0% found this document useful (0 votes)
31 views

D Drum CA R: Key Plan 6 5 4 3 2 7 8 9 10 11 12 13

Uploaded by

김대환
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

D Drum CA R: Key Plan 6 5 4 3 2 7 8 9 10 11 12 13

Uploaded by

김대환
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

2 3 4 5 6
7 13
8 9
10 11 12

LEGEND
APPLICATION BOUNDARY

PROPOSED 220 kV ONSHORE CABLE ROUTE

PROPOSED FIBRE CABLE ROUTE

EXISTING HIGH VOLTAGE OVERHEAD LINE

EXISTING MEDIUM VOLTAGE OVERHEAD LINE

EXISTING LOW VOLTAGE OVERHEAD LINE

EXISTING MEDIUM VOLTAGE UNDERGROUND


CABLE

EXISTING LOW VOLTAGE UNDERGROUND CABLE

EXISTING WATER MAIN

EXISTING GRAVITY SEWER

EXISTING STORM WATER DRAIN

EXISTING HIGH PRESSURE TRANSMISSION


GAS MAIN

EXISTING TELECOMS OVERHEAD LINE


SEE SHEET PE605-D027-105-005 FOR CONTINUATION

EXISTING TELECOMS UNDERGROUND CABLE

SEE SHEET PE605-D027-105-007 FOR CONTINUATION


8m
2.5 m PROPOSED JOINT BAY

PROPOSED C2 CHAMBER

PROPOSED LINK BOX CHAMBER

EXISTING HV PYLON

EXISTING HV WOODPOLE SET

NOTES :
1. FOR PLANNING PURPOSES ONLY, NOT FOR CONSTRUCTION

2. ALL DIMENSIONS IN METERS, UNLESS OTHERWISE NOTED

3. THE CABLE SHALL BE INSTALLED WITHIN THE


SITE BOUNDARY. THE FINAL ALIGNMENT WITHIN THE
SITE BOUNDARY SHALL BE DETERMINED FOLLOWING DETAILED
DESIGN, WHICH WOULD PROCEED POST-PLANNING.

4. THE SITE BOUNDARY IS THE EXTENT OF THE


PROPOSED PROJECT SITE. IT SHOULD BE ASSUMED TO EXTEND
TO THE EDGE OF THE CARRIAGEWAY ALONG PUBLIC ROADS,
EXCEPT WHERE OTHERWISE INDICATED.

5. 220 kV CABLES TO BE INSTALLED AS PER DRAWING


PE605-D027-083-001 (LATEST REVISION), WHICH IS A TYPICAL
TRENCH LAYOUT. THE OVERALL DEPTH, WIDTH AND FORMATION
OF THE TRENCH MAY CHANGE, DEPENDING ON GROUND
CONDITIONS AND DETAILED DESIGN.

6. THE UTILITIES RECORDS SHOWN ARE THE RECORDS ONLY IN


THE IMMEDIATE VICINITY OF THE SITE BOUNDARY

8200
PROPOSED JOINT BAY
12
REFERENCE DRAWINGS:
6700
6600

6800

8100
PROPOSED JOINT BAY
6900

8000
11

AR

7900
DRUMC
7000

7800
ROAD
7200

L
7100

7700
226

7600
SCALE BAR:

7500
0 50 100 150 200 250 m

74
00
730
0

001 UPDATED AS PER RPS COMMENTS

000 31/01/24 FIRST ISSUE NB NB RD MH

REV. DATE REVISION DESCRIPTION DRN PROD VER APP

PURPOSE OF ISSUE - PRELIMINARY UNLESS INDICATED

CLIENT
APPROVAL PLANNING X TENDER CONSTRUCTION AS-BUILT

Client
ORIEL WINDFARM LIMITED
RIVER DEE

Project

ORIEL WIND FARM PROJECT

Contract

Drawing Title
Cappoge
Bridge
EXISTING UTILITIES
AND PROPOSED DEVELOPMENT
SHEET 6 OF 13

Production Unit
Civil, Environmental and Renewable Engineering

DRAWN PRODUCED VERIFIED APPROVED APPROVAL DATE

Begley_G Bell_Neil R.Doyle M.Hogan 15/02/2024

CLIENT REF No. OF SHTS SIZE SCALE

TC228657 6/13 A1 1:2500

DRAWING NUMBER SHEET REV

COPYRIGHT C ESB
All rights reserved. No part of this work may be modified or reproduced or copied in any form
or by any means - graphic, electronic or mechanical, including photocopying, recording, ORDNANCE SURVEY IRELAND MAP SHEET 2012
Tailte Éireann Licence No. EN 0023719-24 ©Tailte Éireann/
Government of Ireland
PE605-D027-105-006-001
taping or information-and-retrieval system, or used for any purpose other than its designated
purpose, without the written permission of ESBI Engineering & Facility Management Ltd.

You might also like