0% found this document useful (0 votes)
16 views

New Microsoft Excel Worksheet

Uploaded by

uttamojha1985
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

New Microsoft Excel Worksheet

Uploaded by

uttamojha1985
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

SITE INSPECTION PROTOCOL

(EPC Power Plants, Boilers & Sugar Machinery Division)

EPC
BAR BENDING SC
PROJECT : FGD SYSTEM NTPC GADARWARA (MP)
NAME OF THE CONTRACTOR : ISGEC HEAVY ENGINEERING LIMITED
LOCATION / STRUCTURE:-FOUNDATION (PILE LAYOUT & PILE CAP) QUENCH WATER TANK
OF QUENCH WATER TANK
REF DRAWING NO : EC0022-75990875-CIV-0020 9572-109-PVC-B-192 , R-2
Spacing of No.of
S.NO Member Type of Bar Shape / Shape Code Dia of Bar
Bar Member

P2 1300 X 1100 3 NOS FOR PC0


COLUMN 4985 300
1
VERTICAL BAR 300 25 3
1220 1020 1220
2 Main Ring
80 1020 80 8 200 3
209 1020 209
3 Small Ring
80 1020 80 8 200 3
181 1220 181
4 Small Ring
80 1220 80 8 200 3
P2 1300 X 1100 1 NOS FOR
COLUMN 4985 300
1
VERTICAL BAR 300 25 1
1220 1020 1220
2 Main Ring
80 1020 80 8 200 1
209 1020 209
3 Small Ring
80 1020 80 8 200 1
181 1220 181
4 Small Ring
80 1220 80 8 200 1
P3 800 X 600 1 NOS FOR
COLUMN 4985 300
1
VERTICAL BAR 300 25 1
520 720 520
2 Main Ring
80 720 80 8 200 1
201 720 201
3 Small Ring
80 720 80 8 200 1
267 520 267
4 Small Ring
80 520 80 8 200 1
P4 400 X 400 1 NOS FOR
COLUMN 3960 300
1
VERTICAL BAR 300 12 1
320 320 320
2 Main Ring
80 320 80 8 200 1
125 320 125
3 Small Ring
80 320 80 8 200 1
125 320 125
4 Small Ring
80 320 80 8 200 1
P4A 400 X 400 1 NOS FOR
COLUMN 3960 300
1
VERTICAL BAR 300 12 1
320 320 320
2 Main Ring
80 320 80 8 200 1
125 320 125
3 Small Ring
80 320 80 8 200 1
125 320 125
4 Small Ring
80 320 80 8 200 1

SIGN
NAME
AGENCY PREPARED BY ISGEC CIVIL
Inspection by ISGEC does not in any way absolve the Erection Contractorfrom their responsibility to fullfill the requirement.
ROTOCOL Date: 18/05/2021
Machinery Division)

BAR BENDING SCHEDULE

ANK

No.of bar Cutting


Total No of Total 8Ǿ 10Ǿ 12Ǿ 16Ǿ 20Ǿ 25Ǿ
per Length(MM
Bars Length(M)
Members )
1100 3 NOS FOR PC02 GRID A-2 , B-1 & B-2
-- -- -- -- -- 464.940
28 84 5535 464.940
317.400 -- -- -- -- --
23 69 4600 317.400
533.823 -- -- -- -- --
69 207 2579 533.823
604.795 -- -- -- -- --
69 207 2922 604.795
00 X 1100 1 NOS FOR PC03 GRID A-1
-- -- -- -- -- 154.980
28 28 5535 154.980
101.200 -- -- -- -- --
22 22 4600 101.200
170.205 -- -- -- -- --
66 66 2579 170.205
192.833 -- -- -- -- --
66 66 2922 192.833
00 X 600 1 NOS FOR PC03 GRID A-1
-- -- -- -- -- 66.420
12 12 5535 66.420
57.200 -- -- -- -- --
22 22 2600 57.200
43.149 -- -- -- -- --
22 22 1961 43.149
37.283 -- -- -- -- --
22 22 1695 37.283
400 X 400 1 NOS FOR F04 GRID A-3
-- -- 54.432 -- -- --
12 12 4536 54.432
29.400 -- -- -- -- --
21 21 1400 29.400
21.224 -- -- -- -- --
21 21 1011 21.224
21.224 -- -- -- -- --
21 21 1011 21.224
400 X 400 1 NOS FOR F04 GRID B'-3
-- -- 54.432 -- -- --
12 12 4536 54.432
29.400 -- -- -- -- --
21 21 1400 29.400
21.224 -- -- -- -- --
21 21 1011 21.224
21.224 -- -- -- -- --
21 21 1011 21.224

Total length 2201.584 0.000 108.864 0.000 0.000 686.340


Unit weight in Kg 0.395 0.617 0.888 1.580 2.470 3.860
Total weight in MT 0.870 0.000 0.097 0.000 0.000 2.649
Net weight in MT 3.616

C CIVIL NTPC CCD


28Ǿ 32Ǿ

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --
-- --

-- --

-- --

-- --

-- --

-- --

0.000 0.000
4.830 6.321
0.000 0.000
SITE INSPECTION PROTOCOL
(EPC Power Plants, Boilers & Sugar Machinery Division)

EPC
BAR BENDING SCH
PROJECT : FGD SYSTEM NTPC GADARWARA (MP)
NAME OF THE CONTRACTOR : ISGEC HEAVY ENGINEERING LIMITED
LOCATION / STRUCTURE:-FOUNDATION (PILE LAYOUT & PILE CAP) QUENCH WATER TANK
OF QUENCH WATER TANK
REF DRAWING NO : EC0022-75990875-CIV-0020 9572-109-PVC-B-192 , R-2
Spacing of No.of
S.NO Member Type of Bar Shape / Shape Code Dia of Bar
Bar Member

PC02 2700 X 2700 X 1000 3 NOS UNIT


FOOTING 600 600
1 BOTTOM
BAR 2600 20 125 3
FOOTING 600 600
2 BOTTOM
BAR 2600 20 125 3
FOOTING 600 600
3
TOP BAR 2600 16 125 3
FOOTING 600 600
4
TOP BAR 2600 16 125 3
1000 2600 2100
5 FACE BAR
2100 2600 1000 10 300 3
798 1000 798
6 CHAIR
+

350 350 25 1000 3


PC03 3100 X 3100 X 1200 NOS
FOOTING 700 700
1 BOTTOM
BAR 3000 20 125 1
FOOTING 700 700
2 BOTTOM
BAR 3000 20 125 1
FOOTING 700 700
3
TOP BAR 3000 16 125 1
FOOTING 700 700
4
TOP BAR 3000 16 125 1
3000 3000
5 FACE BAR
+

3000 2000 3000 10 300 1


998 1000 998
6 CHAIR
+

350 350 25 1000 1


F04 1500 X 1500 X 400 2 NOS UNI
FOOTING 225 225
1 BOTTOM
BAR 1400 20 150 2
FOOTING 225 225
2 BOTTOM
BAR 1400 20 150 2
FOOTING 225 225
3
TOP BAR
FOOTING
3
TOP BAR 1400 10 150 2
FOOTING 225 225
4
TOP BAR 1400 10 150 2
260 1000 260
5 CHAIR

+
350 350 25 1000 2

SIGN
NAME
AGENCY PREPARED BY ISGEC CIVIL
Inspection by ISGEC does not in any way absolve the Erection Contractorfrom their responsibility to fullfill the requirement.
ROTOCOL Date: 30/06/2023
Machinery Division)

BAR BENDING SCHEDULE

ER TANK

No.of bar Cutting


Total No of Total 8Ǿ 10Ǿ 12Ǿ 16Ǿ 20Ǿ 25Ǿ
per Length(MM
Bars Length(M)
Members )
2700 X 1000 3 NOS UNIT -2 GRID A-2 , A-1 & B-2
-- -- -- -- 248.160 --
22 66 3760 248.160
-- -- -- -- 248.160 --
22 66 3760 248.160
-- -- -- 248.688 -- --
22 66 3768 248.688
-- -- -- 248.688 -- --
22 66 3768 248.688
-- 136.320 -- -- -- --
4 12 11360 136.320
-- -- -- -- -- 37.152
4 12 3096 37.152
3100 X 3100 X 1200 NOS UNIT -2 GRID B-1
-- -- -- -- 109.000 --
25 25 4360 109.000
-- -- -- -- 109.000 --
25 25 4360 109.000
-- -- -- 109.200 -- --
25 25 4368 109.200
-- -- -- 109.200 -- --
25 25 4368 109.200
-- 69.800 -- -- -- --
5 5 13960 69.800
-- -- -- -- -- 20.976
6 6 3496 20.976
X 1500 X 400 2 NOS UNIT -2 GRID A-3 & B-3
-- -- -- -- 36.200 --
10 20 1810 36.200
-- -- -- -- 36.200 --
10 20 1810 36.200
-- 36.600 -- -- -- --
10 20 1830 36.600
-- 36.600 -- -- -- --
10 20 1830 36.600
-- -- -- -- -- 16.160
4 8 2020 16.160

Total length 0.000 279.320 0.000 715.776 786.720 74.288


Unit weight in Kg 0.395 0.617 0.888 1.580 2.470 3.860
Total weight in MT 0.000 0.172 0.000 1.131 1.943 0.287
Net weight in MT 3.533

C CIVIL NTPC CCD


28Ǿ 32Ǿ

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --

-- --
-- --

-- --

0.000 0.000
4.830 6.321
0.000 0.000
PROJECT:-Civil Work for Construction of 2*800 MW Super Thermal Power Plant for M/s NTPC GADARWARA.
EPC CONTRACTOR - M/s. ISGEC HEAVY ENGINEERING LTD
CONTRACTOR - M/s. NIYATI ENGINEERING PVT LTD
Working period- 30.06.2023
MEASUREMENT SHEET-SECTION -A
LENGTH
SR. NO DESCRIPTION Drawing No UNIT NOS
(M)
Section-A
1 Earthwork in Excavation in All Type of Soil & Backfilling in Earth Foundation….
(a) Up to 3.00m
(i) Cable tray support 02 9572-109-PVC-B-219-R09 Cum 1 5.250
Deduction P1 Cum 16 0.450
Deduction TBeam Cum 8 1.050
Cable tray support 02 9572-109-PVC-B-219-R09 Cum 1 5.250
Deduction P1 Cum 2 0.450
Deduction TBeam Cum 1 1.050

60% PAYABLE QTY(40% Hold for Backfillin


(b) Beyond 3.00m
Cable tray support 02 9572-109-PVC-B-219-R09 Cum 1 5.250
Deduction CF01 Cum 8 3.250

Cable tray support 02 9572-109-PVC-B-219-R09 Cum 1 5.250

Deduction CF02A Cum 1 3.250

60% PAYABLE QTY(40% Hold for Backfillin


t for M/s NTPC GADARWARA.
RA No:-
Date:-

ON -A
WIDTH DEPTH
QUANTITY REMARKS
(M) (M)

37.000 3.000 582.750 Gride no:-A&B/12to04


0.450 3.000 -9.720
0.300 0.300 -0.756
4.000 3.000 63.000 Gride no:-A&B/4'
0.450 3.000 -1.215
0.300 0.300 -0.095

Total 572.27 Cum


PAYABLE QTY(40% Hold for Backfilling) 343.36 Cum

37.000 0.575 111.694


2.000 0.600 -31.200

4.000 0.575 12.075 Gride no:-A&B/4'

2.000 0.600 -3.900

Total 80.49 Cum


PAYABLE QTY(40% Hold for Backfilling) 48.30 Cum
PROJECT:-Civil Work for Construction of 2*800 MW Super Thermal Power Plant for M/s NTPC GADARWARA.
EPC CONTRACTOR - M/s. ISGEC HEAVY ENGINEERING LTD
CONTRACTOR - M/s. NIYATI ENGINEERING PVT LTD
Working period-30.06.2023
MEASUREMENT SHEET-P C C & R C C work
SR. NO DESCRIPTION Drawing No UNIT Nos

P.C.C. 1:3:6 in Foundation &


1
Flooring
Crushed Limestone Storage Silo 9572-109-PVC-B-192-R02
PC02 Cum 3
PC03 Cum 1
F04 Cum 2
Tota
2 RCC M 25 including admixure
(a) Up to Plinth Level
QUENCH TANK 02 9572-109-PVC-B-192-R02
PC02 Cum 3
PC03 Cum 1
F04 Cum 2
Tota
5 Form work

(a) Up to Plinth Level


PCC QUENCH TANK 02 9572-109-PVC-B-192-R02
PC02 Sq.m 3
PC03 Sq.m 1
F04 Sq.m 2
RCC PC02 Sq.m 3
PC03 Sq.m 1
F04 Sq.m 2
COLUMN P2 Sq.m 3
P2 Sq.m 1
P3 1
P4 2
Total shatt
nt for M/s NTPC GADARWARA.
RA No:-
Date:-

C work
LENGTH WIDTH DEPTH
QUANTITY REMARKS
(m) (m) (m)

2.85 2.85 0.075 1.828


3.25 3.25 0.075 0.792
1.65 1.65 0.075 0.408
Total PCC Work 3.028 Cum

2.700 2.700 1.000 21.870


3.100 3.100 1.200 11.532
1.500 1.500 0.400 1.800
Total PCC Work 35.202 Cum

2.85 2.85 0.075 2.565


3.25 3.25 0.075 0.975
1.65 1.65 0.075 0.990
2.85 2.85 1 34.200
3.25 3.25 1.2 15.600
1.65 1.65 0.4 5.280
1.3 1.1 4.05 58.320
1.3 1.1 3.85 18.480
0.8 0.6 3.85 10.780
0.4 0.4 3.55 11.360
Total shattering Work 158.550 Sq.m
PROJECT:-Civil Work for Construction of 2*800 MW Super Thermal Power Plant for M/s NTPC GADARWARA.
EPC CONTRACTOR - M/s. ISGEC HEAVY ENGINEERING LTD
CONTRACTOR - M/s. NIYATI ENGINEERING PVT LTD
Working period-30.06.2023
MEASUREMENT SHEET-STRUCTURAL STEEL WORK
SR. NO DESCRIPTION UNIT NOS Weight QUANTITY

3 fixing Foundation
Bolt(Labour Rate)
QUENCH TANK 02
M56 Foundation Bolt MT 48 4429.000 4.429
Total 4.429
M/s NTPC GADARWARA.
RA No:-
Date:-30.06.2023

REMARKS

MT

You might also like