D Drum CA R: Key Plan 6 5 4 3 2 7 8 9 10 11 12 13
D Drum CA R: Key Plan 6 5 4 3 2 7 8 9 10 11 12 13
2 3 4 5 6
7 13
8 9
10 11 12
LEGEND
APPLICATION BOUNDARY
EXISTING WAYLEAVE
8m
2.5 m PROPOSED JOINT BAY
PROPOSED C2 CHAMBER
PROPOSED C2
8200
COMMUNICATIONS PROPOSED JOINT BAY
CHAMBER 12
6700
6600
6800
8100
PROPOSED
PROPOSED JOINT BAY TEMPORARY
6900
8000
11 PASSING BAY
AR
7900
DRUMC
7000
7800
ROAD
7200
L
7100
7700
226
7600
SCALE BAR:
7500
50 100 150 200 250 m
74
0
00
730
0
CLIENT
APPROVAL PLANNING X TENDER CONSTRUCTION AS-BUILT
Client
ORIEL WINDFARM LTD
Project
Ri
verDe
e River Dee ORIEL WIND FARM PROJECT
An
Nít
h An Níth
Contract
Drawing Title
Cappoge
Bridge
ONSHORE CABLE ROUTE
SITE LOCATION MAP
SHEET 6 OF 13
Production Unit
Civil, Environmental and Renewable Engineering
COPYRIGHT C ESB
All rights reserved. No part of this work may be modified or reproduced or copied in any form
or by any means - graphic, electronic or mechanical, including photocopying, recording, ORDNANCE SURVEY IRELAND MAP SHEET 2012
Tailte Éireann Licence No. EN 0023719-24 ©Tailte Éireann/
Government of Ireland
PE605-D027-104-006-001
taping or information-and-retrieval system, or used for any purpose other than its designated
purpose, without the written permission of ESBI Engineering & Facility Management Ltd.