6
6
108.930Km TO 162.700Km of NH-326 in the state of Odisha on EPC mode. for the year 2024-25.”
Sl.N Details of Construction TCS Type Length in m CD & VUP Net length in m
o. length in m
1 Strengthening DL+PS Flexible Pavement TCS-I 1750.00 1750.00
Concentric Widening Portion (DL TO DL+PS) Flexible
2 TCS-II 23088.00 23088.00
Pavement
Eccentric Widening Portion (DL TO DL+PS) Flexible
3 TCS-III 2172.00 2172.00
Pavement
Re-construction Filling Portion (DL TO DL+PS) Flexible
4 TCS-IV 15301.00 15301.00
Pavement
Re-construction Cutting Portion (DL TO DL+PS)
5 TCS-V 7330.00 7330.00
Flexible Pavement
6 Strengthening Four Lane Flexible Pavement TCS-VI 670.00 670.00
Total Rs 1008769751.49