04-RMC-FC-B02-A0-03-102 00 883-4-S09-P09S-DC04-RMC-FC-B02S0-07-013 00 883-4-S09-P09S-DC04-RMC-FC-B02-ED-06-102 00

RELAY
BOX-05
883-4-S09-P09S-DC04-RMC-FC-B02-ED-06-103 00

BPS 04
883-4-S09-P09S-DC04-RMC-FC-B03-ED-06-101 00

883-4-S09-S09Z-DC04-RMC-FC-S00-EF-04-101 00

883-4-S09-S09Z-DC04-RMC-FC-S00-E0-01-101 00

RELAY
BOX-01 02 SUBMITTED FOR APPROVAL 07-01-2016

01 SUBMITTED FOR APPROVAL 16-02-2015

00 SUBMITTED FOR APPROVAL 31-01-2015

REV. DESCRIPTION DATE

RELAY
BOX-03 REVISIONS

check detection
inside lockers. XXX / XXX / L01 / XX / 001 / LOCATION

RELAY
BOX-02

LOCATION
Check detection coverage .As per NFPA 72 SEC (17.6.3.1.1) , (Typical)
(1)The distance between detectors shall not exceed their listed spacing, and DEVICE NUMBER
JABAL OMAR DEVELOPMENT PROJECT
there shall be detectors within a distance of one-half the listed spacing, DEVICE TYPE
IN MAKKAH
measured at right angles from all walls or partitions extending upward to within LOOP NUMBER
the top 15 percent of the ceiling height.
FLOOR OWNER:
(2)All points on the ceiling shall have a detector within a distance equal to or less
than 0.7 times the listed spacing (0.7S). TOWER Jabal Omar Development Co.
NOTE:
TOWER: 1/ S09 FOR HOTEL AREA
2/ P09S FOR PODIUM AREA
PROJECT MANAGER:

MAIN CONSULTANT:

URBAN DESIGNERS: Design development coordinator

ATELIERS LION
ASSOCIES
INGEROP
Engineers

SUPERVISION CONSULTANT:

MAIN CONTRACTORS:

AL-FUTTAIM ENGINEERING & TECHNOLOGIES LTD.

Title

OVERALL BASEMENT 02 FLOOR PLAN -


FIRE ALARM SYSTEM LAYOUT

DRAWN BY: W.A CHECKED BY: ENG.M. ABDULGADER APPROVED BY: ENG.ANSAR KHAN

DRAWING NUMBER :
Phase Drawing
Project Code Number Zone/Area Tower Name Work Package Company Name Drawing Type Floor Type Discipline Group Serial Number Revision

8 8 3 4 S 0 9 P 0 9 S CN 1 2 RCC SH B 0 2 E F 0 3 1 0 2 0 0 3
DATE:
07/01/2016

SCALE