Program of Works Sample Buga Nhs
Program of Works Sample Buga Nhs
DEPARTMENT OF EDUCATION
EDUCATION FACILITIES DIVISION
DepEd Complex, Meralco Avenue, Pasig City
UNIT COST
JANUARY 2019
DIVISION OFFICE :
CITY/ MUNICIPALITY :
PROVINCE :
REGION :
Page 1 of 14
ITEM NO. DESCRIPTION UNIT UNIT COST
W - 2, ( 1.3 x 1.6 m) Jalousie Window with Clear
Glass Blades on JalouPlus Type Silver Colored
6.1050 Frame and Fixed Clear Glass Transom on 50 x set 5,072.00 760.80
150 mm Wooden Jamb complete with
Accessories
Page 5 of 14
Republic of the Philippines
DEPARTMENT OF EDUCATION
SCHOOLS DIVISION OF ILOILO
DISTRICT OF LEON II
BUGA NATIONAL HIGH SCHOOL
Brgy. Buga, Leon , Iloilo
PROGRAM OF WORKS
PROJECT Repair and Re-painting of Ceiling of Classrooms (Grade 9-Cattleya and Teen Center)
PROJECT #
LOCATION : BUGA NATIONAL HIGH SCHOOL
SUBJECT : DETAILED ESTIMATED OF MOOE
SOURCE OF FUND : 3rd Quarter MOOE 2023
STARTING DATE : UPON APPROVAL
NO. OF CALENDAR
OF DAYS TO : 15 CALENDAR DAYS
COMPLETE
DETAILED ESTIMATE
6 of 14
Republic of the Philippines
DEPARTMENT OF EDUCATION
SCHOOLS DIVISION OF ILOILO
DISTRICT OF LEON II
BUGA NATIONAL HIGH SCHOOL
Brgy. Buga, Leon , Iloilo
PROGRAM OF WORKS
PROJECT Painting/Repainting of Plantbox, Walls and Signages
PROJECT #
LOCATION : BUGA NATIONAL HIGH SCHOOL
SUBJECT : DETAILED ESTIMATED OF MOOE
SOURCE OF FUND : 2nd Quarter MOOE 2023
STARTING DATE : UPON APPROVAL
NO. OF CALENDAR
OF DAYS TO : 10 CALENDAR DAYS
COMPLETE
DETAILED ESTIMATE
7 of 14
Republic of the Philippines
DEPARTMENT OF EDUCATION
SCHOOLS DIVISION OF ILOILO
DISTRICT OF LEON II
BUGA NATIONAL HIGH SCHOOL
Brgy. Buga, Leon , Iloilo
PROGRAM OF WORKS
PROJECT : RENOVATION AND REPAIR OF ELECTRICAL SYSTEM (Phase II)
PROJECT # : ROOM 11-19
LOCATION : BUGA NATIONAL HIGH SCHOOL
SUBJECT : DETAILED ESTIMATED OF MOOE
SOURCE OF FUND : 1st Quarter MOOE 2023
STARTING
NO. DATE
OF CALENDAR : UPON APPROVAL
OF DAYS TO
: 6CALENDAR DAYS
COMPLETE
DETAILED ESTIMATE
PROGRAM OF WORKS
PROJECT : RENOVATION AND REPAIR OF ELECTRICAL SYSTEM (Phase I)
PROJECT # : ROOM 1-10
LOCATION : BUGA NATIONAL HIGH SCHOOL
SUBJECT : DETAILED ESTIMATED OF MOOE
SOURCE OF FUND : 4th Quarter MOOE 2022
STARTING
NO. DATE
OF CALENDAR : UPON APPROVAL
OF DAYS TO
: 6CALENDAR DAYS
COMPLETE
DETAILED ESTIMATE
36,699.00 9,174.75
PRE-REPAIR INSPECTION
Name of Project : Renovation and Repair of Electrical System
Location : SEDP BUILDING -Classroom
Findings :
Damage,obsolete and not functioning panel box, circuit breakers ,wirings, switch, outets ,
sockets and surface outlets.
Date of Inspection : November 28, 2022
PICTURES
Inspected by:
(Member of Inspectorate Team)
Verified correct:
LOIDA C. CATALINIO
School Head
Noted:
MILDRED G. LLAVANES
Division Engineer
Republic of the Philippines
Department of Education
Region VI - Western Visayas
DIVISION OF ILOILO
District of Leon II
BUGA NATIONAL HIGH SCHOOL
Buga, Leon, Iloilo
PRE-REPAIR INSPECTION
Name of Project : Renovation and Repair of Electrical System
Location : SEDP BUILDING -Classroom
Findings :
Damage,obsolete and not functioning panel box, circuit breakers ,wirings, switch, outets ,
sockets and surface outlets.
Date of Inspection : November 28, 2022
PICTURES
Inspected by:
(Member of Inspectorate Team)
Verified correct:
LOIDA C. CATALINIO
School Head
Noted:
MILDRED G. LLAVANES
Division Engineer
Republic of the Philippines
Department of Education
Region VI - Western Visayas
DIVISION OF ILOILO
District of Leon II
BUGA NATIONAL HIGH SCHOOL
Buga, Leon, Iloilo
PICTURES:
Inspected by:
(Member of Inspectorate Team)
Percent of
Item Description Unit Item Description Unit Percent of Labor
Labor
Earthworks Steel Works
Clearing and Grubbing sq.m 20.00 C-Purlins lnght 30.00%
Structural Excavation cu.m 200.00 Angle Bar lnght 30.00%
Backfilling and Compaction cu.m 45.00 Flat Bar lnght 30.00%
Gravel Bedding G-1 cu.m 20.00% Plain Round Bar pc 30.00%
Soil Poisoning sq.m 35.00% Square Bar pc 30.00%
Select Fill cu.m 35.00% Steel Plate pc 30.00%
Concreting Works Tubular lnght 30.00%
Portland Cement bag 24.00% . pc 30.00%
Crushed Gravel 3/4" & 1" cu.m 35.00% Anchor Bolt with Nuts and Washer pc 30.00%
Waterproofing
Waterproofing, Elastomeric gal 30.00%
Carpentry Works Plumbing Works
Removal of Ceiling sq.m 8.00 uPVC Water Line 1/2"Ø pc 35.00%
Plywood, Ordinary 1/2" x 4' x 8' pc 32.00% G.I. Pipe pc 28.00%
Fiber Cement Board, 1/4" x 4' x 8' pc 27.00% G.I. Tee pc 35.00%
Metal double furring channel (19mm x
pc 35.00% G.I. Elbow 90o pc 35.00%
50mm x 5mts. X .80mm thk.)
Rough Lumber, Sun Dried, Tanguile bd.ft 35.00% Gate Valve, 1/2"Ø pc 35.00%
S4S Lumber, Kiln Dried, Tanguile bd.ft 27.00% Check Valve, Horizontal pc 35.00%
Fascia Board, Wooden bd.ft 27.00% Faucet, Plain Bibb, Brass pc 35.00%
Water Closet 1.6gpf with
Fascia Board, Fiber Cement 10" x 8' pc 27.00% set 27.00%
Accessories
Finishing Nails kg 27.00% Urinal 0.8gpf set 24.00%
Concrete Counter Sink Type, with
Common Wire Nails kg 27.00% Lever Type Faucet and Complete set 21.00%
Accessories
Concrete Nails kg 27.00% S.S.Floor Drain 4' x 4" pc 20.00%
T&G 3/4" x 4" ft 27.00% Teflon Tape roll 20.00%
Acoustic Board 2' x 4' pc 27.00% Tissue Holder pc 20.00%
Main Tee Runner 1" x 1" x 10' pc 27.00% S.S. Grab Rail 1-1/2"Ø set 14.00%
Cross Tee 1" x 1" x 10' pc 27.00% Mirror sq.ft 19.00%
Wall Angle 1" x 1" x 10' pc 27.00% Faucet, Lavatory set 19.00%
Suspension Rod #8 kg 27.00% Faucet, Sink set 20.00%
Wood Preservative, Brown L 27.00% S.S. Sink with Strainer and P-Trap set 20.00%
S.S. Cabinet Handle pc 27.00% Stainless Water Tank (800 Liters) set 18.00%
Panel Box, Flush Type, 6 Branches set 20.00% Paint Thinner gal 35.00%
Fire Alarm Control Panel, One Zone set 21.00% Paint Brush pc 35.00%